Line 2 is a north-south line of the Suzhou Metro. It passes through five districts of Suzhou, and has 22 stations, 17 underground and 5 elevated. It began operations on December 28, 2013.

History

The line was opened in two phases, with the 26.557 km (16.502 mi) long first phase from Suzhoubei Railway Station to Baodaiqiao South (宝带桥南) near Baodai Bridge started operations on December 28, 2013. This section consisted of 6.57 km (4.08 mi) of elevated track and 19.146 kilometres (11.897 mi) of underground track.

The 14.347 km (8.915 mi) second phase, running from Qihe to Fuxiang Lu in the north, and from Yinzhong Lu (尹中路) to Sangtiandao (桑田岛) in the east, commenced trial operations on September 24, 2016.

A north extension to Aigehao Road is under construction, and it's expected to open in 2026.

Opening timeline

SegmentCommencementLengthStation(s)Name
Suzhou North Railway Station — Baodaiqiao South28 December 201326.557 km (16.50 mi)22Phase 1
Qihe — Suzhou North Railway Station24 September 20162.2 km (1.37 mi)2Phase 2
Baodaiqiao South — Sangtiandao11.643 km (7.23 mi)11

Stations

Interchange signage in Guangji Nanlu station
Platform of Dushuhu Neighborhood Center station
Station nameConnectionsDistance kmLocation
EnglishChinese
Qihe骑河0.000.00Xiangcheng
Fuxianglu富翔路0.880.88
Suzhoubei Railway Station高铁苏州北站7 10 Suzhou North railway station OHH1.081.96
Dawan大湾1.513.47
Fuyuan Lu富元路1.985.45
Likou蠡口1.707.15
Xutu Gang徐图港1.408.55
Yangchenghu Zhonglu阳澄湖中路81.009.55
Lumu陆慕1.9311.48
Pinglonglu East平泷路东1.6413.12
Pinghelu平河路60.8113.93Gusu
Suzhou Railway Station苏州火车站4 Suzhou railway station SZH1.0614.99
Shantang Jie山塘街1.6216.61
Shi Lu石路0.9617.57
Guangji Nanlu广济南路10.8118.38
Sanxiang Square三香广场0.8819.26
Laodonglu劳动路50.6219.88
Xujiang Lu胥江路0.7720.65
Tongjing Park桐泾公园0.7321.38
Youlian友联1.2422.62
Panlilu盘蠡路31.1023.72Wuzhong
Xinjia Qiao新家桥1.0824.80
Shihu Donglu石湖东路41.6226.42
Baodaiqiao South宝带桥南1.8828.30
Yinzhong Lu尹中路1.5029.80
Guoxiang郭巷70.9030.70
Guoyuan Lu郭苑路1.0231.72
Yinshan Hu尹山湖1.0732.79
Dushuhu South独墅湖南0.8933.68
Dushuhu Neighborhood Center独墅湖邻里中心2.0335.71SIP
Moon Bay月亮湾0.9136.62
Songtaojie松涛街81.2337.85
Jingu Lu金谷路1.7539.60
Jinshang Lu金尚路61.3340.93
Sangtiandao桑田岛61.0742.00

Operations

Intervals

Weekdays & Weekends
PeriodTimeIntervals
Weekdays morning rush hours (Peak)7:45 — 9:006m10s
Weekdays evening rush hours (Peak)17:00 — 19:006m10s
Weekends daily rush hours (Peak)11:00 — 20:406m10s
Other hours (Normal)Exclude above rush hours6m50s

Rolling stock

Fleet numbersYear builtTime in serviceBuilderClassNumber in serviceNo of carAssemblyRolling stockNumberDepotsLine assignedNotes
105 (23 sets)2013-20152014-presentCSR Nanjing PuzhenB105 (23 sets)5Tc+Mp+M + Mp+TcPM061020101-022305 (0201-0223)Taiping Yard2
85 (17 sets)2014-20162016-presentCSR Nanjing PuzhenB85 (17 sets)5Tc+Mp+M + Mp+TcPM080022401-024005 (0224-0240)Taiping Yard2
100 (20 sets)2022-20232023-presentCRRC Nanjing PuzhenB100 (20 sets)5Tc+Mp+M + Mp+TcPM208022501-026005 (0225-0260)Taiping Yard2