The Blue Line is a light rail line in the Sacramento Regional Transit District (SacRT) system. It runs primarily north–south in Sacramento between Watt/I-80 and Cosumnes River College. Along the route, the Blue Line serves North Highlands, North Sacramento, Downtown and South Sacramento. Portions of the Blue Line run along the original initial alignment between Watt/I-80 and 16th Street stations.

Line description

The Blue Line begins at its northern terminus, the Watt/I-80 station. From there it initially travels southwest in the median of I-80, utilizing a bridge from an abandoned freeway project, then parallels Roseville Road before turning westward paralleling Arden Way in North Sacramento. (It passes up the Siemens plant nearby.) Then the line turns southwest again running in the median of Del Paso Boulevard, merges into a single track crossing the 12th Street viaduct (Highway 160) over the American River. Reaching downtown, the Blue Line goes back to two tracks going south on 12th, turns west on K Street, and splits into one-way tracks for 7th and 8th Streets where it joins the Gold and Green Lines. It then turns westward on O Street, southward on 12th, then eastward in an alley paralleling Q and R Streets. After passing the 16th Street station, the Blue Line splits from the Gold Line (the Green Line terminates at 13th Street station), crossing under the Bee Bridge before going south in its own right-of-way into South Sacramento. It then jogs eastward along Cosumnes River Boulevard before crossing it and reaching its southern terminus at Cosumnes River College station.

History

The first light rail line of the SacRT opened March 12, 1987. Initial service commenced between Watt/I-80 and 8th & O stations only for the first six months. It was extended to Butterfield that same year on September 5. In all, it was an 18.3-mile (29.5 km) route between Watt/I-80 station in North Sacramento, through downtown, and continuing east on Folsom Boulevard to Butterfield Way station. It was built at a cost of $176 million ($499 million adjusted for inflation), which included the cost of vehicles and maintenance and storage facilities. Approximately $94 million of the funds needed for the project had been reallocated from a canceled plan to build a freeway to bypass I-80 Business.

Much of the line, when it was first built, was single-tracked, though improvements over the 1990s allowed much of the original system to be double-tracked. The line was built mainly using portions of the Sacramento Northern Railroad and Sacramento Valley Railroad right-of-ways, coupled with use of structures of an abandoned freeway project.[citation needed] A limited portion of the route runs on streets, mainly in downtown Sacramento.

The line became more popular than anyone anticipated, necessitating further expansions and improvements to the system.

SacRT has proposed extending the light rail system 11.2-mile (18.0 km) south to the town of Elk Grove in phases.

The first phase of the southern extension opened on September 26, 2003, with 6.3 miles (10.1 km) added from 16th Street to Meadowview. The extension added seven new stations to the system and runs parallel to a railroad right of way. The light rail system was reconfigured in June 2005 with the South Line connected to the Watt I-80/Downtown Line and designated as the Blue Line.

A train bound for Watt/I-80 in Downtown Sacramento, July 2019

The second phase of the southern extension opened more than a decade later on August 24, 2015, with 4.3 miles (6.9 km) added from Meadowview to Consumnes River College. The extension added seven new stations to the system. An additional station, Morrison Creek, was put on hold to open as an infill station until the adjacent land was developed. Eventually in 2021, despite the land around the station remaining undeveloped, Morrison Creek opened to the public as a station only accessible via pedestrian and bike paths. Sacramento RT added a large parking structure at Cosumnes River College to attract riders from southern Sacramento County and boost ridership.

A third planned phase which would extend the line from its current southern terminus to Elk Grove about 2 miles along Bruceville Road is on hold indefinitely due to a lack of funding. Land use and station accessibility must be improved to qualify the extension for Federal Transit Administration (FTA) grant funding. Construction on this project was not expected to begin until after 2040. In 2019, the city of Elk Grove prepared a study on improving e-tran Route 110 with bus rapid transit (BRT) characteristics. Route 110 mostly follows a similar alignment to the proposed Blue Line extension. In July 2024, the city of Elk Grove began conducting a feasibility study over whether to continue forward with the Blue Line extension or the BRT, considering five different light rail and BRT alternatives to expand transit to the city. In March 2026, the city released a draft implementation plan that recommended extending the light rail line to Kammerer Road. The city council is expected to decide upon the plan in spring 2026.

An additional infill station on the line called Dos Rios station is being constructed between the Globe and Alkali Flat/La Valentina stations in the Dos Rios Triangle neighborhood of North Sacramento. The station is planned as part of a new housing development project that is funded by California's cap and trade system, with an opening date set for September 2026.

Station listing

The following table lists the current stations of the Blue Line, from north to south.

Key
Closed station
Request stopRequest stop
StationOpenedTransfers
Watt/I-80March 12, 1987Sacramento Regional Transit: 1, 15, 26, 84, 93, 193Placer County Transit: 10
Watt/I-80 West
Roseville Road
Marconi/ArcadeSacramento Regional Transit: 25, 86, 87, SmaRT Ride Natomas-North Sacramento
Swanston
Royal OaksSacramento Regional Transit: 13, 23
Arden/Del PasoSacramento Regional Transit: 13, 15, 19, 23, 88, 113
Globe
Alkali Flat/La ValentinaSacramento Regional Transit: 33, 129
12th & ISacramento Regional Transit: 129, E10, E11, E12, E13, E14, E15, E16, E17, E18Roseville Transit: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10
Cathedral Square (westbound: 10th & K, eastbound: 11th & K)Sacramento Regional Transit: 30, 38, 62North Natomas JibeYolobus: 42A, 42B, 43, 43R, 230
St. Rose of Lima Park (eastbound: 9th & K)Sacramento Regional Transit: 30, 38, 62, 86, 88, 142 (Airport Express)North Natomas JibeYolobus: 42A, 42B, 43, 43R, 230
St. Rose of Lima Park † (southbound: 7th & K)Closed September 30, 2016
7th & Capitol (southbound) 8th & Capitol (northbound)SacRT light rail Gold GreenSacramento Regional Transit: 11, 30, 38, 51, 62, 86, 88, 102, 103, 106, 107, 109, 129, 134, 142 (Airport Express), E10, E11, E12, E13, E14, E15, E16, E17, E18North Natomas JibeRoseville Transit: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10Yolobus: 42A, 42B, 43, 43R, 230
8th & OSacRT light rail Gold GreenSacramento Regional Transit: 11, 51, 102, 103, 106, 107, 109, E10, E11, E12, E13, E14, E15, E16, E17, E18North Natomas JibeYolobus: 42A, 42B, 43, 43R, 230
Archives PlazaSacRT light rail Gold Green
13th Street
16th StreetSeptember 5, 1987SacRT light rail GoldSacramento Regional Transit: 106, 109, E10, E11, E12, E13, E14, E15, E16, E17, E18
BroadwaySeptember 26, 2003Sacramento Regional Transit: 51, 62
4th Avenue/Wayne HultgrenSacramento Regional Transit: 62
City CollegeSacramento Regional Transit: 11, SmaRT Ride Franklin−South Sacramento
FruitridgeSacramento Regional Transit: 61, SmaRT Ride Franklin−South Sacramento
47th AvenueSacramento Regional Transit: SmaRT Ride Franklin−South Sacramento
FlorinSacramento Regional Transit: 81, SmaRT Ride Franklin−South Sacramento
MeadowviewSacramento Regional Transit: 56, 105, SmaRT Ride Franklin−South Sacramento
Morrison CreekRequest stopAugust 29, 2021
FranklinAugust 24, 2015Sacramento Regional Transit: SmaRT Ride Franklin−South Sacramento
Center ParkwaySacramento Regional Transit: SmaRT Ride Franklin−South Sacramento
Cosumnes River CollegeSacramento Regional Transit: 56, 67, 68, E110, E114, E115, E116, SmaRT Ride Franklin−South Sacramento

External links