Line 3 of the Changchun Rail Transit (Chinese: 长春轨道交通3号线; pinyin: Chángchūn Guǐdào Jiāotōng Sān Hào Xiàn) is a light rail line running from northwest to southeast Changchun. It was opened on 30 October 2002. Line 3 was later extended on 26 December 2006 and 31 December 2021. This line is currently 34.3 km (21.3 mi) long with 34 stations in operation.

Opening timeline

SegmentCommencementLengthStation(s)Name
Changchun Railway Station — Weiguang Street30 October 200214.9 km (9.26 mi)17Phase 1
Weixing Square — Changchun Movie Wonderland26 December 200617.0 km (10.56 mi)16Phase 2
Weiguang Street — Weixing Square3 April 2007n/aconnection of Phase 1 and 2
Furong Bridge28 November 2017-1(temporary closure)
Changchun Railway Station — Huxi Bridge8 March 2021-6
Huxi Bridge — Weimanhuanggong31 December 20212.4 km (1.49 mi)6East extension
Xi'an Bridge12 May 20231infill stations resumed
Furong Bridge30 May 20231

During the temporary closure of Changchun Railway Station — Huxi Bridge section, Liaoning Road station has permanently abandoned due to original station being too close to new Furong Bridge Station and new Changchun Railway Station, became the second case in China where a rapid transit station abandoned after Xinhualu of Tianjin line 1 on 9 December 2001.

Future development

A southern extension from Changchun Movie Wonderland to No.59 Middle School is under construction.

Stations

Service routeStation nameConnectionsDistance kmLocation
EnglishChineseStationTotal
Weimanhuanggong伪满皇宫4—N/a0.00Kuancheng / Nanguan
Dongguangchang东广场1.301.30Kuancheng
Changchun Railway Station长春站CJ~JH CB~BA Changchun railway station CCT 11.202.50
Furong Bridge芙蓉桥1.403.90Kuancheng / Luyuan
Xi'an Bridge西安桥1.205.10Chaoyang / Luyuan
Nanchang Road南昌路0.655.75
Chaoyang Bridge朝阳桥0.656.40
Jiefang Overpass解放桥21.007.40
Huxi Bridge湖西桥0.908.30Chaoyang
Kuanping Bridge宽平桥Trams in Changchun Trams 54 and 550.959.25
Fusong Road抚松路1.0510.30
Mengjiatun孟家屯Changchun South railway station CET 70.9011.20
at-grade crossing (Huguang Road)
Huguang Road湖光路0.8512.05
Diantai Street电台街51.6013.65
Qianjinxi前进西0.7014.35
Qianjin Street前进大街0.5014.85
at-grade crossing (Weiming Street)
Weiming Street卫明街0.7515.60
Weiguang Street卫光街1.0516.65Chaoyang / Nanguan
at-grade crossing (Weiguang Street)
Weixing Square卫星广场10.6517.30
Yatai Overpass亚泰立交桥1.2518.90Nanguan
Yitong River伊通河0.8519.75
Vocational Institute of Technology职业学院41.3521.10
Jilin TV & Radio Center吉林广电1.0522.15
Conference & Exhibition Center会展中心0.9023.05
Shiji Square世纪广场1.1024.15
Jinxin Street金鑫街1.5525.70
Boshuo Road博硕路0.8526.55
Jinhe Street金河街1.2027.75
Agricultural Expo Garden农博园0.9528.70
Jingyuetan National Park净月潭公园1.3030.00
Zishan Road紫杉路1.5031.50
Baoxiang Street宝相街1.0032.50
Ski Resort滑雪场1.2533.75
at-grade crossing (Liuying Dong(East) Road)
Changchun Movie Wonderland长影世纪城60.5534.30
  • Xiangtan Electric Q6W-1 class at Qianjinxi Station (2005)
  • Tangshan class at Changchun Railway Station (2006)
  • 2000 class at Jilin TV & Radio Center Station (2012)

See also

Notes