Express road S52 in Bielsko-Biała

Expressway S52 is a Polish highway under construction with a planned length of 116 km (72 mi), located in the Silesian and Lesser Poland voivodeships. Upon completion it will connect the border of the Czech Republic in Cieszyn (along with the D48 motorway) with Kraków.

The section from the border with the Czech Republic to Bielsko-Biała is completed. From Bielsko-Biała to Głogoczów (joining with the dual-carriageway national road 7 towards Kraków) the design is ongoing and the road is planned to get completed in 2032.

The separate section also numbered S52 is the northern bypass of Kraków, which is completed since 2024.

Road numbering

Before 2016, the section from Bielsko-Biała to the state border in Cieszyn was part of the expressway S1. This section was renumbered to S52 when the S1 was rerouted over expressway S69.

From 1999 to 2004, the first constructed section of Kraków northern bypass (from interchange with A4 in Balice to Modlniczka) was designated as the A41 motorway, although the route number was not shown on maps and road atlases at that time.

Route description

Cieszyn - Bielsko-Biała

Number of exit(facility)NameMileage from beginningHistory of constructionNotes
1)Suchy Potok (planned)0 kmWith environmental decisionTo the Bielsko-Biała-Komorowice interchange parallel to , eastern terminus
2)Bielsko-Biała - Rosta1.6 km (0.99 mi)The contract was signed in October 2008, works started in 2009.
3)Bielsko-Biała Komorowice4.5 km (2.80 mi)Works from Bielsko-Biała-Rosta to this interchange were allowed on 5.05.2009
4)Bielsko-Biała - Andersa7.0 km (4.35 mi)Constructed 06.2003-10.2006
5)Bielsko-Biała - Francuska8.3 km (5.16 mi)Exit to the shopping center
6)Bielsko-Biała - Wapienica9.6 km (5.97 mi)
7)(1)Jasienica13.9 km (8.64 mi)Exit to rest area(westbound)(restaurant, petrol station); interchange both ways
8)(2)Świętoszówka16.4 km (10.19 mi)Constructed 11.2004-11.2006Exit to rest area(eastbound)(restaurant, petrol station); exit eastbound only
9)(3)No name20.7 km (12.86 mi)Exit to rest area(eastbound)(restaurant, petrol station); exit eastbound only, exit to Grodziec via a gravel road
10)Skoczów-I22.4 km (13.92 mi)Constructed 06.2003-11.2007Construction was delayed because of the bankruptcy of the first contractor
11)Skoczów-II23.3 km (14.48 mi)
12)MOP Gumna31.7 km (19.70 mi)Constructed 10.2002-10.2005Rest area(restaurant, petrol station)
13)Cieszyn Wschód33.0 km (20.51 mi)Constructed 1991–1995, renovation 11.2006-10.2007
(4)MOP Cieszyn35.3 km (21.93 mi)Rest area(restaurant, petrol station, motel)
14)Cieszyn Zachód36.3 km (22.56 mi)
15)Cieszyn Pastwiska36.8 km (22.87 mi)Last interchange before the border, exit only westbound, entrance only eastbound.
Former border checkpoint "Cieszyn"37.4 km (23.24 mi)Entrance to Czech Republic
38.3 km (23.80 mi)Bridge over the Olza river

Bielsko-Biała - Kraków

See also