Line 4 is a loop line of the Shanghai Metro network. The older rolling stock 04A01 carry a bright purple colour belt to differentiate them from Line 3 trains which share a portion of its route, while the newer 04A02 stock features a yellow and purple livery, which the exact line is labelled using sticker or screens saying "Line 3" or "Line 4". To determine the direction of travel, the line that travels counter-clockwise is called the Outer Loop (外圈), while the other line is known as the Inner Loop (内圈). Although it is a loop line, trains returning to the depot use Yishan Road as a terminal to let all passengers disembark. The first segment of the line between Damuqiao Road and Lancun Road (running in a "C"-shape) opened on December 31, 2005. The remainder of the line opened on December 29, 2007. The line is colored purple on system maps.

History

Shanghai metro line 4 opening history
SegmentCommencementOpenedLengthStation(s)NameInvestment
Damuqiao Road — Hongqiao Road26 Dec 200031 Dec 20053.94 km (2.45 mi)5Pearl Line (second phase)¥12.6 billion
Hongqiao Road — Baoshan Road11.52 km (7.16 mi) (tracks sharing)9Line 3 & 4 realignment project
Baoshan Road — Lancun Road9.76 km (6.06 mi)8Pearl Line (second phase)
Lancun Road — Damuqiao Road22 Oct 200529 Dec 20078.7 km (5.41 mi)4Loop line connector project

The line became China's first national "Worker Pioneer" metro line on the 11th October, 2009.

Construction accident

On August 20, 2001, on 20.10 at Luban Road construction site during excavating the foundation pit, earthmoving sudden landslide, killing four people died who were buried in the landslide.

At 4 o'clock in the morning on July 1, 2003, the Pudongnan Road-Nanpu Bridge section of Line 4 suddenly saw water seepage during the construction of the connecting passage between the upper and lower tunnels. After that, a large amount of quicksand poured into the tunnel, causing internal and external pressure imbalance, which caused partial collapse of the tunnel. It has a funnel-shaped settlement. At 9 o'clock in the morning, the podium of a nearby building on South Zhongshan Road collapsed; beginning in the early morning of the July 2, the flood wall of Dongjiadu Waima Road section began to sink and crack due to the settlement. The embankment collapsed in a serious accident. The Linjiang Garden Building near the scene also experienced subsidence, the most serious settlement exceeded 7 millimeters (0.28 in) in an hour, and the cumulative settlement reached 15.6 millimeters (0.61 in). This incident affected the plan for the opening of the entire line of Line 4. In August 2004, the Dongjiadu section restoration project was started and it was restored with the opening of the second section in July 2007. On November 5, 2004, the Shanghai Second Intermediate People's Court issued a judgement on the deputy project manager of the subcontractor for the construction of the intermediate air shaft and side channel freezing method. The court convicted him for the crime of a major liability accident which has a fixed-term imprisonment of two years and six months and a probation of three years. The project director representative has a fixed-term imprisonment of six-month with a probation period of two years. The general contractor's project manager for two years with a fixed-term imprisonment of one year and six months.

At Hailun Road unbalanced subsidence was discovered. From January 22 to January 28, 2012, it was closed for an overhaul.

Stations

Service routes

Shanghai metro line 4 service routes
M - Mainline: Full Loop P - Partial Mainline: Linping RoadYishan Road
RoutesStation name3ConnectionsDistanceLocationOpen- ingPlat- form
MPEnglishChinesekmmin
— ↑ Loop line towards Shanghai Indoor Stadium (Outer Loop) ↑ —1.141.143
Yishan Road宜山路3 90.000.000Xuhui31 Dec 2005Underground Island
Hongqiao Road虹桥路101.371.373ChangningElevated Side
West Yan'an Road延安西路Trolleybuses in Shanghai Yan'an BRT1.412.785
Zhongshan Park中山公园20.963.747Elevated Island
Jinshajiang Road金沙江路131.665.4010PutuoElevated Side
Caoyang Road曹杨路11 140.906.3012
Zhenping Road镇坪路71.407.7014
Zhongtan Road中潭路1.449.1417
Shanghai Railway Station上海火车站1 China Railway Shanghai railway station SHH1.7210.8619Jing'anAt-grade Island
Baoshan Road宝山路2.0312.8923Elevated Island & Side
Hailun Road海伦路101.5114.4026HongkouUnderground Island
Linping Road临平路1.0715.4728Underground Island & Side
Dalian Road大连路121.4016.8730YangpuUnderground Island
Yangshupu Road杨树浦路0.7217.5932
Pudong Avenue浦东大道141.4419.0335Pudong
Century Avenue世纪大道2 6 91.4320.4637
Xiangcheng Road向城路0.8521.3139
Lancun Road蓝村路61.3422.6541
Tangqiao塘桥1.2123.864429 Dec 2007
Nanpu Bridge南浦大桥2.1325.9947HuangpuUnderground Split
South Xizang Road西藏南路81.2227.2149Underground Island
Luban Road鲁班路1.4728.6851
Damuqiao Road大木桥路121.1929.8753Xuhui31 Dec 2005
Dong'an Road东安路70.6230.4955
Shanghai Stadium上海体育场1.5132.0057
Shanghai Indoor Stadium上海体育馆10.6732.6759
— ↓ Loop line towards Yishan Road (Inner Loop) ↓ —1.1433.8162

Important stations

Station name change

Headways

Shanghai Metro Line 4 headway
TimeInner Loop (running clockwise)Outer Loop (running counterclockwise)
Monday - Friday (Working Days)
AM peak7:00–9:00Linping RoadCentury AvenueYishan Road: About 3 min and 10 sec Yishan Road → shared track w/ 3Linping Road: About 3 min and 45 secYishan Road - Century Avenue - Dalian Road: About 5 min and 30 min; Dalian Road - shared track w/ 3 - Yishan Road: About 7 min and 30 sec
Linping RoadCentury AvenueYishan Road:
About 3 min and 10 sec
Yishan Road → shared track w/ 3Linping Road:
About 3 min and 45 sec
Yishan Road - Century Avenue - Dalian Road:
About 5 min and 30 min;
Dalian Road - shared track w/ 3 - Yishan Road:
About 7 min and 30 sec
Off-peak9:00–17:00About 8 min
PM peak17:00–19:30About 5 min
Other hoursBefore 7:00 After 19:30About 5 - 12 min
Before 7:00
After 19:30
Saturday and Sunday (Weekends)
Peak7:00–21:00About 6 min and 30 sec
Other hoursBefore 7:00 After 21:00About 5 - 12 min
Before 7:00
After 21:00

Technology

Signaling

Line 4 has been operating over capacity due to large passenger flows for a number of years. With the continuous extensions of operating time, the problems of aging equipment and increasing passenger demand will further increase the operating pressure of the two lines. In June 2021 it was announced that Shanghai Metro has started to update of the signal system and finish before December 31, 2024. These are the last lines in the system that are equipped with fixed block Alstom URBALISTM 200 system, not equipped with CBTC systems capable of headways as low as 90 seconds. CASCO successfully won the bid for the renewal and transformation of the signaling using Qiji TACS system.

Rolling Stock

The line operates with 6-car Class A trains.

Shanghai Metro Line 4 rolling stock
Fleet numbersManufacturerTime of manufacturingClassNo of carAssemblyRolling stockNumberNotes
168Siemens (0401,0402) CRRC Zhuzhou Locomotive Co., Ltd. (0403–0428)2004-2007A6Tc+Mp+M+M+Mp+Tc04A010401-0428 (040011-041681)Original name: AC05. In February 2009, 8 trains used on line 2 (numbers: 0225-0232) returned to line 4.
162SATCO (0430–0455) CRRC Changchun Railway Vehicles Co., Ltd. (0429)2014-2017A6Tc+Mp+M+M+Mp+Tc04A020429-0455 (041691-043301)13 trains (042171-042941, trainset 0437-0449) have been assigned to line 3.
  • 04A01 train
  • 04A02 train