Interstate19 (I-19) is a north–south Interstate Highway located entirely within the US state of Arizona. I-19 travels from Nogales, roughly 90 meters (300ft) from the Mexican border, to Tucson, at I-10. The highway also travels through the cities of Rio Rico, Green Valley, and Sahuarita.

Having a total length of just over 102 kilometers (63mi), I-19 is the eighth-shortest primary (two-digit) Interstate Highway in the contiguous 48states, where only I-86 (Idaho), I-11 (Nevada), I-2 (Texas), I-42 (North Carolina), I-14 (Texas), I-97 (Maryland), and I-87 (North Carolina) are shorter.

While the highway is short, it is a very important corridor, serving as a fast route from Tucson and Phoenix (via I-10) to the Mexican border. The highway is a portion of the US section of the CANAMEX Corridor, a trade corridor that stretches north from Mexico across the US to the Canadian province of British Columbia.

Route description

I-19 becomes an at-grade divided freeway just west of its southern terminus in Nogales. The US–Mexico border is just south of the Interstate (left of image).

In Nogales, the southern terminus of I-19 is at West Crawford Street, adjacent to the international port of entry, and southbound travelers can continue into Heroica Nogales, Mexico, via state-maintained surface roads, and connect with Federal Highway15 (Fed.15) either to the south or west of Nogales, Sonora.

Starting from the southern terminus at kilometer post0 (not milepost0), I-19 initially heads briefly south then west on surface streets, navigating its way through the town of Nogales for 0.32 kilometers (1,000ft; 0.20mi) before becoming an Interstate-grade freeway and making the turn to head north toward Tucson. It has interchanges with two other state highways near the southern end of the route, State Route189 (SR189) at exit4 and SR289 at exit12. The interchange with SR189 at exit4 both serves to funnel traffic so as to bypass around Nogales and Heroica Nogales for travelers bound to or from Hermosillo or Mexico City and provides for the continuous flow of freight and truck traffic through the larger Nogales-Mariposa Port of Entry to Fed.15, which has its northern terminus at the US–Mexico border with SR189 and its southern terminus 2,179 kilometers (1,354mi) away in Mexico City. After exiting Nogales to the north, I-19 passes near and around a series of sparsely populated towns and retirement communities along the banks of the Santa Cruz River, including Rio Rico, Tubac, Amado, Green Valley, and Sahuarita. For several miles near Amado and Green Valley, the eastward view from I-19 provides scenic views of Madera Canyon and the Santa Rita Mountains in the Coronado National Forest.

I-19 northbound at the I-10 interchange; the downtown Tucson skyline can be seen on the left.

Just before entering Tucson, I-19 passes through the eastern section of the San Xavier Indian Reservation where it makes its only crossing of the Santa Cruz River. As I-19 enters the Tucson city limits, it has an interchange with SR86 at exit99 before reaching its northern terminus at an interchange with I-10.

Nearly the entire route of I-19 follows, or is adjacent to, the former routing of US Route89 (US89) and the Santa Cruz River, which flows northward from Mexico, through Tucson and usually disperses into the desert between Marana and the Gila River, southeast of Phoenix. Most of the time, much of the river is dry, but heavy storms can cause it to overflow its banks, flooding farmland before reaching the Gila River.

Signage

Metric-unit advance guide sign on I-19, installed as part of the Valencia Road interchange renovation
Metric-unit advance guide sign on I-19, installed as part of the Valencia Road interchange renovation

I-19 is unique among US Interstates because signed distances are given in "meters" (hundreds or thousands as distance-to-exit indications) or "kilometers" (as distance-to-destination indications) like in Mexico and Canada, and not "miles". However, the speed limit signs give speeds in "miles per hour". According to the Arizona Department of Transportation (ADOT), metric signs were originally placed because of the push toward the metric system in the US at the time of the original construction of the highway.

I-19 had originally been signed as it was constructed, in a series of small signing contracts that used customary units. In 1980, ADOT awarded a single contract to install new signs which used metric units, to overlay customary-unit expressions on some existing signs with metric-unit expressions, to install kilometer posts, and to provide bilingual signing in select locations. The signing scheme used in 1980 provided explicit units on advance guide signs, but not on interchange sequence signs or post-interchange confirmation (distance) signs.

The expressions on advance guide signs were of the form "2km" (1.2 miles) for distances over one kilometer (0.62mi) and "500m" (0.31mi) for distances under one kilometer (0.62mi), with no provision for fractional kilometrages. On advance guide signs, the metric unit expressions "km" and "m" were placed on the baseline where "MILES" would otherwise have gone but were sized so that their lowercase loop height matched the uppercase letter height of "MILES" on customary-unit signs.

The exception was a handful of advance guide signs for the SR86 (Ajo Way) exit, which used "KM" (in uppercase, contrary to SI nomenclature) on the same baseline and at the same letter height as "MILES". The 1980 signing plans also provided design details for speed limit and advisory speed signs using metric units, with the limit values enclosed in a red circle on the speed limit sign and a black circle on the yellow-background advisory signs. These speed signs all had explicit units, with "km/h" below the circle enclosing the limit value. However, the advisory signs were canceled by change order and not installed.

Had the metric speed limit sign been installed, the signed speed limit on I-19 would have been 88 km/h, which is a close soft-conversion of the then-existing 55-mile-per-hour (88.51km/h) national maximum speed limit. As Arizona's current maximum speed limit is 75 miles per hour (121km/h), the metric equivalent would most likely read 120 kilometres per hour (74.56mph). Information signs, to three distinct designs, were also placed at various locations on or near I-19 to advise motorists that the highway was signed in metric. Notwithstanding the metric legends, the signing plans were dimensioned entirely in feet and inches.

In 1999, ADOT awarded two contracts (administered as a single construction project) to renew the signs along the full length of I-19. The general approach toward metric signing differed from that taken in 1980. Explicit units were given not just on advance guide signs, but also on interchange sequence signs, post-interchange confirmation signs, and community interchange signs (the last-listed had not been used in 1980). On the distance signs, "km" appeared after each kilometer measurement except when one or more of the distances was a fractional kilometer.

In such cases, all the distances were given in "meters", with "meters" (written out in full, not "m") after each distance value. On distance signs in general, "km" or "meters" appeared on the same baseline and with the same letter height as the distance values, while advance guide signs were formatted as in 1980. Since a typical ADOT freeway guide sign rehabilitation contract also replaces surface road signing near those roads' interchanges with the freeway, metric-unit signs also appeared on local roads near I-19, giving distances in kilometers to tourist attractions such as Mission San Xavier del Bac.

As was the case in 1980, the signing plans were dimensioned in feet and inches. However, a number of signs near the Valencia Road interchange were replaced or amended when it was converted from a partial cloverleaf interchange to a single-point urban interchange in 2000. One of these signs has a fractional kilometrage greater than one kilometer (0.62mi), rendered as "1500m" (0.93mi), while others use "m" rather than "meters" as the unit expression. Metric-unit expressions on the advance guide signs installed or modified as part of this contract appear on the same baseline as the metric values, rather than on a raised baseline as on other I-19 advance guide signs. Again, the plans were dimensioned in feet and inches.

Citing motorist confusion arising from the metric signs on I-19, ADOT's Tucson district announced that new signs on I-19 would use US customary units. To avoid the cost of replacing the metric signs all at once, signs would be replaced in specific areas of the freeway during construction projects in those areas. New signs were put into place between exit99 (Ajo Way) and exit101 (I-10) in 2004 after the completion of the new I-10/I-19 interchange.

As of 2010[update], the remainder of the project has been stalled due to local opposition, particularly from businesses that would have to change their directions.

A reconstruction project at the Interstate's northern terminus with I-10 in Tucson (at the interchange commonly called the Crossing) began in 2002 and was completed in August 2004.

History

The first sections of I-19 to be opened to traffic were a 4.8-kilometer (3mi) stub from I-10 to Valencia Road, in 1962 and a 3.2-kilometer (2mi) stretch in Green Valley in 1963. The freeway between Rio Rico and Nogales was completed in 1974. The major section between Green Valley and Rio Rico was finished in 1978. The official completion date of the I-19 segment between Tucson (km100) and Green Valley (actually Helmet Peak Road at km75) was February 12, 1972. A 1978 project report for ADOT lists the entire I-19 project as "completed", which includes segments between Green Valley and Nogales.

Future

I-19 is a very heavily traveled corridor in the Tucson metro area. The freeway is currently two lanes in both directions for most of its length, with the exception of the interchange with I-10 up until Irvington Road, where it transitions to four lanes. Current plans call for widening from Irvington Road to Valencia Road, bringing the freeway to three lanes in each direction. Future plans include expansion to up to five lanes in each direction by 2030 from the crossing with I-10 to San Xavier Road.

I-19 is also part of the proposed I-11 corridor between Nogales and Sahuarita.

Exit list

CountyLocationkmmiOld exitNew exitDestinationsNotes
Santa CruzNogales0.000.00BL19 (Grand Avenue) / Crawford StreetADOT defines this intersection as southern terminus; former US89/ SR93
0.280.17West StreetAt-grade intersection; south end of freeway; road continues as Compound Street
0.710.441AInternational StreetSouthbound exit only
1.901.181BWestern AvenueSigned as exit 1 northbound
4.762.9624SR189 (Mariposa Road)
8.555.3158BL19 (Grand Avenue)Southbound left exit and northbound entrance; former US89/ SR93
Rio Rico12.427.72712SR289 (Ruby Road)
17.5310.891017Rio Rico Drive / Yavapai Drive
22.4513.951322Peck Canyon Road
25.1715.641525Palo Parado Road
Tumacacori-Carmen29.3418.231829Tumacacori-CarmenTumacácori National Historical Park
Tubac34.9421.712134Tubac
TubacAmado line40.1024.922440Chavez Siding Road
Amado42.8426.622742Agua Linda Road
48.3930.073048Arivaca Road
PimaGreen Valley56.2634.963456Canoa Road
63.6339.543963Continental Road
65.7440.854065Esperanza Boulevard
Sahuarita69.7243.324369Duval Mine RoadFormer US89/ SR93, I-19 BL; Titan Missile Museum
75.4846.904675Sahuarita Road
San Xavier Indian Reservation80.3249.914980Pima Mine RoadDesert Diamond Casino, Tohono O'odham Nation
87.9854.675487Papago RoadDead end, U-turn only
92.0457.195692San Xavier RoadAccess to Mission San Xavier del Bac
Tucson95.1059.095895Valencia Road– TucsonTucson International Airport
98.3561.1198Irvington Road
99.9762.126199SR86 (Ajo Way)
101.6363.15101I-10 east– El PasoNorthbound exit and southbound entrance; I-10 exit 260
101.8463.2810229th Street / 22nd Street / Silverlake Road / Starr Pass BoulevardNorthbound exit and southbound entrance
102.0863.43I-10 west– PhoenixNorthern terminus; I-10 exit 260
1.000mi = 1.609km; 1.000km = 0.621mi Incomplete access

Business routes

Historically, I-19 has had two business loops, both of which are former sections of US89, SR93, and SR789. One is currently active while the other is decommissioned. Both business loops are currently and formerly recognized under the unsigned designation Arizona State Route19 Business (also known as State Business Route19).

Nogales loop

Map
A map of the Nogales business loop. The route is highlighted in red.
I-19 Bus. (Grand Avenue) junction with SR82 in Nogales

Interstate19 Business (I-19 Bus.) begins at the Mexican border in Nogales near the southern end of the Interstate. I-19 Bus. follows Grand Avenue in Nogales and has intersections with SR82 and SR189 before terminating at I-19 just north of Nogales. The route follows the former alignment of US89, SR93, and SR789, back when all three highways traversed through southern Arizona. The route has been commissioned as I-19 Bus. since US89 was decommissioned from southern Arizona in 1992.

Major intersections The entire route is in Santa Cruz County.

LocationmikmDestinationsNotes
Nogales0.000.00Fed.15 south– MexicoDennis DeConcini Port of Entry; international border with Mexico; continues south as Mexican Federal Highway 15
0.140.23I-19 north (Crawford Street)– TucsonADOT defines this intersection as southern terminus of I-19
1.662.67SR82 east (Patagonia Highway)– Patagonia
2.774.46SR189 south (Mariposa Road) to I-19
5.889.46I-19 northNorthern terminus; no access to I-19 south
1.000mi = 1.609km; 1.000km = 0.621mi Incomplete access

Sahuarita–Tucson loop

Map
A map of the Tucson business loop. The route is highlighted in red.

Interstate19 Business (I-19 Bus.) began at I-19 exit69 in Green Valley at West Duval Mine Road and South Nogales Highway. I-19 Bus. followed Nogales Highway north through unincorporated Pima County and Sahuarita into Tucson. In Tucson, I-19 Bus. curved from Nogales Highway onto South 6th Avenue where it served as the eastern terminus of SR86 at West Ajo Way, before terminating at I-10 exit261 and South 6thAvenue in South Tucson. The route follows the former alignment of US89, SR93, and SR789, back when all three highways traversed through southern Arizona. The route was commissioned as I-19 Bus. since US89 was decommissioned from southern Arizona in 1992. In 2002, the state handed maintenance of I-19 Bus. between Los Reales Road and I-10 to the city of Tucson. The rest of the route was handed over to Pima County and the city of Sahuarita in 2004. This also meant the designation was retired from the state highway system completely.

Major intersections The entire route was in Pima County.

LocationmikmDestinationsNotes
Green Valley43.8870.62I-19/ West Duval Mine Road– NogalesSouthern terminus; I-19 Exit69; road continues west as West Duval Mine Road
Sahuarita48.1577.49East Sahuarita Road to I-19
Tucson60.4197.22East Valencia Road to I-19/ I-10/ BL10Tucson International Airport
63.50102.19SR86 west (West Ajo Way) to I-19/ East Ajo Way– AjoEastern terminus of SR86
South Tucson64.12103.19I-10/ South 6th Avenue– Casa Grande, El PasoNorthern terminus; I-10 Exit261; road continues north as South 6th Avenue
1.000mi = 1.609km; 1.000km = 0.621mi

See also

External links

  • at Arizona Roads
  • at AARoad's Interstate Guide