The Geelong line is a regional passenger rail service operated by V/Line in Victoria, Australia. It serves 15 stations towards its terminus in Waurn Ponds, a southern suburb of Geelong, via the Regional Rail Link. It is the most used regional rail service in Victoria, carrying 10.22 million people in the 2023–2024 financial year.

Beyond Waurn Ponds, the service continues as the Warrnambool line to Warrnambool in the state's south-west.

History

19th and 20th centuries

The line to Geelong was originally built by the Geelong and Melbourne Railway Company and opened on 25 June 1857. The line was designed by English engineer Edward Snell, and originally built as a single-track railway.

The line was sold to the Victorian Railways in 1860. Following its sale, the line was progressively extended south-west, to Winchelsea in 1876, Colac in 1877, Camperdown in 1883, Terang in 1877, and lastly to Warrnambool, Dennington, and Port Fairy in 1890. The line is now closed beyond Warrnambool, with the last train leaving Port Fairy in September 1977.

In February 1959, the line from North Geelong to Corio was duplicated. Werribee to Little River was duplicated in October 1970, and Little River to Lara was duplicated in June 1981.

21st century

There have long been calls to electrify the line, but plans were put on hold by the State Government in 2002, with diesel locomotives and railcars utilised instead.

Regional Fast Rail

Train services between Melbourne and Geelong received a package of upgrades under the Regional Fast Rail project, primarily focusing on upgrading the line to support 160 km/h running and the introduction of V/Line VLocity diesel multiple unit train sets. VLocity trains entered service on the line in 2006.

Construction of Waurn Ponds railway station was completed in 2014, with several Geelong line services being extended to terminate at Waurn Ponds.

Regional Rail Link

In the late 2000s and early 2010s, trains on the Geelong – Melbourne corridor were chronically late. As of March 2010, trains had officially run late for 44 consecutive months on the line. The poor performance of V/Line was well documented in the local Geelong press. Recurring issues on the line included poor communication, commuters worried about losing their jobs in Melbourne due to delays, and overcrowding.

In 2008 the Regional Rail Link project was announced, consisting of a new pair of tracks exclusively for V/Line services, avoiding the need to share tracks with Metro's electrified suburban services. The tracks begin west of Werribee, following an alignment up to Deer Park, then running into two new platforms at Southern Cross, completely bypassing Tottenham, West Footscray, Middle Footscray, South Kensington, and North Melbourne; but still stopping at Sunshine and Footscray at two platforms dedicated to V/Line services.

The main benefit of the project was for the Geelong line service, which used to run along the same tracks as Metro's Werribee line, resulting in significant congestion. Ballarat and especially Bendigo services benefited less, only being separated from Metro's Sunbury line service between Sunshine and Southern Cross. While the project was overall well-received for increasing service reliability, the choice to bypass North Melbourne was especially criticised.

The Regional Rail Link included two new stations to be served by Geelong V/Line trains: Tarneit and Wyndham Vale. Since its opening, overcrowding has become a persistent and chronic issue, especially at Tarneit, which is the most-used V/Line station other than Southern Cross.

Regional Rail Revival

The line received another significant package of works as part of the Regional Rail Revival project. Most notably, the line was duplicated from South Geelong to Waurn Ponds. To support this duplication, a new stabling facility was to be constructed at Waurn Ponds and three level crossings to be removed. These upgrades would allow 5 trains per hour during peak and 3 trains per hour off peak.

Between June and August 2024, the railway line was closed for duplication. The upgrades were completed on 26 August 2024, with new second platforms added to South Geelong and Marshall stations.

As of 1 December 2024, 68 new weekend services run to Waurn Ponds, 20 Wyndham Vale services have been extended to start/terminate at Waurn Ponds, 15 extra services a weekday "have been added" to Marshall station and 4 extra services per weekday "have been added" to Waurn Ponds station. all of which has been enabled by the duplication of the South Geelong to Waurn Ponds corridor.

Network and operations

Services

On weekdays, there are five express services per day. All Melbourne-bound services operate express between Geelong and Southern Cross, stopping only at Footscray. On weekends and public holidays, there are a total of five services per day.

Train services on the line are also subjected to maintenance and renewal works, usually on selected Fridays and Saturdays. Shuttle coach services are provided throughout the duration of works for affected commuters.

Stopping patterns

Legend — Station status

  • Premium Station – Station staffed from first to last train
  • Host Station – Usually staffed during morning peak, however this can vary for different stations on the network.

Legend — Stopping patterns

  • ● – All trains stop
  • ◐ – Some services do not stop
  • ▲ – Only inbound trains stop
  • ▼ – Only outbound trains stop
  • | – Trains pass and do not stop

*West Tarneit station is under construction

Geelong Services
StationLocalExpressMarshallSouth GeelongGeelongWyndham Vale
Southern Cross
Footscray
Sunshine
Deer ParkII
Tarneit
West Tarneit *II
Wyndham Vale
Little RiverII
Lara
CorioI
North ShoreI
North Geelong
Geelong
South Geelong
Marshall
Waurn Ponds

Services

The current V/Line timetable has weekday services operating approximately every 20 minutes from Southern Cross to either South Geelong or Waurn Ponds in an alternating pattern. Some services originate and terminate at Wyndham Vale.

Weekday peak services towards Southern Cross typically originate at either South Geelong or Waurn Ponds in an alternating pattern, and most stop all stations.

Off-peak services to and from South Geelong usually run express through Corio, while off-peak services to and from Waurn Ponds run express through Little River.

Since 1 December 2024, weekend service frequency is approximately every 20 minutes, with all trains timetabled to originate and terminate at Waurn Ponds and alternating between stopping all stations except Little River and stopping all stations except Corio.

All Geelong services run express through Ardeer; it is only served by Ballarat services.

Rolling stock

All services are run using V/Line VLocity diesel multiple unit trains in either a 3- or 6-car configuration. Some services originating and terminating at Wyndham Vale are operated with a 9-car VLocity set. S type carriages were used until 2010 and H type carriages were used until 2024.

Future

Electrification and quadruplication to Wyndham Vale

The 2018 Western Rail Plan identified a need to electrify the line up to Wyndham Vale, which would significantly resolve the overcrowding problem due to the fact Metro's trains can hold more people than V/Line's. The plan also featured quadruplication, avoiding the problem of a new electric service causing congestion for V/Line services along the corridor. In 2023, it was widely reported that track quadruplication was no longer part of the Western Rail Plan, and there is no concrete plan for electrification.

Geelong Fast Rail

Geelong services used to run on the same tracks as Metro's Werribee line until the Regional Rail Link was opened in 2015, diverting trains along a new alignment completely bypassing it. In 2020, the Geelong Fast Rail project was announced, which planned to reroute Geelong trains back to the Werribee corridor, this time with an express track exclusively for Geelong services between Werribee and Laverton, potentially reducing travel times by up to 15 minutes. In 2023, the Federal Government cut funding to various infrastructure projects, resulting in Geelong Fast Rail being shelved.

Gallery

  • V/Line N class N456 running over the Regional Rail Link's elevated North Melbourne bypass
  • Victorian Railways R class steam train on a heritage tour at Geelong Station, run by volunteer group Steamrail Victoria
  • Platforms at Tarneit, 2015
  • Dual-gauge track in North Geelong

Line guide

vteGeelong railway line
km Multiple linesto Flinders Street 0.0 Southern Cross Railways in MelbourneRailways in Victoria City Loop Albury, North East & Western linesto Albury, Sydney & Adelaide 1.7 North Melbourne (not a stop) 1.9 Dynon Road Upfield lineto Upfield 2.5 CityLink 2.5 Moonee Ponds Creek Craigieburn, Seymour & Shepparton linesvia Essendon Flemington Racecourse lineto Flemington Racecourse South Kensington–West Footscray lineto West Footscray Metro section (Sunbury Line) 3.5 South Kensington (not a stop) Melbourne Metro Tunnelto Caulfield (under construction) Saltwater River (demolished) 4.2 Maribyrnong River Maribyrnong lineto Maribyrnong River Terminal (dismantled) 5.4 Hopkins Street 5.6 Footscray South Kensington–West Footscray, North East & Western linesto Southern Cross Werribee & Williamstown linesto Newport 6.0 Footscray (Main line) (demolished) 6.6 Middle Footscray (not a stop) 7.0 Geelong Road 7.3 West Footscray (not a stop) 9.1 Tottenham (not a stop) 9.1 Ashley Street 9.8 White City (demolished) Newport–Sunshine & Western linesto Newport & Adelaide Maidstone (demolished) 11.0 Stony Creek Newport–Sunshine lineto Newport 12.3 Sunshine 12.3 Hampshire Road Multiple linesvia Albion 12.8 Anderson Road 13.9 Kororoit Creek 15.1 Ardeer (2nd) (not a stop) 15.7 Ardeer Siding (demolished) 16.0 Western Ring Road 16.1 Ardeer (1st) (demolished) 17.6 Mt Derrimut Road 17.9 Deer Park Ravenhall Siding (closed) Sandringham Quarry Trust Siding (closed) 19.3 Deer Park West (proposed) Ararat, Ballarat, Maryborough linesto Ballarat 20.1 Western Freeway 26.0 Truganina (proposed) 28.4 Skeleton Waterholes Creek 29.5 Tarneit 29.5 Derrimut Road 32.2 West Tarneit (proposed) 36.0 Sayers Road (proposed) 36.8 Werribee River 40.3 Wyndham Vale 42.7 Wyndham Vale South Sidings Western SG line to Southern Cross &Port Fairy line to Werribee 47.7 Manor (demolished) 49.2 Mambourin (demolished) 55.7 Little River 55.9 Little River 65.6 Lara 69.3 Elders IXL Siding (closed) 70.1 Princes Freeway 70.9 Geelong Grammar Siding (demolished) 72.1 Corio 73.4 Distillers Siding (demolished) 75.3 North Shore 76.2 Cowies Creek Harbour Trust Sidings Western SG line to Adelaide &Geelong–Ballarat line to Ballarat 77.0 Old Princes Highway 77.5 North Geelong Yard Geelong–Ballarat line to Ballarat &Fyansford line to APC Fyansford (dismantled) 78.1 North Geelong 79.3 Church Street (Midland Highway) 79.3 Geelong Locomotive Depot 80.1 Latrobe Terrace (Old Princes Highway) Cunningham Pier (dismantled) 80.7 Geelong 81.1 Geelong Tunnel 82.5 South Geelong Queenscliff lineto Queenscliff (dismantled) 85.0 Geelong Racecourse (2nd) (demolished) 85.8 Breakwater (demolished) Barwon River 87.7 Marshall Geelong Racecourse (1st) (demolished) 89.9 Grovedale (demolished) 92.6 Duneed (demolished) 93.0 Waurn Ponds Warrnambool serviceto Warrnambool km
km
Multiple linesto Flinders Street
Multiple lines
to Flinders Street
0.0Southern Cross Railways in MelbourneRailways in Victoria
City Loop
Albury, North East & Western linesto Albury, Sydney & Adelaide
Albury, North East & Western lines
to Albury, Sydney & Adelaide
1.7North Melbourne (not a stop)
1.9Dynon Road
Upfield lineto Upfield
Upfield line
to Upfield
2.5CityLink
2.5Moonee Ponds Creek
Craigieburn, Seymour & Shepparton linesvia Essendon
Craigieburn, Seymour & Shepparton lines
via Essendon
Flemington Racecourse lineto Flemington Racecourse
Flemington Racecourse line
to Flemington Racecourse
South Kensington–West Footscray lineto West Footscray
South Kensington–West Footscray line
to West Footscray
Metro section (Sunbury Line) 3.5 South Kensington (not a stop) Melbourne Metro Tunnelto Caulfield (under construction) Saltwater River (demolished) 4.2 Maribyrnong River Maribyrnong lineto Maribyrnong River Terminal (dismantled) 5.4 Hopkins Street 5.6 Footscray South Kensington–West Footscray, North East & Western linesto Southern Cross Werribee & Williamstown linesto Newport 6.0 Footscray (Main line) (demolished) 6.6 Middle Footscray (not a stop) 7.0 Geelong Road 7.3 West Footscray (not a stop) 9.1 Tottenham (not a stop) 9.1 Ashley Street 9.8 White City (demolished) Newport–Sunshine & Western linesto Newport & Adelaide Maidstone (demolished) 11.0 Stony Creek Newport–Sunshine lineto Newport 12.3 Sunshine 12.3 Hampshire Road Multiple linesvia Albion
Metro section (Sunbury Line)
Metro section (Sunbury Line)
3.5 South Kensington (not a stop)
3.5South Kensington (not a stop)
South Kensington (not a stop)
Melbourne Metro Tunnelto Caulfield (under construction)
Melbourne Metro Tunnel
to Caulfield
Saltwater River (demolished)
4.2Maribyrnong River
Maribyrnong lineto Maribyrnong River Terminal (dismantled)
Maribyrnong line
to Maribyrnong River Terminal
5.4Hopkins Street
5.6Footscray
South Kensington–West Footscray, North East & Western linesto Southern Cross
South Kensington–West Footscray, North East & Western lines
to Southern Cross
Werribee & Williamstown linesto Newport
Werribee & Williamstown lines
to Newport
6.0Footscray (Main line) (demolished)
6.6Middle Footscray (not a stop)
7.0Geelong Road
7.3West Footscray (not a stop)
9.1Tottenham (not a stop)
9.1Ashley Street
9.8White City (demolished)
Newport–Sunshine & Western linesto Newport & Adelaide
Newport–Sunshine & Western lines
to Newport & Adelaide
Maidstone (demolished)
11.0Stony Creek
Newport–Sunshine lineto Newport
Newport–Sunshine line
to Newport
12.3Sunshine
12.3Hampshire Road
Multiple linesvia Albion
Multiple lines
via Albion
12.8Anderson Road
13.9Kororoit Creek
15.1Ardeer (2nd) (not a stop)
15.7Ardeer Siding (demolished)
16.0Western Ring Road
16.1Ardeer (1st) (demolished)
17.6Mt Derrimut Road
17.9Deer Park
Ravenhall Siding (closed)
Sandringham Quarry Trust Siding (closed)
19.3Deer Park West (proposed)
Ararat, Ballarat, Maryborough linesto Ballarat
Ararat, Ballarat, Maryborough lines
to Ballarat
20.1Western Freeway
26.0Truganina (proposed)
28.4Skeleton Waterholes Creek
29.5Tarneit
29.5Derrimut Road
32.2West Tarneit (proposed)
36.0Sayers Road (proposed)
36.8Werribee River
40.3Wyndham Vale
42.7Wyndham Vale South Sidings
Western SG line to Southern Cross &Port Fairy line to Werribee
Western SG line to Southern Cross &
Port Fairy line to Werribee
47.7Manor (demolished)
49.2Mambourin (demolished)
55.7Little River
55.9Little River
65.6Lara
69.3Elders IXL Siding (closed)
70.1Princes Freeway
70.9Geelong Grammar Siding (demolished)
72.1Corio
73.4Distillers Siding (demolished)
75.3North Shore
76.2Cowies Creek
Harbour Trust Sidings
Western SG line to Adelaide &Geelong–Ballarat line to Ballarat
Western SG line to Adelaide &
Geelong–Ballarat line to Ballarat
77.0Old Princes Highway
77.5North Geelong Yard
Geelong–Ballarat line to Ballarat &Fyansford line to APC Fyansford (dismantled)
Geelong–Ballarat line to Ballarat &
Fyansford line to APC Fyansford (dismantled)
78.1North Geelong
79.3Church Street (Midland Highway)
79.3Geelong Locomotive Depot
80.1Latrobe Terrace (Old Princes Highway)
Cunningham Pier (dismantled)
80.7Geelong
81.1Geelong Tunnel
82.5South Geelong
Queenscliff lineto Queenscliff (dismantled)
Queenscliff line
to Queenscliff
85.0Geelong Racecourse (2nd) (demolished)
85.8Breakwater (demolished)
Barwon River
87.7Marshall
Geelong Racecourse (1st) (demolished)
89.9Grovedale (demolished)
92.6Duneed (demolished)
93.0Waurn Ponds
Warrnambool serviceto Warrnambool
Warrnambool service
to Warrnambool
km
broad gauge standard gauge dual gauge
broad gauge
standard gauge
dual gauge

See also

External links