Maine State Route 11
In-game article clicks load inline without leaving the challenge.
State Route 11 (SR11) is a state highway in the U.S. state of Maine. It is a major interregional route which runs nearly the entire length of the state from south to north. The southern terminus of SR 11 is at the New Hampshire state line in Lebanon, where it connects to New Hampshire Route 11. The northern terminus is at U.S. Route 1 (US1) and SR161 in Fort Kent, near the Canada–US border. The highway travels through York, Cumberland, Androscoggin, Kennebec, Somerset, Waldo, Penobscot, Piscataquis and Aroostook counties. At 400.93 miles (645.23km) in length, SR11 is the longest state highway in Maine by a wide margin. However, it is not the longest numbered route in Maine, as US 1 runs for over 526 miles (847km) in the state.
SR 11, together with NH 11 and Vermont Route 11, forms a continuous multi-state route across northern New England that stretches for over 550 miles (890km) from Manchester, Vermont to Fort Kent, Maine.
History
1925: New England Interstate Route 11

The number 11 dates back to 1922 when the New England road marking system was adopted, although Maine did not take part until 1925. New England Route 11 was known as the Manchester-Biddeford Route, as it began in Manchester, Vermont and ended in Biddeford, Maine. The Maine section of Route 11 ran for 29 miles (47km). It followed the current routing of US 202/SR 11 between Lebanon and downtown Sanford, continued northeast into Alfred along modern US 202, then through Lyman and Arundel along modern SR 111 to terminate at Route 1 (the modern intersection of US 1 and SR 111) in Biddeford.
1926: State Route designation
In 1926, the U.S. Numbered Highway System was established and superseded the New England Interstate system. Some of the New England Interstate routes were integrated into the new system (such as Route 1, which became part of US 1). Route 11 did not become a U.S. Highway but was one of several that were redesignated as state highways and kept their existing numbers. State Route 11 was officially designated in 1926 and kept its existing routing until 1933.
1933-34: Renumbering and extension
Interregional route experiment
In 1931, the Maine State Highway Commission conducted an experiment in which it designated a new low-numbered state highway (SR 4) which ran mostly on existing alignments of the original 1925 intrastate routes (which were all numbered 100 and higher to avoid conflicts with the New England Interstate routes) and replaced several of the original numbers along those alignments. This effectively created a long interregional route that covered an important travel corridor between the New Hampshire and Canadian borders, all with a single route number.
This experiment proved to be a success, and the SHC decided to expand the interregional route system across the entire state highway system using low route numbers, including those from the original New England routes. Three-digit route numbers (and larger two-digit numbers) would be used to fill in shorter alignments to complement the interregional routes. This process began in 1933 and was finished in 1934. Many of the existing 1925 routes were truncated, overlapped with the new routes, or eliminated altogether. Routes which were completely eliminated generally had their numbers reassigned somewhere else in the system. By the time the renumbering project was finished, SR 11 was extended to 400 miles (640km).
Changes to SR 11
The original routing of SR 11 from the New Hampshire state line to downtown Sanford was maintained (and was overlapped by the newly designated US 202 in 1936). The SR 11 designation was dropped from the section between Sanford and Alfred, as it had already been made part of the new SR 4 in 1931 (and is now US 202/SR 4A) and the remaining segment east of Alfred was given the new SR 111 designation.
From downtown Sanford, SR 11 was cosigned with SR 109 into Shapleigh, completely replaced former SR 203 between Shapleigh and West Newfield, and replaced most of SR 110 from Newfield to Limington, where SR 11 crosses SR 25 today. New routing was used between Limington and Standish, then SR 11 was cosigned with SR 113 in Standish and Baldwin as it continues to be today. SR 11 used another section of new routing to reach Sebago, then was cosigned along the northern part of SR 114 to that route's terminus in Naples. SR 11 replaced former SR 116 between Sebago and Mechanic Falls (part of which is now overlapped by US 302 and SR 35), then was cosigned with SR 121 to that route's terminus in Auburn.
Between Auburn and Augusta, SR 11 was cosigned with SR 100 (which had just recently been extended as it too was intended to be a major interregional state highway). North of Augusta, SR 11 was routed onto an old alignment of SR 100 to Waterville (which is now part of SR 104). The highway then used new routing between Waterville and Corinth, part of which was shared with the newly designated SR 43. SR 11 was then cosigned with the newly designated SR 15 to Charleston, then split off on new routing as far as Lagrange, where it met up with SR 100 (modern SR 155).
SR 11 was cosigned with SR 100 (modern SR 155) between Lagrange and Howland, then with US 2 between Howland and Mattawamkeag, and finally with SR 157 between Mattawamkeag and Medway. SR 11 replaced former State Route 211 which ran between Medway and Sherman (near where exit 264 on I-95 is now located), and finally replaced nearly the entire length of SR 158 from Sherman to Fort Kent, terminating at US 1 and SR 161 as it does today.
Junction list
| County | Location | mi | km | Destinations | Notes |
|---|---|---|---|---|---|
| York | Lebanon | 0.00 | 0.00 | US202 west/ NH11 west (Highland Street)– Rochester | Continuation into New Hampshire |
| Sanford | 9.14 | 14.71 | SR11A north (Oak Street)– Springvale | Southern terminus of SR11A (southern segment) | |
| 12.50 | 20.12 | US202 east/ SR4A north (Winter Street)– Alfred SR4A south/ SR109 south (Main Street)– Wells | Northern terminus of US 202 concurrency, southern terminus of SR 109 concurrency | ||
| 14.54 | 23.40 | SR11A south (Oak Street)– Lebanon SR224 east (Bridge Street)– Alfred | Village of Springvale; northern terminus of SR11A (southern segment), western terminus of SR224 | ||
| Shapleigh | 18.70 | 30.09 | SR109 north– Acton | Northern terminus of SR 109 concurrency | |
| Newfield | 29.34 | 47.22 | SR110 west (Wakefield Road)– West Newfield | Eastern terminus of SR110 | |
| Limerick | 36.61 | 58.92 | SR5 south (Main Street)– Waterboro | Southern terminus of SR 5 concurrency | |
| 36.76 | 59.16 | SR5 north (Main Street) to SR160– Cornish | Northern terminus of SR 5 concurrency | ||
| Limington | 42.68 | 68.69 | SR117 (Cape Road)– Cornish, Hollis | ||
| 44.61 | 71.79 | SR25 (Ossipee Trail)– Kezar Falls, Cornish, Standish | |||
| Cumberland | Standish | 48.37 | 77.84 | SR113 south (Pequawket Trail)– Standish | Village of Steep Falls; southern terminus of SR 113 concurrency |
| Baldwin | 49.85 | 80.23 | SR113 north (Pequawket Trail)– Fryeburg SR107 begins | Northern terminus of SR 113 concurrency, southern terminus of SR107 | |
| 51.65 | 83.12 | SR107 north (Bridgton Road)– Sebago | Northern terminus of SR 107 concurrency | ||
| Sebago | 54.24 | 87.29 | SR114 south (Sebago Road)– East Sebago | Southern terminus of SR 114 concurrency | |
| Naples | 63.59 | 102.34 | US302 west (Roosevelt Trail)– Bridgton SR114 ends | Southern terminus of US 302 concurrency, northern terminus of SR 114 | |
| 64.07 | 103.11 | SR35 north (Harrison Road)– Harrison, Waterford | Southern terminus of SR 35 concurrency | ||
| 64.96 | 104.54 | US302 east/ SR35 south (Roosevelt Trail)– Raymond, Windham, Portland | Northern terminus of US 302/SR 35 concurrency | ||
| Casco | 68.97 | 111.00 | SR121 (Meadow Road)– Oxford, Raymond, Windham | ||
| 71.20 | 114.59 | SR85 south (Webbs Mills Road)– Raymond | Northern terminus of SR85 | ||
| Androscoggin | Poland | 78.43 | 126.22 | SR26 (Maine Street/Pigeon Hill Road)– Oxford, Norway, Gray | |
| Mechanic Falls | 81.26 | 130.78 | SR121 south– Oxford, Norway SR124 north (North Main Street)– West Minot | Southern terminus of SR 121 concurrency, southern terminus of SR 124 | |
| Minot | 84.79 | 136.46 | SR119 north– Hebron | Southern terminus of SR119 | |
| Auburn | 90.16 | 145.10 | US202 west/ SR4 south/ SR100 south (Washington Street) to I-95/ Maine Turnpike– Portland SR121 ends | Rotary; southern terminus of US 202/SR 4/SR 100 concurrency, northern terminus of SR121 | |
| 91.03 | 146.50 | SR4 north (Union Street)– Farmington | Northern terminus of SR 4 concurrency | ||
| 91.37 | 147.05 | SR136 south (Main Street) | Northern terminus of SR136 | ||
| Lewiston | 91.74 | 147.64 | SR196 east (Canal Street/Lisbon Street) | Western terminus of SR196 | |
| 91.97 | 148.01 | SR126 east (Sabattus Street)– Sabattus | Western terminus of SR126 | ||
| 92.85 | 149.43 | Russell Street– To SR4/ SR126/ SR196– Auburn, Lisbon | Interchange | ||
| Leeds | 103.71 | 166.91 | SR106 north– North Leeds | Southern terminus of SR106 | |
| Kennebec | Monmouth | 107.81 | 173.50 | SR132 south (Main Street)– Monmouth | Northern terminus of SR132 |
| Winthrop | 111.25 | 179.04 | SR41 north/ SR133 north (Western Avenue)– Winthrop Downtown, Readfield | Interchange Southern terminus of SR 41/SR 133 | |
| 114.22 | 183.82 | SR135 north (Stanley Road)– Readfield, Belgrade | Southern terminus of SR 135 concurrency | ||
| 114.34 | 184.01 | SR135 south (Winthrop Center Road)– East Monmouth | Northern terminus of SR 135 concurrency | ||
| Manchester | 117.57 | 189.21 | SR17 west (Readfield Road)– Readfield | Western terminus of SR 17 concurrency | |
| Augusta | 120.22 | 193.48 | I-95/ Maine Turnpike– Portland, Bangor | Exit109 on I-95; northern terminus of Maine Turnpike | |
| 121.93 | 196.23 | US201 south/ SR27 south (State Street)– Gardiner, Hallowell US201 north/ US202 east/ SR17 east/ SR100 north to SR3– Waterville, Rockland, Belfast SR8 begins | Rotary; northern terminus of US 202/SR 17/SR 100 concurrency, southern terminus of SR 27 concurrency, southern terminus of SR 8 | ||
| 122.72 | 197.50 | SR104 north (Bond Street)– Sidney | Southern terminus of SR104 | ||
| 124.96 | 201.10 | I-95 to Maine Turnpike– Portland, Lewiston, Waterville | Exit112 on I-95 | ||
| 126.79 | 204.05 | SR3 east (Old Belgrade Road) to I-95– Belfast | Western terminus of SR 3 | ||
| Sidney | 128.58 | 206.93 | SR23 north (Pond Road)– Oakland | Southern terminus of SR23 | |
| Belgrade | 133.77 | 215.28 | SR27 north (Augusta Road)– Belgrade Lakes, Farmington | Northern terminus of SR 27 concurrency | |
| 134.19 | 215.96 | SR135 south (Cemetery Road)– Belgrade Lakes, Readfield | Northern terminus of SR135 | ||
| 136.94 | 220.38 | SR8 north (Smithfield Road)– North Belgrade, Smithfield | Northern terminus of SR 8 concurrency | ||
| Oakland | 141.91 | 228.38 | SR23 (Summer Street/Water Street)– Sidney | ||
| 142.36 | 229.11 | SR137 west (Oak Street)– Smithfield | Southern terminus of SR 137 concurrency | ||
| 142.63 | 229.54 | SR23 (Oakland Road/Fairfield Street)– Fairfield Center | |||
| Waterville | 144.43 | 232.44 | I-95– Newport, Bangor, Augusta | Exit127 on I-95 | |
| 146.00 | 234.96 | SR104 south (W. River Road) | Southern terminus of SR 104 concurrency | ||
| 146.06 | 235.06 | SR137 east (Silver Street) to US201– China SR137 Bus. begins | Northern terminus of SR 137 concurrency; southern terminus of SR 137 Bus. | ||
| 146.78 | 236.22 | SR137 Bus. (Silver Street)– Winslow | Northern terminus of SR 137 Bus. concurcurrency | ||
| 147.32 | 237.09 | US201 south/ SR100 south (Main Street) SR104 north (Main Street) | US201/SR100 one-way southbound on Main Street; southern terminus of US 201/SR 100 concurrency, northern terminus of SR 104 concurrency | ||
| 147.66 | 237.64 | US201/ SR100 (Front Street) | Northbound US201/SR100 join from one-way Front Street | ||
| Somerset | Fairfield | 150.46 | 242.14 | US201 north/ SR139 west (Upper Main Street) | Northern terminus of US 201 concurrency, southern terminus of SR 139 concurrency |
| Kennebec | Benton | 152.61 | 245.60 | SR100A south (Clinton Avenue)– Winslow | Northern terminus of SR100A |
| 152.67 | 245.70 | SR139 east (Sebasticook Bridge Road)– Unity, Albion | Northern terminus of SR 139 concurrency | ||
| Clinton | 156.87 | 252.46 | Baker Street/Hinckley Road– To I-95 | To Exit138 on I-95 | |
| Somerset | Pittsfield | 169.89 | 273.41 | SR69 east (Hunnewell Avenue)– Detroit | Western terminus of SR69 |
| 169.96 | 273.52 | SR152 north (Somerset Avenue) to I-95– Hartland | Southern terminus of SR152 | ||
| Palmyra | 173.95 | 279.95 | SR220 south (Hurds Corner Road)– Detroit | Northern terminus of SR220 | |
| 176.27 | 283.68 | I-95– Waterville, Bangor | Exit157 on I-95 | ||
| Penobscot | Newport | 176.67 | 284.32 | US2/ SR7 south/ SR100 north (Main Street)– Skowhegan, Sugarloaf, Newport | Rotary; northern terminus of SR 100 concurrency, southern terminus of SR 7 concurrency |
| Corinna | 182.81 | 294.20 | SR43 west (St. Albans Road)– St. Albans | Southern terminus of SR 43 concurrency | |
| 182.88 | 294.32 | SR7 north (Dexter Road)– Dexter, Moosehead Lake Region SR222 east (Stetson Road)– Stetson | Northern terminus of SR 7 concurrency, western terminus of SR 222 | ||
| Corinth | 197.01 | 317.06 | SR94 west (Garland Road)– Garland | Eastern terminus of SR94 | |
| 198.64 | 319.68 | SR15 south (Main Street)– Kenduskeag | Southern terminus of SR 15 concurrency | ||
| 198.76 | 319.87 | SR43 east (Hudson Road)– Hudson | Northern terminus of SR 43 concurrency | ||
| Charleston | 200.46 | 322.61 | SR15 north (Dover Road)– Dover-Foxcroft | Northern terminus of SR 15 concurrency | |
| 202.17 | 325.36 | SR11A north (Main Road)– Atkinson | Southern terminus of SR11A (northern segment) | ||
| Bradford | 207.04 | 333.20 | SR221 south– Hudson SR155 north (East Road)– Bradford | Northern terminus of SR221, southern terminus of SR155 | |
| 209.24 | 336.74 | SR11A south (Upper Charleston Road)– Charleston | Northern terminus of SR11A (northern segment) | ||
| Piscataquis | Milo | 219.32 | 352.96 | SR6 east/ SR16 east (Elm Street)– Orono | Southern terminus of SR 6/SR 16 concurrency |
| 221.56 | 356.57 | SR6 west/ SR16 west (West Main Street)– Dover-Foxcroft | Northern terminus of SR 6/SR 16 concurrency | ||
| Penobscot | Millinocket | 260.19 | 418.74 | SR11B (Poplar Street)/ Katahdin Avenue | Unsigned southern terminus of SR 11B |
| 260.52 | 419.27 | SR157 begins (Central Street) Katahdin Avenue – Baxter State Park | Western terminus of SR157 | ||
| 260.71 | 419.57 | SR11B (Penobscot Avenue) | Northern terminus of SR 11B, signed in southbound direction only | ||
| Medway | 270.39 | 435.15 | SR116 south (Pattagumpus Road)– Woodville, Chester | Northern terminus of SR116 | |
| 271.12 | 436.33 | SR157 east (Medway Road)– Mattawamkeag | Eastern terminus of SR 157 concurrency | ||
| Aroostook | Sherman | 296.11 | 476.54 | SR158 east (Main Street) to I-95– Sherman | Western terminus of SR158, to Exit264 on I-95 |
| Penobscot | Patten | 305.03 | 490.90 | SR159 east (Houlton Street) to I-95– Island Falls | Southern terminus of SR 159 concurrency; to Exit276 on I-95 |
| 305.46 | 491.59 | SR159 west (Shin Pond Road)– Shin Pond, Baxter State Park | Northern terminus of SR 159 concurrency | ||
| Aroostook | Moro Plantation | 321.32 | 517.11 | SR212 east to I-95– Smyrna, Houlton | Western terminus of SR212, to Exit286 on I-95 |
| Ashland | 352.38 | 567.10 | SR163 east (Presque Isle Road)– Presque Isle | Western terminus of SR163 | |
| 352.67 | 567.57 | SR227 east (Frenchville Road)– Presque Isle | Western terminus of SR227 | ||
| Fort Kent | 400.93 | 645.23 | US1/ SR161 (Main Street)– Clair NB, Allagash, Van Buren | Northern terminus of SR11 | |
| 1.000mi = 1.609km; 1.000km = 0.621mi Concurrency terminusIncomplete accessTolled |
Alternate routes
State Route 11A
There are two separate highways in Maine designated SR 11A. Although they share a route number, they are located over 180 miles (290km) apart on SR 11.
Southern segment
The southern segment of SR 11A is located in York County, entirely within the city of Sanford, and is 3.27 miles (5.26km) in length. Locally it is known as Oak Street. The route was designated in 1931 as a bypass of the downtown area. Its southern terminus is at US 202 and SR 11 west of downtown and its northern terminus is at the intersection with Main Street (SR 11/SR 109) and Bridge Street (SR 224) north of downtown.
Junction list
The entire route is in Sanford, York County.
| mi | km | Destinations | Notes |
|---|---|---|---|
| 0.00 | 0.00 | US202/ SR11 (Carl Broggi Highway)– Lebanon, Rochester NH | Southern terminus |
| 3.27 | 5.26 | SR11/ SR109 (Main Street)– Lebanon, Acton, Shapleigh SR224 east (Bridge Street)– Alfred | Northern terminus |
| 1.000mi = 1.609km; 1.000km = 0.621mi |
Northern segment
SR11A is 6.61-mile-long (10.64km) loop of SR 11 located in Penobscot County. It is a former alignment of both SR11 and SR 15. SR 11A directly serves the town of Charleston, which modern SR 11 bypasses to the south. The southern terminus is at SR 11 in Charleston and the northern terminus is at SR 11 in the neighboring town of Bradford. The road is known locally as Main Road and Upper Charleston Road.
The route currently occupied by SR 11A was originally designated as part of SR 15 in 1926. When SR 11 was extended in 1933-1934, it was cosigned with SR 15 along this stretch of road, intersecting with SR 221 north of downtown Bradford. SR 221 was truncated from its former terminus in Brownville to this junction. In 1960, SR 15 was moved onto a more heavily utilized western bypass of Charleston, splitting from SR 11 further south of town and leaving the section through downtown Charleston signed solely as SR 11. Between 1984 and 1985, SR 11 was moved onto a new alignment which bypassed Charleston to the south, traveled due east into downtown Bradford where it intersected with SR 155 and SR 221, and was cosigned with SR 221 north to rejoin with the existing alignment north of town. At that time, the orphaned route through downtown Charleston was designated as SR 11A.
SR 221 no longer connects directly to SR 11A as it was further truncated to its junction with SR 11 and SR 155 in downtown Bradford between 2007 and 2011.
Junction list
The entire route is in Penobscot County.
| Location | mi | km | Destinations | Notes |
|---|---|---|---|---|
| Charleston | 0.00 | 0.00 | SR11 (Main Road/Bradford Road)– Bradford, Bradford Center | Southern terminus |
| Bradford | 6.61 | 10.64 | SR11 (Main Road)– Milo | Northern terminus |
| 1.000mi = 1.609km; 1.000km = 0.621mi |
State Route 11B
SR11B is a 0.31-mile-long (0.50km) business route of SR11 in Millinocket. Most of the route travels from north to south along one-way Penobscot Avenue through the central business district of the town. It begins at the intersection of Central Street (SR11/SR157) and Penobscot Avenue, travels south to Poplar Street, then turns west along Poplar Street and becomes a two-way street for one block before ending at Katahdin Avenue (SR11).
Signage is only posted in the westbound or southbound direction on SR 11/SR 157, and on SR 11B itself. SR 11B is not signed with directional banners as it is only designed to be driven in one direction. No signage is posted along SR11 at Poplar Street or Katahdin Avenue at SR 11B's southern end; northbound traffic is directed to continue on SR 11 into downtown. Signage for the route appears to have been installed between 2007 and 2014.
Junction list
Mileage in the state route log increases from north to south, as the route can only be driven in that direction.
The entire route is in Millinocket, Penobscot County.
| mi | km | Destinations | Notes |
|---|---|---|---|
| 0.00 | 0.00 | SR11/ SR157 (Central Street) | Northern terminus |
| 0.31 | 0.50 | SR11 (Poplar Street/Katahdin Avenue)– Brownville | Southern terminus |
| 1.000mi = 1.609km; 1.000km = 0.621mi |