vteSōya Main Line
km Hakodate Main Line 0.0 Asahikawa Furano Line Asahikawa Electric Tramway 1.8 Asahikawa Asahikawa Electric Tramway Gyushu Betsugawa 3.7 Shin-Asahikawa Nippon Paper Sekihoku Main Line 6.6 Kita-Asahikawa 20 kV50 Hz AC 7.2 Nishi-Nagayama 9.3 Nagayama Nagayama Shinkawa 11.4 Kita-Nagayama0 12.0 Kita-Nagayama ( originallocation ) Ishikari River bridge No. 3 14.7 Minami-Pippu 17.1 Pippu 20.2 Kita-Pippu Bifu River 22.8 Ranru 28.4 Shiokari 36.3 Wassamu 41.4 Higashi-Rokusen Kenbuchigawa bridge No.1 45.2 Kenbuchi 50.2 Kita-Kenbuchi Ibushubetsu River Kenbuchigawa bridge No.2 53.9 Shibetsu Nissan Teshiogawa 58.3 Shimo-Shibetsu 61.7 Tayoro 64.5 Mizuho 68.1 Fūren Kazeren Betsugawa 74.1 Nayorokōkō Hokuyo PaperNayoro Mill NayoroMain Line │ ShimmeiLine 76.2 Nayoro Nayoro River 80.2 Nisshin 84.9 Chitō 89.3 Hokusei 91.2 Chiebun 93.3 Chihoku Kamishinbugawa 95.6 Minami-Bifuka Bikō Line 98.3 Bifuka 101.9 Hatsuno Shimoshinfu River 105.0 Momponai 112.1 Onnenai 117.9 Toyoshimizu 121.5 Teshiogawa-Onsen 124.7 Sakkuru 129.3 Otoineppu Tempoku Line Otoiko Fukawa 135.6 Osashima 143.1 Kamiji 153.6 Saku 158.2 Kotohira 161.9 Teshio-Nakagawa Shimonogawa 165.8 Shimo-Nakagawa 170.3 Utanai 175.8 Toikambetsu Quseun Betsugawa Nucanan River 178.0 Nukanan Qping viaduct Nishikigawa 181.5 Kami-Onoppunai ShimodairaTunnel│Viaduct 183.7 Onoppunai 189.7 Yasuushi 191.6 Minami-Horonobe 194.6 Kami-Horonobe Penkeo Boppe River 199.4 Horonobe Haboro Line 205.6 Minami-Shimonuma 207.2 Shimonuma Onnai Betsugawa Pankeeve Korobetsu River Pankeeve Korobetsu River Teshio Mintetsu Railwayto Nisso Coal Mine 215.9 Toyotomi 220.9 Tokumitsu 226.6 Ashikawa Mosarobetsu River Sarobetsu River spillway Sarobetsu River 230.9 Kabutonuma Yuchi River bridge No. 1 236.7 Yūchi Yuchi River bridge No. 2 245.0 Bakkai Kutonebetsu River Tempoku Line 256.7 Minami-Wakkanai to Wakkanai harbor 259.4 Wakkanai Wakkanai Pier Chihaku Ferryto Korsakov km
km
Hakodate Main Line
0.0Asahikawa
Furano Line
Asahikawa Electric Tramway
1.8Asahikawa
Asahikawa Electric Tramway
Gyushu Betsugawa
3.7Shin-Asahikawa
Nippon Paper
Sekihoku Main Line
6.6Kita-Asahikawa 20 kV50 Hz AC
20 kV
50 Hz AC
7.2Nishi-Nagayama
9.3Nagayama
Nagayama Shinkawa
11.4Kita-Nagayama0
12.0Kita-Nagayama ( originallocation )
original
location
Ishikari River bridge No. 3
14.7Minami-Pippu
17.1Pippu
20.2Kita-Pippu
Bifu River
22.8Ranru
28.4Shiokari
36.3Wassamu
41.4Higashi-Rokusen
Kenbuchigawa bridge No.1
45.2Kenbuchi
50.2Kita-Kenbuchi
Ibushubetsu River
Kenbuchigawa bridge No.2
53.9Shibetsu
Nissan
Teshiogawa
58.3Shimo-Shibetsu
61.7Tayoro
64.5Mizuho
68.1Fūren
Kazeren Betsugawa
74.1Nayorokōkō
Hokuyo PaperNayoro Mill
Hokuyo Paper
Nayoro Mill
NayoroMain Line │ ShimmeiLine
Nayoro
Main Line
Shimmei
Line
76.2Nayoro
Nayoro River
80.2Nisshin
84.9Chitō
89.3Hokusei
91.2Chiebun
93.3Chihoku
Kamishinbugawa
95.6Minami-Bifuka
Bikō Line
98.3Bifuka
101.9Hatsuno
Shimoshinfu River
105.0Momponai
112.1Onnenai
117.9Toyoshimizu
121.5Teshiogawa-Onsen
124.7Sakkuru
129.3Otoineppu
Tempoku Line
Otoiko Fukawa
135.6Osashima
143.1Kamiji
153.6Saku
158.2Kotohira
161.9Teshio-Nakagawa
Shimonogawa
165.8Shimo-Nakagawa
170.3Utanai
175.8Toikambetsu
Quseun Betsugawa
Nucanan River
178.0Nukanan
Qping viaduct
Nishikigawa
181.5Kami-Onoppunai
ShimodairaTunnel│Viaduct
Shimodaira
Tunnel│Viaduct
183.7Onoppunai
189.7Yasuushi
191.6Minami-Horonobe
194.6Kami-Horonobe
Penkeo Boppe River
199.4Horonobe
Haboro Line
205.6Minami-Shimonuma
207.2Shimonuma
Onnai Betsugawa
Pankeeve Korobetsu River
Pankeeve Korobetsu River
Teshio Mintetsu Railwayto Nisso Coal Mine
Teshio Mintetsu Railway
to Nisso Coal Mine
215.9Toyotomi
220.9Tokumitsu
226.6Ashikawa
Mosarobetsu River
Sarobetsu River spillway
Sarobetsu River
230.9Kabutonuma
Yuchi River bridge No. 1
236.7Yūchi
Yuchi River bridge No. 2
245.0Bakkai
Kutonebetsu River
Tempoku Line
256.7Minami-Wakkanai
to Wakkanai harbor
259.4Wakkanai
Wakkanai Pier
Chihaku Ferryto Korsakov
Chihaku Ferry
to Korsakov
km
Local train at Otoineppu Station
Wakkanai Station, the northern extremity of the Japanese railway system

The Sōya Main Line(宗谷本線, Sōya-honsen) is a Japanese railway line operated by Hokkaido Railway Company (JR Hokkaido) in Hokkaido. The line connects Asahikawa Station in Asahikawa and Wakkanai Station in Wakkanai, and is the northernmost railway line in Japan. The name comes from Sōya Subprefecture.

On 19 November 2016, JR Hokkaido's president announced plans to rationalize the network by up to 1,237 km, or ~50% of the current network, including proposed conversion of the Nayoro - Wakkanai section of the Soya Line to Third Sector operation, but if local governments are not agreeable, the section will face closure.

Services

One Sōya limited express service operates each way between Sapporo and Wakkanai daily, and two Sarobetsu limited express services also operate each way between Asahikawa and Wakkanai daily.

All-stations "Local" train services operate between Asahikawa and Nayoro, at approximately 1 to 2 hour intervals. All-stations "Local" train services operate between Nayoro and Wakkanai, at approximately 3 to 4 hour intervals. Four Rapid Nayoro services operate between Nayoro and Asahikawa in each direction daily.

Stations

L: Limited Express (Sōya / Sarobetsu )

R: All Rapid Nayoro services

r: Some Rapid Nayoro services

-: Some local trains skip marked stations

StationDistance (km)Limited Express Sōya / Sarobetsu / Rapid NayoroConnectionsLocation
A28Asahikawa旭川0.0L RHakodate Main LineSekihoku Main LineFurano LineAsahikawa
A29Asahikawa-Yojō旭川四条1.8r■ Sekihoku Main Line
A30Shin-Asahikawa新旭川3.7■ Sekihoku Main Line
Kita-Asahikawa Freight Terminal北旭川(貨)6.6
Nishi-Nagayama (Closed 1 November 1967)西永山7.2
W31Nagayama永山9.3R
W32Kita-Nagayama北永山11.4-
W33Minami-Pippu (Closed 13 March 2021)南比布14.7Pippu, Kamikawa
W34Pippu比布17.1R
W35Kita-Pippu (Closed 13 March 2021)北比布20.2
W36Ranru蘭留22.8R
W37Shiokari塩狩28.4Wassamu, Kamikawa
W38Wassamu和寒36.3L R
W39Higashi-Rokusen (Closed 13 March 2021)東六線41.4Kenbuchi, Kamikawa
W40Kembuchi剣淵45.2R
W41Kita-Kembuchi (Closed 13 March 2021)北剣淵50.2
W42Shibetsu士別53.9L RShibetsu
W43Shimo-Shibetsu (Closed 13 March 2021)下士別58.3
W44Tayoro多寄61.7r
W45Mizuho瑞穂64.5-
W46Fūren風連68.1rNayoro
W47Nayorokōkō名寄高校74.1R
W48Nayoro名寄76.2L RNayoro Main Line (Closed 1989) ■ Shinmei Line (Closed 1994)
W49Nisshin日進80.2
Chitō (Closed 18 March 2006)智東87.9
W50Hokusei (Closed 13 March 2021)北星89.3
W51Chiebun智恵文91.2
W52Chihoku智北93.3-
W53Minami-Bifuka (Closed 13 March 2021)南美深95.6Bifuka, Nakagawa
W54Bifuka美深98.3L■ Bikō Line (Closed 1985)
W55Hatsuno (Closed 16 March 2024)初野101.9
W56Momponai (Closed 13 March 2021)紋穂内105.0
W57Onnenai (Closed 16 March 2024)恩根内112.1
W58Toyoshimizu signal base (Converted 13 March 2021)豊清水信号場117.9
W59Teshiogawa-Onsen天塩川温泉121.5-Otoineppu, Nakagawa
W60Sakkuru咲来124.7
W61Otoineppu音威子府129.3LTempoku Line (Closed 1989)
W62Osashima筬島135.6
Kamiji signal base (Converted 25 May 1977, closed 14 March 1985)神路信号場143.1Nakagawa, Nakagawa
W63Saku佐久153.6
Kotohira (Closed 1 September 1990)琴平158.2
W64Teshio-Nakagawa天塩中川161.9L
Shimio-Nakagawa (Closed 1 July 2001)下中川165.8
W65Utanai (Closed 13 March 2022)歌内170.3
W66Toikanbetsu問寒別175.8Horonobe, Teshio
W67Nukanan糠南178.0
Kami-Onoppunai (Closed 1 July 2001)上雄信内181.5
W68Onoppunai (Closed 15 March 2025)雄信内183.7
W69Yasuushi (Closed 13 March 2021)安牛189.7
W70Minami-Horonobe (Closed 15 March 2025)南幌延191.6
W71Kami-Horonobe (Closed 13 March 2021)上幌延194.6
W72Horonobe幌延199.4LHaboro Line (Closed 1987)
Minami-Shimonuma (Closed 18 March 2006)南下沼205.6
W73Shimonuma下沼207.2
W74Toyotomi豊富215.9LToyotomi, Teshio
W75Tokumitsu (Closed 13 March 2021)徳満220.9
Ashikawa (Closed 18 March 2006)芦川226.6
W76Kabutonuma兜沼230.9
W77Yūchi勇知236.7Wakkanai
W78Bakkai (Closed 15 March 2025)抜海245.0
W79Minami-Wakkanai南稚内256.7LTempoku Line (Closed 1989)
W80Wakkanai稚内259.4L

Northern extremity: W80 Wakkanai

Closed stations

History

The line was originally built as part of a link between mainland Japan and the then Japanese northern frontier of Karafuto (southern half of Sakhalin Island). From Wakkanai Port, a ferry to then Ōdomari (present Korsakov) operated until the end of World War II.

The first segment of the line from Asahigawa (present Asahikawa) to Nagayama was built by the Hokkaido Government Railway in 1898. The line was extended to Nayoro in 1903, and to Wakkanai in 1922 along the route of the later Tempoku Line (天北線, Tenpoku-sen) via Hamatombetsu. The present route via Horonobe was opened as part of the Teshio Line (天塩線, Teshio-sen).

After Japan's defeat in the war, the line lost its function as a link to Sakhalin, but remained important as a trunk line into the northern part of Hokkaido. The Sōya Main Line gradually lost all of its branch lines, and presently constitutes a long branch from the Hakodate Main Line.

Timeline

  • August 12, 1898: Opened as Teshio Line(天塩線, Teshio-sen) (I) of Hokkaido Government Railway, between Asahigawa (present Asahikawa) and Nagayama
  • November 25, 1898: Extended to Ranru
  • November 15, 1899: Extended to Wassamu
  • August 5, 1900: Extended to Shibetsu
  • September 3, 1900: Extended to Nayoro
  • April 1, 1905: Transferred to Imperial Japanese Government Railways
  • November 3, 1911: Extended to Onnenai
  • September 21, 1912: Renamed Sōya Line(宗谷線, Sōya-sen)
  • November 5, 1912: Extended to Otoineppu
  • October 20, 1919: Renamed Sōya Main Line(宗谷本線, Sōya Honsen)
  • October 5, 1921: Renamed Sōya Line
  • November 1, 1922: Completed to Wakkanai (present Minami-Wakkanai) via later Tempoku Line
  • November 4, 1922: Renamed back to Sōya Main Line
  • November 8, 1922: Teshio Line (II) between Otoineppu and Pompira (present Teshio-Nakagawa)
  • May 1, 1923: Chihaku Ferry(稚泊連絡船, Chihaku Renrakusen) commenced Wakkanai - Ōdomari
  • November 10, 1923: Extended to Toikambetsu
  • June 25, 1924: Teshio North Line(天塩北線, Teshio-hokusen) opened Wakkanai - Kabutonuma. Teshio Line renamed Teshio South Line(天塩南線, Teshio-nansen)
  • July 20, 1925: Teshio South Line extended to Horonobe
  • September 25, 1926: Teshio South and North lines connected, renamed to Teshio Line(天塩線, Teshio-sen) (II), Otoineppu - Wakkanai
  • December 26, 1928: Extended to Wakkanaikō (present Wakkanai).
  • April 1, 1930: Entire stretch of the Teshio Line became a part of Sōya Main Line. The section Otoineppu - Hamatombetsu - Wakkanai separated as Kitami Line(北見線, Kitami-sen), later Tempoku Line(天北線, Tempoku-sen).
  • June 30, 1935: Teshio Line (III), later Haboro Line from Horonobe opened.
  • August 25, 1945: Chihaku Ferry ceased operation when all of Sakhalin becomes part of the Soviet Union.
  • July 15, 1965: The 1256m Shimodaira Tunnel and realignment opened to avoid an avalanche trouble-spot.
  • November 10, 1984: Automated block system introduced, ticketing of most (29) stations unstaffed
  • November 1, 1986: CTC implemented, above noted stations completely unstaffed.
  • April 1, 1987: Japanese National Railways privatized, Hokkaido Railway Company succeeded the entire line as Category 1, Japan Freight Railway Company as Category 2 between Asahikawa and Nayoro. All the temporary stations were reclassified as regular stations
  • 1995: The ferry between Wakkanai and Korsakov "resumed" after 50 years, although not directly connected to the railway.
  • March 2000: Tracks of Asahikawa - Nayoro upgraded for faster operation. The Super Sōya limited express train commenced.

Former connecting lines

Short freight train hauled by class 9600 on the Nayoro Main line, March 1973
Bridge from the former Monbetsu to Motoyama line
Bridge built on the former Shinmei Line
  • Shibetsu station - A 762mm (2'6") gauge line was constructed between 1920 and 1925 along the Teshio River valley to transport forestry products, extending 21.4 km to 'Upper' Shibetsu, where it connected to the Shibetsu Forest Railway. Initially horse drawn, a steam locomotive was introduced in 1928. The line closed in 1959.
  • Nayoro station - A 138 km line known as the Nayoro Main Line was built from Nayoro to Engaru on the Sekihoku Main Line between 1915 and 1921, operating until 1989. There were four lines connecting to the Nayoro Main line: The 20 km Kohin'nan line from Okoppe to Om, operated from 1935 to 1985. Some construction work on a proposed extension to Kitami Esashi (see below) was undertaken before the proposal was abandoned. The 34 km line from Shokotsu to Kitami Takinoue, opened 1923 and closed 1985. The 28 km 762mm gauge line from Monbetsu to Motoyama, which operated from 1943 to 1973 The 6 km 762mm gauge line from Yubetsu to Saromako, which operated from 1930 to 1939
  • Nayoro was also the junction for the Shinmei Line to Fukagawa on the Hakodate Main Line, which reached the Soya line in 1941, closing in 1995. A 51.2 km line was proposed from Shumarinai[ja] on that line to Chikubetsu[ja] on the Haboro Line (see below) with construction commencing in 1959. A substantial steel truss bridge was constructed before work was abandoned in 1962.
  • Bifuka station - A 21 km 762mm gauge line was built to Niupu in 1935. In 1960 it was decided to replace the line with a 1067mm gauge line and extend it 58 km to Kitami Esashi, the terminus of a line from Hamatonbetsu on the Tempoku line (see below). The 762mm gauge line closed in 1963 and the 1067mm line opened in 1964. Substantial construction of the line to Kitami Esashi continued until abandoned in 1979, after 13.3 Billion Yen had been expended. The Bifuka - Niupu section closed in 1985.
  • Otoineppu station - The Tempoku line was constructed north commencing in 1914, reaching Minami-Wakkanai in 1922. It closed in 1989. This line had the Hamatonbetsu - Kitami Esashi branch line operating from 1936 until 1985. The Utanobori Municipal Tramway was a network of 762mm gauge lines, with a 16.2 km line from Shotonbetsu to Kitami Esashi and 2 branch lines, each 10 km long. It operated 1929–70, being horse drawn until 1933.
  • Toyotomi station - The Nisso Coal Co. operated an 18 km line to Sanko from 1940/45 until the mine closed in 1972.
  • Toikanbetsu station - The Horonobe Municipal Tramway was a 16 km 762mm gauge line to Kamitoikan, which operated 1930–71. It was extended 4 km to a coal mine in 1941, at which time a steam locomotive was introduced. The coal mine and extension closed in 1958.
  • Horonobe station - The initial northern section of the Haboro Line opened in 1935. The initial southern section from Rumoi opened in 1927, and the sections were linked in 1958. The line closed in 1987.

See also