Proton-M (Протон-М, GRAU index 8K82M or 8K82KM) is an expendable Russian heavy-lift launch vehicle derived from the Soviet-developed Proton. It is built by Khrunichev, and launched from sites 81/24 and 200/39 at the Baikonur Cosmodrome in Kazakhstan.

First launched in 2001, the rocket has flown 116 launches with 105 successes. Primarily commercial launches of communications satellites to geosynchronous transfer, marketed by International Launch Services (ILS), it has also flown Russian state satellites such as GLONASS, Ekspress, and Blagovest.

In 2013, the rocket was intended to be retired before 2030. Since 2018, Proton has been approaching retirement; Russia's Angara A5, a replacement in the heavy-lift role, conducted four test flights and one operational flight between 2014 and 2025. No new launch service contracts for Proton are likely to be signed; its latest scheduled launches are the Science Power Module 1 to the ISS and an Ekspress satellite, both in 2029. Proton flew its most recent mission on 12 February 2026.

Vehicle description

Proton-M rollout

The Proton-M launch vehicle consists of three stages; all of them powered by liquid rocket engines using the hypergolic propellant combination of dinitrogen tetroxide as the oxidizer, and unsymmetrical dimethylhydrazine for fuel.

The first stage is unique in that it consists of a central cylindrical oxidizer tank with the same diameter as the other two stages with six fuel tanks attached to its circumference, each carrying an engine. The engines in this stage can swivel tangentially up to 7.0° from the neutral position, providing full thrust vector control. The rationale for this design is logistics: the diameter of the oxidizer tanks and the two following stages is the maximum that can be delivered by railroad to Baikonur. However, within Baikonur the fully assembled stack is transported again by rail, as it has enough clearance.

The second stage uses a conventional cylindrical design. It is powered by three RD-0210 engines and one RD-0211 engine. The RD-0211 is a version of the RD-0210 modified with a heat exchanger used to pressurize the propellant tanks. The second stage is joined to the first stage through a net instead of a closed inter-stage, to allow the exhaust to escape because the second stage begins firing seconds before separation. Known as "hot staging," this eliminates the need for ullage thrusters on the second stage. Thrust vector control is provided by engine gimballing.

The third stage is also of a conventional cylindrical design. It contains the avionics system that controls the first two stages. It uses one RD-0213 which is a fixed (non-gimballed) version of the RD-0210, and one RD-0214 which is a four nozzle vernier engine used for thrust vector control. The nozzles of the RD-0214 can turn up to 45.0°; they are placed around (with some separation), and moderately above the nozzle of the RD-0213.

The Proton-M features modifications to the lower stages to reduce structural mass, increase thrust, and utilise more propellant. A closed-loop guidance system is used on the first stage, which allows more complete consumption of propellant. This increases the rocket's performance slightly compared to previous variants, and reduces the amount of toxic chemicals remaining in the stage when it impacts downrange. It can place up to 21,000 kilograms (46,000lb) into low Earth orbit. With an upper stage, it can place a 3000kg payload into geostationary orbit (GEO), or a 5500kg payload into geostationary transfer orbit (GTO). Efforts were also made to reduce dependency on foreign component suppliers.

Upper stage

Most Proton-M launches have used a Briz-M upper stage to propel the spacecraft into a higher orbit. Launches have also been made with Blok-DM upper stages: six launches were made with the Blok DM-02 upper stage carrying GLONASS spacecraft, while seven further launches have used the Blok DM-03. As of 2023, only a single Proton-M launch has taken place without an upper stage to launch Nauka and the European Robotic Arm (ERA) to the International Space Station in July 2021.

Payload fairing

Proton-M/Briz-M payload fairing

Commercial launches conducted by ILS use two kinds of fairings:

  • PLF-BR-13305 short fairing.
  • PLF-BR-15255 long fairing.

Both fairings have a diameter of 4.35 meters.

Proton-M Enhanced (M+)

On 7 July 2007, International Launch Services launched the first Proton-M Enhanced rocket (also called M+), which carried the DirecTV-10 satellite into orbit. This was the 326th launch of a Proton, the 16th Proton-M/Briz-M launch, and the 41st Proton launch to be conducted by ILS. It features more efficient first stage engines, updated avionics, lighter fuel tanks and more powerful vernier engines on the Briz-M upper stage, and mass reduction throughout the rocket, including thinner fuel tank walls on the first stage, and use of composite materials on all other stages. The second launch of this variant occurred on 18 August 2008, and was used to place Inmarsat 4 F3 into orbit. The baseline Proton-M was retired in November 2007, in favour of the Enhanced variant.

Frank McKenna, CEO of ILS, has indicated that in 2010 the Phase III Proton design would become the standard ILS configuration, with the ability to lift 6150kg to GTO.

On 19 October 2011, ViaSat-1 weighing 6740kg was lifted into GTO by the Proton-M/Briz-M Phase III.

Light and Medium variants

Proton Light and Proton Medium were two proposed variants with a lower payload capacity at a reduced price. Originally proposed end of 2016, Proton Light was cancelled in 2017 [citation needed] and Proton Medium was put on "indefinite hold" in 2018. The variants were designed to reduce the cost for launching medium and small commercial communications satellites into Geostationary Transfer Orbit (GTO). The variants were planned with a 2 + 1 stage architecture based on 3 stage Proton/Briz M, but dispensing with the 2nd stage and featuring minor lengthening of the other two stages. The Proton Light 1st stage was planned with 4 main engines and external tanks to the 6 used by Proton Medium and Proton-M. The cost was expected to be competitive with Ariane and SpaceX. The planned maiden flights were 2018 for Proton Medium and 2019 for Proton Light. They were expected to use Baikonur Cosmodrome Site 81/24 and would have required a new transporter-erector system and other ground infrastructure changes.

The full-sized Proton-M can currently lift 6300kg into a standard Geostationary Transfer Orbit (GTO); Proton Medium was planned to lift 5000kg into a similar GTO while Proton Light was rated for 3600kg. The 3000–5000kg payload range includes all-electric and hybrid satellites that use ion thrusters to slowly make their way into geostationary orbit (GEO).

Launch profile

In a typical mission, a Proton-M is accompanied by a Briz-M upper stage. The Proton-M launches the orbital unit (that is: the payload, the payload adapter and the Briz-M) into a slightly suborbital trajectory. The first and second stages and the payload fairing crash into designated crash sites; the third stage crashes into the ocean. After the third stage separates, the orbital unit coasts for a brief period, then Briz-M performs its first firing to achieve orbital injection into a parking orbit with 51.5° inclination, at 170km to 230km altitude (the Mission Planner's Guide also mentions 64.8° and 72.6° as standard inclinations for the parking orbit). Subsequently, the Briz-M performs orbital maneuvers to place the payload into either its final orbit or a transfer orbit. If a transfer orbit is used the final maneuver(s) are performed by the payload on its own propulsion system.

Reliability

Proton-M in assembly building awaiting rollout

As of 22June2024[update], 115 Proton-M launches had occurred, of which 11 failed or partially failed, yielding a success rate of 90%. Four of these failures were the results of problems with the Proton-M itself, six were caused by the Briz-M upper stage malfunctioning and leaving cargo in a useless orbit (albeit on two instances the satellites were able to maneuver to correct orbit under their own propulsion), and one was the result of a Blok DM-03 upper stage being incorrectly fueled, leaving the Proton too heavy to achieve orbit.

Notable launch failures

In September 2007, a Proton-M/Briz-M rocket carrying Japan's JCSAT-11 communications satellite failed to achieve orbit, and fell in the Ulytau District of Kazakhstan. An investigation determined that first and second stages of the rocket had failed to separate, due to a damaged pyrotechnic cable.

On 5 December 2010, the upper stage and payloads failed to reach orbital velocity due to overloading of the upper stage with 1500kg of liquid oxygen, resulting in the loss of three GLONASS satellites it was carrying.

In July 2013, a Proton-M/DM-03 carrying three GLONASS satellites failed shortly after liftoff. The booster began pitching left and right along the vertical axis within a few seconds of launch. Attempts by the onboard guidance computer to correct the flight trajectory failed and ended up putting it into an unrecoverable pitchover. The upper stages and payload were stripped off 24 seconds after launch due to the forces experienced followed by the first stage breaking apart and erupting in flames. Impact with the ground occurred 30 seconds after liftoff. The preliminary report of the investigation into the July 2013 failure indicated that three of the first stage angular velocity sensors, responsible for yaw control, were installed in an incorrect orientation. As the error affected the redundant sensors as well as the primary ones, the rocket was left with no yaw control, which resulted in the failure. Telemetry data also indicated that a pad umbilical had detached prematurely, suggesting that the Proton may have launched several tenths of a second early, before the engines reached full thrust.

In May 2014, another Proton-M launch ended in failure, resulting in the loss of an Ekspress telecommunications satellite. Unlike the 2013 crash, this occurred more than nine minutes into the flight when one of the third stage verniers shut off, causing loss of attitude control. An automatic shutdown and destruct command was issued and the remains of the upper stages and payload impacted in northern China. An investigation committee concluded that the failure was most likely due to one of the turbopumps breaking off its mount, rupturing a propellant line and causing the vernier to lose thrust.

In May 2015, a Proton-M with a Mexican telecommunications satellite, MexSat-1, was lost due to problems with the third stage. Russian sources indicated that the problems had been the same as with the 2014 failure. An investigation determined that the third stage vernier engine RD-0214 failed due to excessive vibration loads, which had been caused by an increasing imbalance of the rotor in the turbopump and concluded it was the same cause of a prior accident in 1988.

In a June 2016 launch, one of the four second stage engines shut down prematurely. The Briz-M was able to make up for the resulting stage under-performance and deliver the Intelsat 31 satellite to the intended orbit. Pending an investigation, the rocket was grounded for the rest of 2016 and first half of 2017: Proton-M at that time planned to return to the launch pad around June 2017 to deliver the EchoStar-21 satellite to orbit.

On 28 January 2017, the Russian government announced, as a result of the investigation into the failure of Progress MS-04, the recall of all Proton-M 2nd and 3rd stage engines produced by the Voronezh Mechanical Plant, including the disassembly of three completed Proton rockets and a three and a half month suspension of flights. The investigation found that cheaper alternatives, unable to resist high temperatures, had been used in place of engine parts containing valuable minerals, and that production and certification documentation had been falsified.

Proton returned to flight 8 June 2017, a full year after the previous flight on 6 June 2016.

Upper stage malfunctions

Among the various Proton-M failures, some have been caused by the upper stages used to allow the rocket to deliver payloads to higher orbit, notably the failures in May 2014 and May 2015.

At least five earlier launches also succumbed to problems with the Briz-M upper stage; Arabsat-4A in February 2006, AMC-14 in March 2008, Ekspress AM4 in August 2011, Telkom-3 and Ekspress MD2 in August 2012 and Yamal-402 in December 2012. All of the payloads were unusable except for Yamal-402, which was able to correct its orbit at the expense of several years' operational life, and AMC-14 which was sold to the US Government after SES determined that it couldn't complete its original mission.

Effect on government and industry

As a result of the July 2013, Proton-M launch failure, a major reorganization of the Russian space industry was undertaken. The United Rocket and Space Corporation was formed as a joint-stock corporation by the government in August 2013 to consolidate the Russian space sector. Deputy Prime Minister Dmitry Rogozin said "the failure-prone space sector is so troubled that it needs state supervision to overcome its problems". Three days following the failure, the Russian government had announced that "extremely harsh measures" would be taken "and spell the end of the [Russian] space industry as we know it".

Environmental impact

Critics claim that Proton rocket fuel (unsymmetrical dimethylhydrazine (UDMH)) and debris created by Russia's space programme is poisoning areas of Russia and Kazakhstan. Residents claim that acid rain falls after some launches. Anatoly Kuzin, deputy director of the Khrunichev State Research and Production Space Center, has however denied these claims, saying: "We did special research into the issue. The level of acidity in the atmosphere is not affected by the rocket launches [and] there is no data to prove any link between the illnesses, in Altai town and the influence of rocket fuel components or space activity of any kind".[undue weight?– discuss]

Launch History

Flight No.Date / time (UTC)Rocket, ConfigurationLaunch sitePayloadPayload massOrbitUsersLaunch outcome
535-017 April 2001 03:47:00Proton-M/Briz-MSite 81/24Russia Ekran-M №4 (Ekran-M 18L)GeosynchronousRSCCSuccess
Maiden flight of the Proton-M
535-0229 December 2002 23:16:40Proton-M/Briz-MSite 81/24Canada Nimiq-2Geosynchronous transferTelesatSuccess
535-0315 March 2004 23:06:00Proton-M/Briz-MSite 81/24France Eutelsat W3AGeosynchronous transferEutelsatSuccess
535-0616 June 2004 22:27:00Proton-M/Briz-MSite 200/39United States Intelsat-10-02Geosynchronous transferIntelsatSuccess
535-074 August 2004 22:32:00Proton-M/Briz-MSite 200/39Spain Amazonas 1Geosynchronous transferHispasatSuccess
535-0814 October 2004 21:23:00Proton-M/Briz-MSite 200/39United States AMC-15Geosynchronous transferSES AmericomSuccess
535-093 February 2005 02:27:32Proton-M/Briz-MSite 81/24United States AMC-12Geosynchronous transferSES AmericomSuccess
535-1022 May 2005 17:59:08Proton-M/Briz-MSite 200/39United States DirecTV-8Geosynchronous transferDirecTVSuccess
535-128 September 2005 21:53:40Proton-M/Briz-MSite 200/39Canada Anik-F1RGeosynchronous transferTelesatSuccess
535-1329 December 2005 02:28:40Proton-M/Briz-MSite 200/39United States AMC-23Geosynchronous transferSES AmericomSuccess
535-1128 February 2006 20:10:00Proton-M/Briz-MSite 200/39Saudi Arabia Arabsat-4A (Badr-1)Geosynchronous transfer (Intended)ArabsatFailure
Briz-M upper stage shut down prematurely due to a burn through in the oxidizer supply system during the second burn.
535-144 August 2006 21:48:00Proton-M/Briz-MSite 200/39France Hot Bird 8Geosynchronous transferEutelsatSuccess
535-158 November 2006 20:01:00Proton-M/Briz-MSite 200/39Saudi Arabia Arabsat-4B (Badr-4)Geosynchronous transferArabsatSuccess
535-2111 December 2006 23:28:43Proton-M/Briz-MSite 200/39Malaysia MEASAT-3Geosynchronous transferMEASATSuccess
535-169 April 2007 22:54:00Proton-M/Briz-MSite 200/39Canada Anik-F3Geosynchronous transferTelesatSuccess
535-207 July 2007 01:16:00Proton-M/Briz-MSite 200/39United States DirecTV-10Geosynchronous transferDirecTVSuccess
535-225 September 2007 22:43:10Proton-M/Briz-MSite 200/39Japan JCSAT-11Geosynchronous transfer (intended)Sky Perfect JSATFailure
The first and second stages of the rocket failed to separate due to a damaged pyrotechnic firing cable.
535-2317 November 2007 22:39:47Proton-M/Briz-MSite 200/39Sweden Sirius 4Geosynchronous transferSES SiriusSuccess
Commercial launch from ILS
535-269 December 2007 00:16Proton-M/Briz-MSite 81/24Russia Raduga-1M №1GeosynchronousSuccess
Military communications satellite
535-2825 December 2007 19:32:34Proton-M/Block-DM-2Site 81/24Russia Kosmos 2434 (GLONASS-M №721) Russia Kosmos 2435 (GLONASS-M №722) Russia Kosmos 2436 (GLONASS-M №723)Medium EarthSuccess
GLONASS-M launch
535-2728 January 2008 00:18:00Proton-M/Briz-MSite 200/39Russia Ekspress-AM33GeosynchronousRSCCSuccess
Ekspress satellite launch
535-2411 February 2008 11:34:00Proton-M/Briz-MSite 200/39Norway Thor 5Geosynchronous transferTelenorSuccess
Commercial launch from ILS
535-2514 March 2008 23:18:55Proton-M/Briz-MSite 200/39United States AMC-14Geosynchronous transfer (intended)SES AmericomFailure
Commercial launch from ILS. Briz-M upper stage shut down prematurely due to rupturing of the gas duct between the gas generator and the propellant pump turbine by high heat erosion.
935-0219 August 2008 22:43:00Proton-M/Briz-MSite 200/39United Kingdom Inmarsat 4-F3Geosynchronous transferInmarsatSuccess
Commercial launch from ILS
535-2919 September 2008 21:48:00Proton-M/Briz-MSite 200/39Canada Nimiq-4Geosynchronous transferTelesatSuccess
Commercial launch from ILS
535-3125 September 2008 08:49:37Proton-M/Block-DM-2Site 81/24Russia Kosmos 2442 (GLONASS-M №724) Russia Kosmos 2443 (GLONASS-M №725) Russia Kosmos 2444 (GLONASS-M №726)Medium EarthSuccess
GLONASS-M launch
535-3315 November 2008 20:44:20Proton-M/Briz-MSite 200/39Luxembourg Astra 1MGeosynchronous transferSES AstraSuccess
Commercial launch from ILS
935-0310 December 2008 13:43:00Proton-M/Briz-MSite 200/39Canada Ciel-2Geosynchronous transferCielSuccess
Commercial launch from ILS
535-3425 December 2008 10:43:42Proton-M/Block-DM-2Site 81/24Russia Kosmos 2447 (GLONASS-M №727) Russia Kosmos 2448 (GLONASS-M №728) Russia Kosmos 2449 (GLONASS-M №729)Medium EarthSuccess
GLONASS-M launch
935-0110 February 2009 00:03:00Proton-M/Briz-MSite 200/39Russia Ekspress-AM44 Russia Ekspress-MD1GeosynchronousRSCCSuccess
Ekspress satellite launch
410-1628 February 2009 04:10:00Proton-M/Block-DM-2Site 81/24Russia Raduga-1 №8 (Globus-18L)GeosynchronousSuccess
Military Comsat launch
935-043 April 2009 16:24:00Proton-M/Briz-MSite 200/39France Eutelsat W2AGeosynchronous transferEutelsatSuccess
Commercial launch from ILS
935-0516 May 2009 00:57:38Proton-M/Briz-MSite 200/39United States ProtoStar 2 (SES-7)Geosynchronous transferProtoStarSuccess
Commercial launch from ILS
935-0630 June 2009 19:10:00Proton-M/Briz-MSite 200/39United States Sirius FM-5Geosynchronous transferSirius XMSuccess
Commercial launch from ILS
935-0711 August 2009 19:47:33Proton-M/Briz-MSite 200/39China AsiaSat 5Geosynchronous transferAsiaSatSuccess
Commercial launch from ILS
935-0817 September 2009 19:19:19Proton-M/Briz-MSite 200/39Canada Nimiq-5Geosynchronous transferTelesatSuccess
Commercial launch from ILS
935-0924 November 2009 14:19:10Proton-M/Briz-MSite 200/39France Eutelsat W7Geosynchronous transferEutelsatSuccess
Commercial launch from ILS
535-3814 December 2009 10:38:27Proton-M/Block-DM-2Site 81/24Russia Kosmos 2456 (GLONASS-M №730) Russia Kosmos 2457 (GLONASS-M №731) Russia Kosmos 2458 (GLONASS-M №732)Medium EarthSuccess
GLONASS-M launch
935-1029 December 2009 00:22:00Proton-M/Briz-MSite 200/39United States DirecTV-12Geosynchronous transferDirecTVSuccess
Commercial launch from ILS
535-3528 January 2010 00:18:00Proton-M/Briz-MSite 81/24Russia Raduga-1M №2 (Globus-M 12L)GeosynchronousSuccess
Military Communications satellite
535-3212 February 2010 00:39:40Proton-M/Briz-MSite 200/39United States Intelsat 16Geosynchronous transferIntelsatSuccess
Commercial launch conducted by International Launch Services
535-401 March 2010 21:19:44Proton-M/DM-2Site 81/24Russia Kosmos 2459 (GLONASS-M №731) Russia Kosmos 2460 (GLONASS-M №732) Russia Kosmos 2461 (GLONASS-M №735)Medium EarthSuccess
GLONASS-M launch
935-1420 March 2010 18:26:57Proton-M/Briz-MSite 200/39United States EchoStar XIVGeosynchronous transferEchoStarSuccess
Launch under ILS
935-1124 April 2010 11:19:00Proton-M/Briz-MSite 200/39United States SES-1Geosynchronous transferSESSuccess
Commercial launch conducted by International Launch Services, Communications
935-123 June 2010 22:00:08Proton-M/Briz-MSite 200/39Saudi Arabia Arabsat-5B (Badr-5)Geosynchronous transferArabsatSuccess
Commercial launch conducted by International Launch Services, Communications
935-1510 July 2010 18:40:36Proton-M/Briz-MSite 200/39United States EchoStar XVGeosynchronous transferEchoStarSuccess
Commercial launch conducted by International Launch Services, Communications
535-302 September 2010 00:53:50Proton-M/DM-2Site 81/24Russia Kosmos 2464 (GLONASS-M №736) Russia Kosmos 2465 (GLONASS-M №737) Russia Kosmos 2466 (GLONASS-M №738)Medium EarthSuccess
GLONASS-M launch
935-1614 October 2010 18:53:21Proton-M/Briz-MSite 81/24United States XM-5Geosynchronous transferXM Satellite Radio HoldingsSuccess
Commercial launch conducted by International Launch Services, Communications
935-1314 November 2010 17:29:20Proton-M/Briz-MSite 200/39Canada SkyTerra-1Geosynchronous transferSkyTerraSuccess
Commercial launch conducted by International Launch Services, Communications
535-375 December 2010 10:25:19Proton-M/DM-03Site 81/24Russia GLONASS-M №739, 740, 741Medium Earth (intended)Failure
First flight of the Blok-DM-03 upper stage. The upper stage and payloads failed to reach orbital velocity due to overloading of the upper stage with 1.5 tonnes of liquid oxygen, which was caused by communication error between engineers.
935-1726 December 2010 21:51:00Proton-M/Briz-MSite 200/39France KA-SATGeosynchronous transferEutelsatSuccess
Commercial launch conducted by International Launch Services, Communications
935-6730 July 2020 21:25:19Proton-M / Briz-MSite 200/39Russia Ekspress-80 Russia Ekspress-1034390 kg total 2110 kg and 2280 kgGeosynchronous transferRSCCSuccess
Communications satellites launch
535-4521 July 2021 14:58Proton-MSite 200/39Russia Nauka20200 kgLow Earth (ISS)RoscosmosSuccess
ISS module launch
535-4613 December 2021 12:07Proton-M / Briz-MSite 200/39Russia Ekspress-AMU3 Russia Ekspress-AMU74130 kg total 1980 kg and 2150 kgGeosynchronousRSCCSuccess
Communications satellites
935-7112 October 2022 15:00Proton-M / DM-03Site 81/24Angola AngoSat-21964kgGeosynchronousGGPENSuccess
Communications satellite launch
935-705 February 2023 09:12:51Proton-M / DM-03Site 81/24Russia Elektro-L №43000kgGeosynchronousRoscosmosSuccess
Weather satellite launch
935-7312 March 2023 23:12:59Proton-M / Briz-MSite 200/39Russia Olymp-K №23000kgGeosynchronousRoscosmosSuccess
SIGINT satellite launch
935-6812 February 2026 08:52:15Proton-M / DM-03Site 81/24Russia Elektro-L №5 Iran Jame-e-Jam 13000kgGeosynchronousRoscosmosSuccess
Last launch of Proton-M/DM-03 configuration and future launch using DM-03 will be on Angara A5.

Planned launches

Date / time (UTC)Rocket ConfigurationLaunch sitePayloadPayload typeOrbitUsers
2026Proton-M / Briz-MBaikonurIran EkvatorCommunicationsGeosynchronousISA
Communications satellite built by ISS Reshetnev for Iran.
2026Proton-M / Briz-MBaikonurRussia Ekspress-AMU4CommunicationsGeosynchronousRSCC
2026Proton-M / Briz-MBaikonurRussia Yamal-501 Russia Luch-5VM №1CommunicationsGeosynchronousGazprom Space Systems Gonets Satellite System
2029Proton-M / Briz-MBaikonurRussia Ekspress-AMU6CommunicationsGeosynchronousRSCC
2029Proton-MBaikonurRussia NEMSpace station moduleLow Earth (ISS)Roscosmos
Science Power Module (NEM) for the future Russian Orbital Station. Originally planned for launch on Proton-M to the ISS, before being transferred to Angara-A5 at 98.0°. In December 2025, the launch was transferred back to Proton-M to the ISS.

Gallery

See also

Notes