Line 8 (Ningbo Rail Transit)
In-game article clicks load inline without leaving the challenge.
The Line 8 of Ningbo Rail Transit (Chinese: 宁波轨道交通8号线) is a rapid transit line served Ningbo, Zhejiang, China.
Line 8 is built in accordance with the "Ningbo Urban Rail Transit Phase III Construction Plan (2021-2026)", along with Phase I of Line 6, Line 7; the western extension of Line 1, and the extension of Line 4. Total project investment is 19.9 billion RMB.. On 5 January 2022, first phase of Line 8 began construction. On 16 January 2025, Phase I of Line 8 begin trial operation. On 30 June 2025 at 10:00 am, the first phase of Line 8 from Kaiyuan Road to Hansong Road put into officially operation. The first phase of Line 8 has a total length of 23.3 kilometers, and the entire line is fully underground, with a total of 19 stations.
Line 8 designed by Guangzhou Metro Design and Research Institute Co., Ltd.; Zhejiang Huazhan Research and Design Institute Co., Ltd.
Opening Timeline
| Segment | Commencement | Length | Station(s) | Name |
|---|---|---|---|---|
| Hansong Road — Kaiyuan Road | 30 June 2025 | 21.8 km (13.55 mi) | 18 | Phase 1 |
| Hansong Road — Xiaying South | Under construction | 1.24 km (0.8 mi) | 1 | Phase 1 |
Stations

All 18 stations are underground. The entire journey will take approximately 38 minutes. In the early days of opening, the interval is 6 minutes during peak periods, 8 minutes during peak periods, and 10 minutes during low peak periods.
| Station name | Transfer | Distance km | Location | ||
|---|---|---|---|---|---|
| English | Chinese | ||||
| Kaiyuan Road | 开元路 | 0.00 | 0.00 | Jiangbei | |
| Hongtang | 洪塘 | ||||
| Hongsheng Road | 洪盛路 | ||||
| Hongda Road | 洪大路 | 4 | |||
| Xiejia | 榭嘉 | ||||
| Qinglinwan | 青林湾 | Haishu | |||
| Ningbo Traditional Chinese Medicine Hospital | 市中医院 | 6 | |||
| Zemin | 泽民 | 1 | |||
| Lianfeng | 联丰 | ||||
| Liyuan South Road | 丽园南路 | 2 | |||
| Nanyuan | 南苑 | ||||
| Duantang | 段塘 | ||||
| Jinshan West Road | 堇山西路 | Yinzhou | |||
| Miaoyan | 庙堰 | 5 | |||
| Yinzhou Park South | 鄞州公园南 | ||||
| Southern Business District | 南部商务区 | 3 | |||
| Xuefu Road | 学府路 | ||||
| Hansong Road | 寒松路 | ||||
| Xiaying South | 下应南 |
Commemorative Products


To celebrate Line 8 opened on 30 June 2025, Ningbo Rail Transit was sold set of 2 commemorative ticket. Like Line 6 commemorative ticket, each ticket only 15 rides total. There are 2 versions of commemorative ticket: A set without box: 139 RMB (Limited 2000 sets) and A set with hard cover box included Line 8 mini train building blocks: 199 RMB (Limited 200 sets). In parallel with sold commemorative ticket sets, Ningbo Rail Transit was also sold: Mini train and Little train building block set; other commemorative products related to Line 8 theme .