Line 2 is an under construction rapid transit line of the Ho Chi Minh City Metro, Vietnam. Line 2 is the city's second metro line, and will connect District 1 and District 12. The construction's phase 1, known as Bến Thành–Tham Lương began in January 2026, with an expected completion date of 2030. The phase length is 11.3-kilometer (7.0 mi) long with eleven stations.

The loan was to be provided by the Asian Development Bank (ADB), the German Development Bank (KfW), and the European Investment Bank (EIB). The project's total cost is VNĐ47,900 billion (US$2.04 billion). However, they later decided that the state budget would fund the project instead.

Route

The metro western branch line, including phase 1 starts at Bến Thành station in Bến Thành, District 1, passes through Phạm Hồng Thái, Cách Mạng Tháng Tám, and Trường Chinh streets underground, and elevated at Tân Bình station at before turn left to ends at Tham Lương depot in District 12. And for phase 3, from the Tân Bình station in Tân Bình district, the metro line continue to passes through National Route 22 in Hóc Môn, Củ Chi and ends at the border of the city with Tây Ninh province, all the stations and line of the phase are elevated. Both phases go to the northwest.

The eastern branch of the metro is the line phase 2, starts at Bến Thành station, passes underground of Hàm Nghi Boulevard and the Saigon River by a tunnel that parallel to the Saigon River Tunnel and continue to crosses the Mai Chí Thọ Boulevard then end at Thủ Thiêm station next to the An Phú intersection and the Rach Chiec National Sports Complex

Construction

The project comprises seven construction packages.

  • CP0 package: Relocation of technical infrastructure system
  • CP1 package: The official building and auxiliary works at Tham Lương depot.
  • CP2 package: Infrastructure at Tham Lương depot.
  • CP3 package (including CP3a and CP3b): Tunnels and Underground stations.
  • CP4 package: Transition Structure, Viaduct and Elevated Station.
  • CP5 package: E&M system.
  • CP6 package: Track work.
  • CP7 package: Non-System E&M.

Stations

PhaseStation numberStation nameLayoutTransfersLocation
TotalCurrent phase (1)English nameVietnamese nameWard (current name after 2025 reform)Former district-level
21—N/aThủ ThiêmUndergroundNorth–South Express (planned) Thủ Thiêm–Long Thành Light Rail (planned) L10 (planned)An Phú (Bình Trưng)Thủ Đức
2—N/aBình KhánhUndergroundL10 (planned)An Khánh
3—N/aInternational HospitalBệnh viện Quốc tếUndergroundAn Lợi Đông (An Khánh)
4—N/aYoung Pioneer PalaceCung Thiếu nhiUndergroundThủ Thiêm (An Khánh)
5—N/aCrescent BoulevardĐại lộ Vòng CungUnderground
6—N/aHàm NghiUndergroundSaigon (Bến Nghé)District 1
171Bến ThànhUndergroundL1 L4 (planned) Ben Thanh–Can Gio metroBến Thành
82Tao ĐànUndergroundL3 (planned)
93Dân ChủUndergroundL8 (planned)Xuân HòaDistrict 3, District 10
104Hòa HưngUndergroundNorth–South Railway L8 (planned) L9 (planned)Nhiêu Lộc, Hòa Hưng
115Lê Thị RiêngUnderground
126Phạm Văn HaiUndergroundTân Sơn Nhất, Tân Hòa, Bảy HiềnTân Bình
137Bảy HiềnUndergroundL5 (planned)
148Nguyễn Hồng ĐàoUndergroundTân Bình
159Bà QuẹoUndergroundL6 (planned) L9 (planned)Tân Bình, Tây Thạnh (of the former Tân Phú district)
1610Phạm Văn BạchUndergroundTân Sơn, Tây Thạnh (of the former Tân Phú district)
1711Tân BìnhElevated
218—N/aTân Thới NhấtElevatedTân Thới Nhất (Đông Hưng Thuận)District 12
19—N/aHưng ThuậnElevatedĐông Hưng Thuận
20—N/aAn Sương Bus TerminalBến xe An SươngElevatedTrung Mỹ Tây
3a21—N/aQuảng ĐứcElevated
22—N/aTân XuânElevatedTân Xuân (Hóc Môn)Hóc Môn
23—N/aBà TriệuElevated
24—N/aLý Thường KiệtElevatedHóc Môn
25—N/aThống NhấtElevatedTân Thới Nhì (Xuân Thới Sơn)
26—N/aTân ThớiElevated
27—N/aTân HiệpElevated
28—N/aAn HạElevatedTân Phú Trung (Củ Chi)Củ Chi
29—N/aDistrict Road 2Hương lộ 2Elevated
30—N/aTân Phú TrungElevated
31—N/aLê Minh NhựtElevated
32—N/aTân Thông HộiElevatedTân Thông Hội (Củ Chi)
33—N/aTrần Văn ChẩmElevated
34—N/aHuỳnh Văn CọElevated
35—N/aCủ ChiElevatedCủ Chi Town (Tân An Hội)
b36—N/aCủ Chi HospitalBệnh viện Củ ChiElevatedTân An Hội
37—N/aNguyễn Thị RànhElevated
38—N/aTrung ViếtElevatedPhước Hiệp (Tân An Hội)
39—N/aCây TrômElevated
40—N/aPhước HòaElevated
41—N/aPhước ThạnhElevatedPhước Thạnh (Thái Mỹ)
42—N/aProvincial Road 7Tỉnh lộ 7Elevated

Rolling stock

The rolling stock has not been announced yet, and in February 2024, German company Siemens was in talks with the government to build urban rail lines, including Ho Chi Minh City Metro Line 2. Line 2 will use electric multiple units. By 2030, it will use 3-car trains, then increase to 6 cars. Each train is 22 m long, 3.15 m wide, and 3.865 m high. Maximum axle load is 16 tons. The design speed is 90 km/h. Maximum operating speed is 80 km/h. The signaling system uses modern technology, ensuring scientific, efficient and safe train operation with automatic train control systems, automatic train monitoring, computer-based interlocking, train speed detection and measurement, data signal transmission, signal display system, depot signaling and interlocking system, disaster warning system and other auxiliary systems.