Miyazaki, Japan

The Higashikyushu Expressway(東九州自動車道, Higashi-Kyūshū jidōshadō) is one of the expressways of Japan from Kitakyūshū (and the bridge to Honshū) to east of Kagoshima linking with the Kyushu Expressway. It runs north to south, through the prefectures of Fukuoka, Oita, Miyazaki and the Kagoshima prefectures. The freeway runs entirely on the island of Kyūshū. The total length is 500 km.

Overview

The first section of the expressway was opened to traffic in 1999. As of March 2009 the expressway is incomplete in many areas. The section between Soo Yagorō Interchange and Sueyoshi Takarabe Interchange opened in 2010. Most of the incomplete areas were built according to the New Direct Control System, whereby the burden for construction costs will be shared by the national and local governments and no tolls will be collected. Currently the section between Saiki Interchange and Nobeoka Minami Interchange, and Kanoya Kushira Junction and Sueyoshi Takarabe Interchange operates according to this principle.

The expressway is 4 lanes from Kitakyushu Junction to Kanda Kitakyushu-kūkō Interchange and Hiji Junction to Ōita Miyagawachi Interchange, and 2 lanes for all remaining sections.

The route parallels the Nippō Main Line of Kyushu Railway Company and National Route 10 for much of its length.

History

  • December 15, 1994, a section from Hiji Junction to Hayami Interchange was opened to traffic.
  • November 27, 1999, a section from Oita Mera to Oita Miyagawachi Interchanges was opened to traffic.
  • March 4, 2000, a section from Kokubu to Hayato Higashi Interchange was opened to traffic with another freeway.
  • March 25, 2000, a section from Miyazaki Nishi Interchange to Kiyotake Junction was opened to traffic.
  • March 31, 2001, a section from Saito to Miyazaki Nishi Interchange was opened to traffic.
  • April 18, 2001, the Oita Nogyo Bunka Koen Interchange was opened.
  • December 19, 2001, the Kajiki Junction was opened to traffic with another freeway.
  • December 27, 2001, a section from Oita Miyagawachi to Tsukumi Interchanges was opened to traffic.
  • March 2, 2002, a section from Sueyoshi Takarabe to Kokubu Interchanges was opened to traffic.
  • March 30, 2002, the Hiji Junction was opened to traffic with another freeway.
  • February 26, 2006, a section from Kitakyushu Junction to Kanda Kitakyushu Airport Interchange was opened to traffic.
  • June 28, 2008, a section from Tsukumi to Saiki Interchange was opened to traffic.
  • March 14, 2010, a section from Soo Yagoro to Sueyoshi Takarabe Interchange was opened to traffic.
  • July 17, 2010, a section from Takanabe to Saito Interchange was opened to traffic.
  • December 14, 2010, a section from Kadogawa to Hyuga Interchange was opened to traffic with another freeway.
  • December 15, 2012, a section from Sumie to Kitagawa Interchange was opened to traffic.
  • December 22, 2012, a section from Tsuno to Takanabe Interchange was opened to traffic.
  • February 16, 2013, a section from Kamae to Kitaura Interchange was opened to traffic.
  • March 23, 2013, a section from Kiyotake Junction to Kiyotake Minami Interchange was opened to traffic.
  • March 8, 2014, a section from Kitaura to Sumie Interchange was opened to traffic.
  • March 16, 2014, a section from Hyuga to Tsuno Interchange was opened to traffic.
  • March 23, 2014, a section from Kanda Kitakyushu Airport to Yukuhashi Interchange was opened to traffic.
  • December 13, 2014, a section from Yukuhashi to Miyako Toyotsu Interchange was opened to traffic with another freeway.
  • December 13, 2014, the Shiida Minami Interchange was opened.
  • December 21, 2014, a section from Kanoya Kushira Junction to Soo Yagoro Interchange was opened to traffic.
  • December 21, 2014, the Kanoya Kushira Junction was opened to traffic with another freeway.
  • March 1, 2015, a section from Buzen to Usa Interchanges was opened to traffic with another freeway.
  • March 21, 2015, a section from Saiki to Kamae Interchanges was opened to traffic.
  • April 28, 2015, the Imagawa Parking Area and the Yukuhashi Imagawa Bus Stop was opened.
  • April 24, 2016, a section from Shiida Minami to Buzen Interchange was opened to traffic which made the Higashikyushu Expressway from Kitakyushu to Miyazaki fully accessible with no gaps.
  • March 25, 2017, the Kadogawa Minami Smart Interchange was opened.
  • March 11, 2018, a section from Nishinan Kitago to Nichinan Togo Interchanges was opened to traffic.
  • August 5, 2018, a section from Hiji Junction to Oita Mera Interchange is incorporated as part of the Higashikyushu Expressway.
  • August 5, 2018, the Beppuwan Smart Interchange was fully accessible.
  • October 6, 2019, the Kunitomi Smart Interchange was opened.

Interchanges

Between Kitakyushu Junction and Aburatsu Interchange

No.NameConnectionsDist. from OriginBus stopNotesLocation
(2-1)Kitakyushu JCTKyushu Expressway0.0FukuokaKokuraminami-ku, Kitakyūshū
1Kanda Kitakyushu Airport ICPref. Route 245 (Kitakyushu Airport Route)8.2Kanda
2Yukuhashi ICNational Route 20116.8Yukuhashi
PA/SICImagawa PA/SICPref. Route 34 (Yukuhashi Soeda Route) via Yukuhashi city road19.1
3Miyako Toyotsu ICNational Route 10 (Shiida Road)24.2Miyako
4Tsuiki ICPref. Route 237 (Sawada Shimobefu Route)26.4Chikujō
-Shiida TB-27.1Abandoned on December 13, 2014
5Shiida ICPref. Route 231 (Kurohira Shiida Route)31.5
6Shiida Minami ICNational Route 10 (Shiida Road)33.1For Kitakyushu only
7Buzen ICPref. Route 32 (Saigawa Buzen Route)40.3Buzen
PA/SICKōge PA/SICNational Route 10 (Buzen Bypass, Nakatsu Bypass) via Kōge town road45.5Kōge
8Nakatsu ICNakatsu Hita Road52.5OitaNakatsu
9Usa ICNational Route 10 (Usa Road, Usa Beppu Road)61.4Usa
9-1Innai IC/TBNational Route 38766.0For Oita only TB: Abandoned on September 16, 2014
9-2Ajimu ICPref. Route 42 (Yamaga Innai Route)71.2
9-3Oita Nōgyō Bunka Kōen ICPref. Route 42 (Yamaga Innai Route)77.5
9-4Hayami ICNational Route 10 (Usa Beppu Road, Hiji Bypass) Pref. Route 24 (Hiji Yamaga Route)83.8Hiji
10Hiji JCTŌita Expressway87.1
SA/SICBeppuwan SA/SICNational Route 500 via Beppu city road Pref. Route 218 (Beppu Yamaga Route)89.5Beppu
11Beppu ICPref. Route 11 (Beppu Ichinomiya Route)94.3
BSHasama BS103.7Yufu
12Oita ICPref. Route 21 (Oita Usuki Route)109.1Oita
13Oita Mitsuyoshi ICNational Route 210 (Kinoue Bypass)113.5
14Oita Mera ICNational Route 10 (Oita-Minami Bypass) Pref. Route 56 (Nakahanda Shimogori Route)116.9
PAOita Matsuoka PA119.8
15Oita Miyagawachi ICNational Route 197 (Oita-Higashi Bypass)123.1
16Usuki ICNational Route 502137.1Usuki
17Tsukumi ICPref. Route 648 (Tsukumi Interchange Route)144.1Tsukumi
PAYayoi PAScheduled to be opened in 2021Saiki
TBSaiki TBToll Barrier
18Saiki ICPref. Route 36 (Saiki Tsukumi Route)157.1
18-1Saiki Katata ICPref. Route 603 (Akagi Fukihara Saiki Route)162.2
19Kamae ICNational Route 388177.5
19-1Kamae Hatōzu ICPref. Route 122 (Furue Maruichibi Route)186.3
20Kitaura ICNational Route 388191.7MiyazakiNobeoka
20-1Sumie ICPref. Route 243 (Sumie Interchange Route)198.1For Nobeoka only
21Kitagawa ICNational Route 10 (Nobeoka Road)203.7
22Nobeoka JCT/ICKyushu Chūō Expressway Pref. Route 241 (Nobeoka Interchange Route)216.5
23Nobeoka Minami ICNational Route 10 (Totoro Bypass, Nobeoka Road, Nobeoka-Minami Road)223.5
TBKadogawa TB227.9Toll BarrierKadogawa
24Kadogawa ICNational Route 10 (Nobeoka-Minami Road) Pref. Route 226 (Totoro Hyūga Route)228.0For Nobeoka only
BSKadogawa BS
SICKadogawa Minami SICNational Route 10 (Nobeoka-Minami Road) Pref. Route 226 (Totoro Hyūga Route) via Kadogawa town road229.6For Miyazaki only
25Hyūga ICNational Route 327 (Hyūga Bypass)241.9Hyūga
26Tsuno ICPref. Route 303 (Tsuno Interchange Route)261.9Tsuno
PAKawaminami PA268.9Kawaminami
27Takanabe ICPref. Route 308 (Takanabe Interchange Route)274.8Takanabe
28Saito ICPref. Route 321 (Saito Interchange Route)286.9Saito
BSKunitomi BS297.9Kunitomi
SICKunitomi SICPref. Route 26 (Miyazaki Suki Route)298.5
BSMiyazaki BS302.6Miyazaki
29Miyazaki Nishi ICNational Route 10 (Miyazaki-Nishi Bypass)303.7
PAMiyazaki PA306.7
30Kiyotake ICPref. Route 371 (Kiyotake Interchange Route)311.6
(4-1)Kiyotake JCTMiyazaki Expressway313.8
TBKiyotake Minami TBToll Barrier
30-1Kiyotake Minami ICPref. Route 378 (Kiyotake Minami Interchange Route)315.0
Under Construction
31Nichinan Kitagō ICPref. Route 28 (Nichinan Takaoka Route) Pref. Route 429 (Inohae Route)332.8Nichinan
32Nichinan Togō ICNational Route 220 (Nichinan Shibushi Road) Pref. Route 434 (Kazeda Hoshikura Route)341.8
Aburatsu ICNational Route 222345.0Planned
Planned route

Between Aburatsu and Natsui Interchanges

Between Shibushi Interchange and Kajiki Junction

No.NameConnectionsDist. from OriginDist. from TerminusBus stopNotesLocation
Planned route
Natsui IC0.085.5PlannedKagoshimaShibushi
35Shibushi ICNational Route 220 (Nichinan Shibushi Road) Miyakonojō Shibushi Road (planned) Pref. Route 63 (Shibushi Fukuyama Route)3.781.8
35-1Shibushi Ariake IC7.178.4
36Ōsaki ICPref. Route 64 (Ōsaki Kihoku Route)13.472.1Ōsaki
37Kanoya Kushira JCTŌsumi Jūkan Road Pref. Route 552 (Kanoya Kushira Interchange Route)22.962.6Kanoya
37-1Nogata ICPref. Route 64 (Ōsaki Kihoku Route)29.456.1Ōsaki
38Soo Yagorō JCTPref. Route 71 (Tarumizu Minaminogō Route)40.644.9Soo
39Sueyoshi Takarabe ICNational Route 1051.733.8
Sueyoshi Takarabe TBToll Barrier
PAKokubu PA68.417.1Kirishima
40Kokubu ICNational Route 1074.211.3
41Hayato Higashi ICNational Route 10 (Hayato Road) Pref. Route 58 (Hayato Port Route)79.06.5
42Hayato Nishi ICPref. Route 471 (Kita-Naganoda Obama Route)82.62.9
(25)Kajiki ICNational Route 10 (Kajiki Bypass) Pref. Route 55 (Kurino Kajiki Route)85.10.4Aira
(25-1)Kajiki JCTKyushu Expressway National Route 10 (Hayato Road)85.50.0