Line 1, also known as Bến Thành – Suối Tiên Line, is a rapid transit line of the Ho Chi Minh City Metro in Vietnam. It is the city's first metro line and the nation's first underground metro line, connecting the city center with the east side, which include District Bình Thạnh and Thủ Đức City (pre-July 1st, 2025).

Construction began in 2012, with an initial completion date set for 2018. However, the project's completion was delayed multiple times. The line was officially opened for service on 22 December 2024.

Ticket prices range from 7,000–20,000 VND (US$0.27–0.79) per trip or 6,000–19,000 VND (US$0.20–0.75) for cashless payments.

From the planning in 2024, Line 1 will be extended from Ben Thanh station to An Ha Depot, bringing the total length to 40.8 km.

History

The line was designed by Nippon Koei (now ID&E Holdings). The above-ground section was constructed by a joint venture between the Japanese rail corporation Sumitomo Group and Vietnamese state-owned corporation Cienco 6. The underground section was constructed by two Japanese companies, Shimizu Corporation and Maeda Corporation. 83% of the project finance was provided by Japanese government loans through Japan International Cooperation Agency (JICA), while the rest was provided by the Vietnamese government. Engineering surveys for the geometric control of the casting of the viaduct segments, as well as the erection of the spans, were handled by the joint venture of Freyssinet (part of Soletanche Freyssinet, through its parent company Vinci), VSL, and Rizzani de Eccher.

On 13 September 2017, the authorities announced that Line 1 would be delayed for two years. Cost overruns, audits, and delayed payments to contractors contributed to the delay. The targeted completion date was set for 2020. Planners expect the route to serve more than 160,000 passengers daily upon launch, increasing to 635,000 by 2030 and 800,000 by 2040. All stations along the route are expected to accommodate the disabled, with automatic ticket vending machines, telephone booths, restrooms, subway doors and information bulletins accessible to the handicapped and visually impaired.

On 28 January 2019, MAUR Director of Project Management Unit Dương Hữu Hòa stated that as of December 2018, construction progress of Line 1 had reached 62%, below the target of 65%. The project has been criticised by the local press for its repeated delays.

By August 2022, the line was 92% complete. 17 Hitachi train sets arrived and are undergoing testing.

By February 2024, the line was now 97.5% complete. Test runs have begun, and MAUR are planning for commercial use in Q4 2024.

On 22 December 2024, the line began service. Tickets to and from all stations were free until 20 January 2025. The first four days of the line's opening served 394,967 riders.

On 21 January 2025, the line began charging passengers.

Route

Map
Route of the HCMC Metro Line 1

Stations

The first three stations—Bến Thành, Opera House, and Ba Son—are underground, while the remainder are on elevated track.

Station symbolStation nameLayoutMetro transfersDistanceLocation
EnglishVietnamesebetween stationsin total
L101Bến ThànhUndergroundL1 extended (planned) L2 (under construction) L4 (planned)0.0 km (0 mi)Bến Thành
L102Opera HouseNhà Hát Thành Phố0.6 km (0.37 mi)0.6 km (0.37 mi)Sài Gòn
L103Ba Son1.7 km (1.06 mi)2.3 km (1.43 mi)
L104Văn Thánh ParkCông viên Văn ThánhElevated1.2 km (0.75 mi)3.5 km (2.17 mi)Thạnh Mỹ Tây
L105Tân CảngL5 (planned)0.9 km (0.56 mi)4.4 km (2.73 mi)
L106Thảo ĐiềnL5 (planned) L7 (planned)1.1 km (0.68 mi)5.5 km (3.42 mi)An Khánh
L107An PhúL5 (planned)1.0 km (0.62 mi)6.5 km (4.04 mi)
L108Rạch Chiếc1.7 km (1.06 mi)8.2 km (5.10 mi)Bình Trưng
L109Phước LongL7 (planned)1.5 km (0.93 mi)9.7 km (6.03 mi)Thủ Đức
L110Bình TháiL6 (planned)1.3 km (0.81 mi)11.0 km (6.84 mi)
L111Thủ Đức1.8 km (1.12 mi)12.8 km (7.95 mi)
L112High Tech ParkKhu Công Nghệ CaoL10 (planned)2.4 km (1.49 mi)15.2 km (9.44 mi)Linh Xuân
L113National UniversityĐại Học Quốc Gia1.5 km (0.93 mi)16.7 km (10.38 mi)
L114Suối Tiên TerminalBến Xe Suối TiênL1 extended (planned)3.0 km (1.86 mi)19.7 km (12.24 mi)Đông Hòa

Fares

Line 1's fares are as follows:

Single journey ticket fares - cash payments (unit: thousand VND)
StationsBến ThànhOpera HouseBa SonVăn Thánh ParkTân CảngThảo ĐiềnAn PhúRạch ChiếcPhước LongBình TháiThủ ĐứcHigh Tech ParkNational UniversitySuối Tiên Terminal
Bến Thành7777779101214161820
Opera House7777778101113161720
Ba Son777777791012151618
Văn Thánh Park77777777810131417
Tân Cảng7777777779121316
Thảo Điền7777777778101214
An Phú777777777791113
Rạch Chiếc98777777778911
Phước Long1010977777777810
Bình Thái1211108777777778
Thủ Đức14131210987777777
High Tech Park1616151312109877777
National University18171614131211987777
Suối Tiên Terminal2020181716141311108777
Other tickets
Ticket typesPrice
Day ticket1-day40,000 VND/ticket
3-day90,000 VND/ticket
Monthly pass (30 days of use)Standard300,000 VND/pass
Students150,000 VND/pass