Line 15 of the Shanghai Metro is a north-south metro line in the city of Shanghai that opened on 23 January 2021. The line begins at Gucun Park in Baoshan District at its northern end, and terminates at Zizhu Hi-tech Park in Minhang District at its southern end, via Shanghai West Railway Station and Shanghai South Railway Station. It will be 42.3 kilometres (26.3 mi) in length and have 30 stations. The line is one of Shanghai Metro's new batch of high capacity fully automated and driverless lines along with Lines 14 and 18. The line is colored ivory on system maps.

History

The line was originally scheduled to open by the end of 2020. However, on 24 December 2020, Shanghai Metro officials announced that the opening would take place in 2021, prior to the start of the Chinese New Year. Line 15 opened on January 23, 2021. Guilin Road station opened on June 27, 2021.

On January 19, 2021, there was a partial collapse in an under-construction Exit 9 of Zizhu Hi-tech Park station. There were no casualties at the scene, no impact on the surrounding environment, and no impact on the opening of Line 15.

Shanghai Metro Line 15 opening history
SegmentCommencedOpenedLengthStation(s)NameInvestment
Gucun Park - Zizhu Hi-tech Park1 Jul 201423 Jan 202141.22 km (25.61 mi)29Phase 1¥47.683 billion
Guilin Road27 Jun 2021Infill station1

On May 20, 2021, according to the official announcement, due to the accumulation of water between Loushanguan Road and East China University of Science and Technology, Line 15 will operate at a speed limit, which is expected to be delayed for more than 25 minutes.

Controversy

On 28 December 2011, the northern terminus of the line was shifted from Qihua Road station to an independent station called Jinqiu Road, located near Line 7 between Qihua and Shanghai University but with no direct interchange to Line 7. This has stirred controversy among residents over Line 15's already lack of convenient connections with other major subway lines such as Line 2 and Line 10. Planners reconsidered and extended Line 15 north of Jinqiu Road to connect with Line 7 at Gucun Park. In December 2019, the line was further revised to provide an interchange with Line 2 at Loushanguan Road station. However, there is still no interchange planned with Line 10, as the Line 15 Hongbaoshi Road station is located mid-way between Yili Road and Shuicheng Road stations on Line 10.

Stations

Service routes

Shanghai Metro Line 15 service routes
M - Mainline: Gucun ParkZizhu Hi-tech Park C - Core: Gulang RoadShuangbai Road P - Peak: Gucun ParkShuangbai Road (only operating during working day peak)
RoutesStation nameConnectionsDistanceLocationOpen- ingPlat- form
MCPEnglishChinesekmmin
Gucun Park顾村公园70.00.00Baoshan23 Jan 2021Underground island
Jinqiu Road锦秋路3.093.094
Fengxiang Road丰翔路1.214.307
Nanda Road南大路1.005.309
Qi'an Road祁安路1.406.7011Putuo
Gulang Road古浪路1.498.1913Underground side & island
East Wuwei Road武威东路0.708.8915Underground island
Shanghai West Railway Station上海西站11 Shanghai West railway station SXH1.6310.5218
Tongchuan Road铜川路141.4011.9221
North Meiling Road梅岭北路0.6712.5923
Daduhe Road大渡河路131.4214.0225
Changfeng Park长风公园0.8814.9027Underground side & island
Loushanguan Road娄山关路21.4216.3229ChangningUnderground island
Hongbaoshi Road红宝石路10 (via Yili Road)1.3717.6932
Yaohong Road姚虹路1.7119.5035
Wuzhong Road吴中路0.8620.3637Minhang
Guilin Road桂林路91.4121.7739Xuhui27 June 2021
Guilin Park桂林公园120.8622.644123 Jan 2021
Shanghai South Railway Station上海南站1 3 Jinshan Shanghai South railway station SNH1.8624.5044
East China University of Science and Technology华东理工大学1.1625.6647
Luoxiu Road罗秀路1.3627.0250
Zhumei Road朱梅路1.0428.0652
Jinghong Road景洪路Shanghai Suburban Railway Airport Link0.7628.8254
South Hongmei Road虹梅南路1.5830.4057Minhang
Jingxi Road景西路1.1731.5759
Shujian Road曙建路1.3732.9462
Shuangbai Road双柏路0.9533.8964
Yuanjiang Road元江路2.8036.6967
Yongde Road永德路2.6639.3571
Zizhu Hi-tech Park紫竹高新区1.8741.2274
South Lanxiang Lake Road兰香湖南路MinhangSouth extension under construction exp 2028
Xizha Highway西闸公路FengxianReserved station
North Huifeng Road汇丰北路South extension under construction exp 2028
Oriental Beauty Valley Avenue东方美谷大道
Wangyuan Road望园路5

Important stations

Future expansion

A south extension to Wangyuan Road to connect up with Line 5 is under construction and is expected to open in 2028.

Station name change

Headways

Shanghai Metro Line 15 headway
TimeGucun Park - Gulang RoadGulang Road - Shuangbai RoadShuangbai Road - Zizhu Hi-tech Park
Monday - Friday (working days)
AM peak7:20–9:20About 4 min and 53 secAbout 3 min and 45 secAbout 6 min and 40 sec
Off-peak9:20–16:30About 12 minAbout 6 minAbout 12 min
PM peak16:30–20:00About 6 minAbout 4 min and 45 secAbout 9 min
Other hoursBefore 7:20 After 20:00About 5 – 12 min
Before 7:20
After 20:00
Saturday and Sunday (weekends)
Peak7:00–20:20About 12 minAbout 6 minAbout 12 min
Other hoursBefore 7:00 After 20:206 – 12 min
Before 7:00
After 20:20

Technology

Line 15 train interior

Signalling

Line 15 is notable for being driverless and the longest line in China operating GoA4 (Grade-of-Automation 4), whereby trains may operate automatically at all times, including the actions of opening/closing doors, detecting obstacles and reacting to emergencies. There are no staff on board concerned with ongoing train operations.

Between December 2020 and January 2021, SATEE supplied its OptONIX and ONIX metro traction systems for 324 metro cars of Shanghai Line 15, with support from Xi'an Alstom Yongji Electric Equipment Co. Ltd (XAYEECO). It was also responsible for the train control monitoring system (TCMS) of Shanghai Line 15, and the line's train electrical design. During the same period, CASCO has successfully put into service its Urbalis 888 signalling solution on six of these metro lines in Chengdu and Shanghai.

Rolling stock

Shanghai Metro Line 15 rolling stock
Fleet numbersManufacturerTime of manufac- turingClassNo of carAssemblyRolling stockNumberNotes
324SATCO and CRRC Changchun Railway Vehicles2019-2020A6Tc+MP+M+M+MP+Tc15A0115001-15054 (150011-153241)Front of the train adopts an open driver's cab.

Future rolling stock

Shanghai Metro Line 15 future rolling stock
Fleet numbersManufacturerTime of manufac- turingClassNo of carAssemblyRolling stockNumberNotes
180TBA2027-2028A6Tc+MP+M+M+MP+Tc15A0215055-15084 (153251-155041)