Vermont Route289 (VT289) is a state highway located within the town of Essex, Vermont. It is a 3.94-mile-long (6.34km) limited-access highway that extends from VT2A southeast to VT117 on the north bank of the Winooski River. Most of VT289 is a two-lane undivided highway.

VT289 opened to traffic in October 1993 and comprises part of the Chittenden County Circumferential Highway, a proposed partial beltway around the northern and eastern suburbs of Burlington. The highway is proposed to begin at VT127 in Colchester and end at Interstate89 (I-89) in Williston.

Route description

The Circ, facing northwest in Essex VT

VT289 begins at a partial interchange with VT2A in the town of Essex. The route heads eastward through a deep rock cut as it bypasses the village of Essex Junction to the north. After 0.5 miles (0.80km), the rock cut gives way to a mixture of forests and open fields. VT289 narrows from three to two lanes as it curves southeast to interchange with VT15. East of VT15, the highway veers eastward to meet Essex Way, then gradually turns to the south toward the Winooski River as it traverses several small hills.

Midway between Essex Way and the riverbank, several unused ramps intended for an interchange with Allen Martin Parkway extend outward from VT289. The highway continues south to the Winooski River, where it terminates at a partial interchange with VT117 east of Essex Junction. VT289 is the first road in Vermont to have mile-based exit numbering.

History

Plans for a partial beltway around the northern and eastern fringes of Burlington first surfaced in the late 1970s. The limited-access highway was initially intended to be 15.8 miles (25.4km) long and four lanes wide, with two in each direction. After the United States Congress allocated $50 million (equivalent to $167million in 2025) to the project in 1982, the highway was intended to be built as Interstate289. The highway, named the Chittenden County Circumferential Highway, was to start at VT127 in Colchester and travel southeast to Interstate89 in Williston. Due to a lack of funding, it was to be initially constructed as a two-lane expressway. One of the main concerns that this road was to alleviate was the traffic congestion plaguing a five-way intersection in the center of Essex Junction.

In 1986, a final Environmental Impact Statement was co-released by the United States Department of Transportation and the Vermont Agency of Transportation (VTrans). Potential consequences of building a highway that met Interstate Highway standards in the area included noise impact on residential areas and disruption around archaeologically sensitive areas in the right-of-way. I-289 was effectively redesignated VT289 when the Vermont General Assembly added the road to the state highway system that same year.

In planning, the road was divided into ten alphabetical segments, A through J, ordered from southeast to northwest. Segments C, D, E, and F in Essex were completed and opened to traffic in October 1993.

Future

In May 2011, Vermont Governor Peter Shumlin announced that the Circumferential Highway, as originally conceived, would not be built, although the full right-of-way for the road had already been purchased. The Colchester and Williston portions are considered separate projects.

Segments A and B

On November 19, 2004, the United States Department of Transportation filed a notice of intent to complete an Environmental Impact Statement (EIS) on segments A and B of the proposed route; that is, the section between Interstate89 in Williston and the current eastern terminus at VT117 in Essex. This process has included meetings with the public to discuss the proposed project, as well assess alternatives. Some of the "short-list" include placing rotaries along VT2A, or placing traffic lights along VT289, when built. On August 3, 2007, a draft EIS was made available to the public. As planned, there would be one intermediate interchange on this segment of highway with IBM Road.

In February 2006, three separate public forums were held to discuss alternatives from the above short list and to allow the public to voice their concerns about present traffic situations. The first forum discussed VT2A, which has become an arterial road due to substantial development in the late 1990s and early 2000s around I-89's exit12 in Williston. It also serves as an artery for GlobalFoundries workers coming from the south and east. As a result, traffic on the highway has increased, and the road was quickly altered (additional lanes, lights, etc.) to accommodate what was then seen as a temporary problem.

The current southern terminus of VT 289, an at-grade intersection with VT 117

A second forum focused on "Five Corners", the intersection in the center of Essex Junction. Concerns voiced included the fact that the intersection is the junction of three major state highways—VT2A, VT15, and VT117—in a densely populated town center. While there was support for the construction of VT289, others suggested that construction of the highway would result in neglect of the local roads and that the highway would be built as opposed to a bicycle and pedestrian bridge on VT2A over the Winooski River.

A final forum was held on February9, 2006 to discuss the actual proposed highway. Most comments at this forum were concerned with aesthetics, such as the implementation of noise barriers. Also discussed were future concerns, such as speculation on further growth in the area and the potential for VT289 to be expanded into a four-lane highway.

Segments G through J

Segments G through J comprise the proposed western extension of VT289 to VT127 in Colchester. As proposed, there would be two intermediate interchanges along this section with I-89 and with Severance Road, a local highway providing access to U.S. Route2 and U.S. Route7.

Exit list

Mileage is measured from the proposed western terminus of VT289 at VT127 in Colchester. The entire route is in Chittenden County.

If the boulevard alternative is constructed in Williston, instead of the Redmond Road exit, there will be intersections with Mountain View Road and Williston Road (US Route 2) before the interchange with I-89.

LocationmikmExitDestinationsNotes
Colchester0.000.001VT127Colchester, BurlingtonProposed western terminus
3I-89Milton, BurlingtonProposed exit 16A on I-89
5Severance Road to US2/ US7/ VT127 westEastern terminus of VT 127
Essex7.8612.657VT2AColchester, Essex JunctionWestbound exit and eastbound entrance; current western terminus
9.5015.299VT15Essex
9.9015.9310Essex Way
11.0717.8211Allen Martin ParkwayExit is marked in the VTrans route log but has not been constructed although some ramps are present
11.8018.9912VT117EssexEastbound exit and westbound entrance; current eastern terminus
Williston13Redmond Road
15.1024.3015I-89Montpelier, BurlingtonProposed eastern terminus; proposed exit 11A on I-89
1.000mi = 1.609km; 1.000km = 0.621mi Incomplete accessUnopened

See also

External links