Line 3 (Xuzhou Metro)
In-game article clicks load inline without leaving the challenge.
Line 3 of the Xuzhou Metro (Chinese: 徐州地铁3号线) is a rapid transit line in Xuzhou city, Jiangsu province, China. It is the third metro line to open in Xuzhou.
History
Phase 1
Phase 1 of Line 3 was opened on June 28, 2021. It is 18.13 km in length and fully underground.
Phase 2
Phase 2 of Line 3 opened on 3 December 2024. It added 6 stations (5 stations in the Northern extension and 1 station in the Southern extension) and a total of 8.13 km in length (1.57 km South extension and 6.56 km North extension). The South extension is elevated and the North extension is underground.
Stations
| Station name | Connections | Distance km | Location | ||
|---|---|---|---|---|---|
| English | Chinese | ||||
| Zhenxingdadao | 振兴大道 | 0 | 0 | Gulou | |
| Pantao | 蟠桃 | ||||
| Jiangsu Xuzhou Higher Vocational School of Economics & Trading | 经贸学校 | 4 | |||
| Jinshanqiao | 金山桥 | ||||
| Yangzhuang | 杨庄 | ||||
| Xiadian | 下淀 | ||||
| Baiyunshan | 白云山 | ||||
| Xuzhou Railway Station | 徐州火车站 | 1 China Railway XCH | Gulou / Yunlong | ||
| Tianqiao | 天桥 | Yunlong | |||
| Hepingdaqiao | 和平大桥 | ||||
| Huaita | 淮塔 | 2 | Quanshan | ||
| CUMT Wenchang Campus | 矿大文昌校区 | ||||
| Nansanhuanlu | 南三环路 | 4 | |||
| Zhaishan | 翟山 | ||||
| Jiangsu Normal University | 师范大学 | Tongshan | |||
| Yuquanhe | 玉泉河 | 6 | |||
| Wumingshan Park | 无名山公园 | ||||
| Pujianglu | 浦江路 | ||||
| Jiaoshan | 焦山 | ||||
| Qianjianglu | 钱江路 | ||||
| Gaoxinqu'nan | 高新区南 | ||||
| Yinshan | 银山 | ||||