A national outline plan (Hebrew: תוכנית מתאר ארצית, Tokhnit Mit'ar Artzit, abbr. תמ"א, Tama) refers to a zoning and development statutory plan in a specific field on a national level in Israel. A national outline plan is meant to affect the entire country and influences planning on the regional and local levels. In general, each national plan is augmented by more local plans that discuss its implementation in more detail. National outline plans are drafted by the National Planning and Construction Committee or the National Infrastructure Committee, and approved by the government of Israel.

The first national outline plan, created by architect Aryeh Sharon, was approved in 1951, and dealt with settling the Negev and Galilee regions. However, this plan was never implemented. The first national plan to be put to practical use was National Outline Plan 3, approved in 1976, dealing with road infrastructure in the country.

List of current national outline plans

#DescriptionApproval resolutionApproval dateNotes
1National master plan that unifies most National Outline PlansJanuary 12, 2020
3National road infrastructure plan. Discusses road and highway classifications and major routes.902August 1, 1976
4Partial plan for the Ben Gurion International Airport (then Lod International Airport), Israel's main airport.550April 20, 1969
5Partial plan for connecting the Ben Gurion International Airport to Tel Aviv.214December 5, 1968
6Plan for the population distribution in the country.1975
7National plan for institutions that are able to zone public facilities such as hospitals, colleges and universities and stadiums.June 29, 1975
8National park and nature reserve plan, including a list of parks and reserves.693June 21, 1981
10Partial plan for power plants and the electricity distribution system.488February 18, 1973
11National plan for lake and water reservoir creation, and the utilization of above-ground water sources.438February 26, 1984
12National plan for tourist installations.1214January 9, 1983
13Plan for Lake Kinneret shoreline development and preservation.November 11, 1981
14Partial plan for mining and quarry sites, primarily in the north of the country.3615April 9, 1998
15National airport and heliport plan. Does not include military airports, the Ben Gurion International Airport and Sde Dov Airport.1597May 4, 2000
16National garbage disposal plan.255March 2, 1989
18National fuel station plan.985August 22, 1976
19National cemetery plan.872November 17, 1987
21National plan for the development and preservation and Independence War sites.1980November 14, 1981
22National forestry plan.November 1, 1995
23National railroad plan.1675June 15, 1986
24National prison plan. Includes construction standards and mapping existing and planned prisons.430March 7, 1982(in Hebrew)
27National plan for cement.[clarification needed]
28National plan for radio relay stations, including the Voice of America.
29Plan for memorial sites in the Jerusalem and Haifa districts.
30Plan for the southern Haifa Bay.2008
31National plan for immigrant absorption.674January 17, 1993
32National plan for the liquefied petroleum gas industry.1964July 13, 2000
33National plan for providing sites for quick temporary housing. The plan was drafted in response to the Aliyah from the former Soviet Union in the 1990s.
34National water management and sewerage plan.409March 19, 2003
35National construction and development plan until 2020. The plan aims to provide answers for the balance between zoning and infrastructure development, nature preservation, and other subjects.4467November 27, 2005Set to serve as a basis for a National Outline Plan for Uganda.
36National cellular infrastructure plan. Deals primarily with cellular antennae.1759May 2, 2002
37National natural gas plan.2933February 28, 2001
38National plan for strengthening buildings against earthquakes.3537April 14, 2005
39Development plan for the Nitzanim – northern Ashkelon region.4466November 28, 2005
40Development and defense of underground facilitiesTBD
41Energy infrastructureTBD
42Land transportation2008Set to replace plans 3 and 23
43Defense installations and infrastructureMay 13, 2008
44Urban development for non-Jewish population in northern IsraelMay 12, 2009
46Detention center for infiltrators from EgyptFebruary 10, 2011
47Housing plan for future IDF basesTBD
49National healthcare planTBD
70Development plan for the Tel Aviv MetroTBD

Future

As of 2013, there is a plan to merge all National Outline Plans, except Plan 35, to one master plan.

External links