Borivali (West) is an elevated metro station on the North-South corridor of the Yellow Line 2A of Mumbai Metro in Mumbai, India. This station is located in Borivali, Mumbai. This station is owned by the Mumbai Metropolitan Region Development Authority (MMRDA), and was inaugurated on 2 April 2022.

History

J Kumar Infraprojects was awarded the contract to construct the station in June 2016. The MMRDA announced that electrification of the line had been completed on 26 May 2020.

Borivali West was opened to the public on 2 April 2022, along with the first phase of Line 2A.

Station layout

2nd FloorSide platform Accessibility
Platform 1→ towards Dahisar (East) (Eksar) →
Platform 2← towards Andheri (West) (Shimpoli)
Side platform Accessibility
1st FloorMezzanineFare control, station agent, Metro Card vending machines, crossover
GroundStreet levelExit/Entrance

Power and signaling system

Like all other stations and railways of Mumbai metro, Borivali West station also uses 25,000 volt AC power system by overhead catenary to operate the trains.