Sadura railway station
In-game article clicks load inline without leaving the challenge.
| Udhampur–Srinagar– Baramula Rail Link (USBRL) | ||||||
|---|---|---|---|---|---|---|
| km Uri Gingal Limber Sheeri 324.79 Baramulla Kupwara Line (in progress) Kupwara Jaggerpora Handwara Dangiwacha Ferozepora 317.44 Sopore 310.24 Hamre 302.15 Pattan 293.81 Mazhom 287.35 Nadigam Halt 280 Budgam 268.06 Srinagar 261.94 Pampore Jhelum Bridge 256.34 Kakapora 252.56 Ratnipora Halt 245.74 Awantipora 239.24 Panzgom Shopian Line (in progress) 232.02 Bijbehara to Pahalgam (in progress) 225.94 Anantnag 218.24 Sadura 207.64 Qazigund Banihal-QazigundRailway Tunnel (11.215 km) 190 Banihal Tunnels T53-T55 Tunnel T52 (8.61 km) 175.35 Khari Tunnel T51 Tunnel T50 (12.775 km) 161.28 Sumber Tunnel T49 (10.178 km) Tunnels T45-T48 141.91 Sangaldan Tunnel T44 (11.13 km) Tunnel T43 (6.292 km) 123.51 Sawalkote Tunnel T42 (9.316 km) 113.99 Dugga Tunnels T38-T41 Tunnel T37 (3.493 km) Chenab Rail Bridge 102.58 Bakkal Tunnel T36 (5.941 km) 96.24 Reasi Tunnel T35 (3.007 km) Anji Khad Bridge Tunnel T34 (5.098 km) Tunnel T33 (3.209 km) Tunnels T31-T32 78.03 Shri Mata VaishnoDevi Katra Tunnel T30 Jhajjar Khad Bridge Tunnels T25-T29 62.45 Chak Rakhwal Tunnel T24 Tunnel T23 (3.12 km) Tunnels T21-T22 Bhadarwah Line(planned) 53.15 Udhampur 43.65 Ram Nagar Tunnels T14-T20 Tawi Bridge 31.8 Manwal billawar Line(planned) Tunnels T10-T13 21.87 Sangar Tunnels T4-T9 11.04 Bajalta Tunnels T1-T3 Poonch line(planned) 0 Jammu Tawi Jalandhar–Jammu line km | ||||||
| km | ||||||
| Uri | ||||||
| Gingal | ||||||
| Limber | ||||||
| Sheeri | ||||||
| 324.79 | Baramulla | |||||
| Kupwara Line (in progress) | ||||||
| Kupwara Line (in progress) | ||||||
| Kupwara | ||||||
| Jaggerpora | ||||||
| Handwara | ||||||
| Dangiwacha | ||||||
| Ferozepora | ||||||
| 317.44 | Sopore | |||||
| 310.24 | Hamre | |||||
| 302.15 | Pattan | |||||
| 293.81 | Mazhom | |||||
| 287.35 | Nadigam Halt | |||||
| 280 | Budgam | |||||
| 268.06 | Srinagar | |||||
| 261.94 | Pampore | |||||
| Jhelum Bridge | ||||||
| 256.34 | Kakapora | |||||
| 252.56 | Ratnipora Halt | |||||
| 245.74 | Awantipora | |||||
| 239.24 | Panzgom | |||||
| Shopian Line (in progress) | ||||||
| Shopian Line (in progress) | ||||||
| 232.02 | Bijbehara | |||||
| to Pahalgam (in progress) | ||||||
| 225.94 | Anantnag | |||||
| 218.24 | Sadura | |||||
| 207.64 | Qazigund | |||||
| Banihal-QazigundRailway Tunnel (11.215 km) | ||||||
| Banihal-Qazigund | ||||||
| Railway Tunnel | ||||||
| 190 | Banihal | |||||
| Tunnels T53-T55 | ||||||
| Tunnel T52 (8.61 km) | ||||||
| 175.35 | Khari | |||||
| Tunnel T51 | ||||||
| Tunnel T50 (12.775 km) | ||||||
| 161.28 | Sumber | |||||
| Tunnel T49 (10.178 km) | ||||||
| Tunnels T45-T48 | ||||||
| 141.91 | Sangaldan | |||||
| Tunnel T44 (11.13 km) | ||||||
| Tunnel T43 (6.292 km) | ||||||
| 123.51 | Sawalkote | |||||
| Tunnel T42 (9.316 km) | ||||||
| 113.99 | Dugga | |||||
| Tunnels T38-T41 | ||||||
| Tunnel T37 (3.493 km) | ||||||
| Chenab Rail Bridge | ||||||
| 102.58 | Bakkal | |||||
| Tunnel T36 (5.941 km) | ||||||
| 96.24 | Reasi | |||||
| Tunnel T35 (3.007 km) | ||||||
| Anji Khad Bridge | ||||||
| Tunnel T34 (5.098 km) | ||||||
| Tunnel T33 (3.209 km) | ||||||
| Tunnels T31-T32 | ||||||
| 78.03 | Shri Mata VaishnoDevi Katra | |||||
| Shri Mata Vaishno | ||||||
| Devi Katra | ||||||
| Tunnel T30 | ||||||
| Jhajjar Khad Bridge | ||||||
| Tunnels T25-T29 | ||||||
| 62.45 | Chak Rakhwal | |||||
| Tunnel T24 | ||||||
| Tunnel T23 (3.12 km) | ||||||
| Tunnels T21-T22 | ||||||
| Bhadarwah Line(planned) | ||||||
| Bhadarwah Line | ||||||
| (planned) | ||||||
| 53.15 | Udhampur | |||||
| 43.65 | Ram Nagar | |||||
| Tunnels T14-T20 | ||||||
| Tawi Bridge | ||||||
| 31.8 | Manwal | |||||
| billawar Line(planned) | ||||||
| billawar Line | ||||||
| (planned) | ||||||
| Tunnels T10-T13 | ||||||
| 21.87 | Sangar | |||||
| Tunnels T4-T9 | ||||||
| 11.04 | Bajalta | |||||
| Tunnels T1-T3 | ||||||
| Poonch line(planned) | ||||||
| Poonch line | ||||||
| (planned) | ||||||
| 0 | Jammu Tawi | |||||
| Jalandhar–Jammu line | ||||||
| km | ||||||
| This diagram:viewtalkedit |
Sadura Railway Station is a railway station on the Northern railway network of India. It is the headquarters of Anantnag division of Northern Railway zone.
History
The station was built as part of the Jammu–Baramulla line mega project, intending to link the Kashmir Valley with Jammu Tawi and the rest of the Indian rail network.
Location
The station, in Sadura, is 8 km (5.0 mi) from the Anantnag.
Design
The station features Kashmiri wood architecture, with an intended ambiance of a royal court which is designed to complement the local surroundings to the station. Station signage is predominantly in Urdu and English.[citation needed] The IRCTC intends to build a hotel near the site.[citation needed]
See also
- . India Rail Info.