vteSunshine Coast Line
mi-ch from Liverpool Street Great Eastern Main Line← to London │ to Norwich → 51-52 Colchester East Gate Junction 53-78 Colchester Town 53-49 Hythe Colne Causeway 56-00 Wivenhoe Alresford Creek Brightlingsea 57-63 Alresford Thorington Great Bentley Brook 60-66 Great Bentley A133 road 62-78 Weeley 65-07 Thorpe-le-Soken 67-55 Kirby Cross 68-66 Frinton-on-Sea 69-56 Clacton-on-Sea 70-15 Walton-on-the-Naze
mi-chfrom Liverpool Street
Great Eastern Main Line← to London │ to Norwich
Great Eastern Main Line
← to London │ to Norwich
51-52Colchester
East Gate Junction
53-78Colchester Town
53-49Hythe
Colne Causeway
56-00Wivenhoe
Alresford Creek
Brightlingsea
57-63Alresford
Thorington
Great Bentley Brook
60-66Great Bentley
A133 road
62-78Weeley
65-07Thorpe-le-Soken
67-55Kirby Cross
68-66Frinton-on-Sea
69-56Clacton-on-Sea
70-15Walton-on-the-Naze
station closed on Sundays
station closed on Sundays

The Sunshine Coast Line is the current marketing name of what originally was the Tendring Hundred Railway, a branch off the Great Eastern Main Line in the East of England. It links Colchester to the seaside resorts of Clacton-on-Sea and, via a branch, Walton-on-the-Naze. The line is part of the Network Rail Strategic Route 7, SRS 07.08, and is classified as a London & South East commuter line. Passenger services on the line are currently operated by Greater Anglia.

Trains for Clacton-on-Sea usually originate at London Liverpool Street, while those for Walton-on-the-Naze typically start at Colchester (or Thorpe-le-Soken on Sundays). There are, however, limited morning and evening peak-time services in each direction between Walton-on-the-Naze and Liverpool Street.

History

Steam era

The Great Eastern Main Line out of Shoreditch in London reached Colchester by 1843 and was extended to Ipswich in 1846.

The first short section of this branch line was built by the Colchester, Stour Valley, Sudbury and Halstead Railway to the port of Hythe, and opened for freight traffic on 31 March 1847. In 1859 the Tendring Hundred Railway Company was formed by the Tendring Hundred Railway Act 1859 (22 & 23 Vict. c. cxix) to extend the line from Hythe to Wivenhoe, which opened on 8 May 1863 for both passenger and goods services from Colchester. By the time the Wivenhoe extension opened the line had been taken over by the Great Eastern Railway (GER) who provided the rolling-stock in return for 50% of takings.

The route was extended to Weeley on 8 January 1866, to Kirby Cross on 28 July 1866, and on to the terminus at Walton-on-Naze on 17 May 1867. In the meantime, a short branch to a new station called St. Botolph's, located more centrally in Colchester, opened on 1 March 1866. This station was renamed Colchester Town on 8 July 1991 by British Rail.

A second company, the Wivenhoe and Brightlingsea Railway, had been incorporated in 1861 to build a line from Wivenhoe to Brightlingsea, which opened on 17 April 1866. There were also proposals to build a line to Clacton as early as 1866, but nothing came of them until 1877, when the Clacton-on-Sea Railway was incorporated by the Clacton-on-Sea Railway Act 1877 (40 & 41 Vict. c. clxvi). The connection from Thorpe-le-Soken to Clacton opened on 4 July 1882, also operated by the GER.

The GER negotiated to buy both the Tendring Hundred Railway and the Clacton-on-Sea Railway, and they became part of the GER on 1 July 1883 by the Great Eastern, Tendring Hundred and Clacton-on-Sea Railways Act 1883 (46 & 47 Vict. c. lvi). The Wivenhoe and Brightlingsea Railway Company was absorbed by the GER on 9 June 1893.

In 1923 the line (along with the rest of the GER) became part of the London and North Eastern Railway.

A section of the line between Frinton and Walton-on-Naze had to be re-sited in 1929 due to fears of coastal erosion on the original alignment.

Following nationalisation on 1 January 1948, the line became part of the Eastern Region of British Railways.

Electrification

Manually-operated level crossing at Great Bentley, which was replaced with barriers in 2008

Electrification of the line commenced in the 1950s and by January 1959 the line was electrified as far as Great Bentley. The first trial train to run on the newly electrified section departed Colchester on 18 January 1959. The line was the first in the country to be electrified at 25 kV AC, using overhead wires, with electrified services inaugurated on 13 April 1959. Between 1962 and 1992, services on the line were largely operated by a fleet of Class 309 electric multiple units which were specially designed and constructed for the route. The 309s were replaced on the route by newer rolling stock between 1992 and 1994 during the Network SouthEast era.

Passenger services have been operated by two different franchises since privatisation of British Rail in 1997: First Great Eastern until 31 March 2004, when National Express took over with the company branded as One until February 2008, at which time it was rebranded as National Express East Anglia. It is currently operated by Abellio Greater Anglia.

Recent developments

A £104 million engineering project known as the Colchester to Clacton Resignalling Project took place on the line between December 2006 and July 2009. Life-expired signalling equipment was renewed and a new control system was fitted; 170 modern LED signals were erected and eight manual level crossings were replaced by full barrier crossings with security cameras. The line was closed every weekend and on public holidays, with bus replacement services provided.

There was opposition from the town of Frinton to keep the manual gates. Folklore has it that townspeople used to lock the gates to keep out coach-loads of tourists.

Infrastructure

The line is double track except for the branch between Thorpe-le-Soken and Walton-on-the-Naze which is single track. It is electrified at 25 kV AC, has a loading gauge of W6 and a line speed limit of between 30 and 75 mph (48–121 km/h). The branch to Colchester Town has a maximum speed limit of 30 mph (48 km/h). The Engineer's Line Reference for the line from Colchester Junction to Clacton is COC, and from Thorpe-le-Soken Junction to Walton-on-the-Naze is TWN.

Passenger train services are operated by Class 720 electric multiple units. The Walton-on-the-Naze to Colchester local services are typically formed of five carriages. The Clacton-on-Sea to London Liverpool Street services are typically formed of ten carriages.

Stations

The following table summarises the line's 12 stations, their distance measured from London Liverpool Street, and estimated number of passenger entries/exits in 2018–19:

StationLocationLocal authorityMileagePatronage
ColchesterNorth ColchesterCity of Colchester51+3⁄44,453,178
Branch to Colchester Town:
Colchester TownCentral ColchesterCity of Colchester54771,090
Main section to Thorpe-le-Soken:
HytheHytheCity of Colchester53+1⁄2265,716
WivenhoeWivenhoeCity of Colchester56401,240
AlresfordAlresfordDistrict of Tendring57+3⁄462,994
Great BentleyGreat BentleyDistrict of Tendring60+3⁄481,144
WeeleyWeeleyDistrict of Tendring6334,908
Thorpe-le-SokenThorpe-le-SokenDistrict of Tendring65131,088
Branch to Clacton-on-Sea:
Clacton-on-SeaClacton-on-SeaDistrict of Tendring69+3⁄4799,344
Branch to Walton-on-the-Naze:
Kirby CrossKirby CrossDistrict of Tendring67+3⁄444,782
Frinton-on-SeaFrinton-on-SeaDistrict of Tendring68+3⁄4200,904
Walton-on-the-NazeWalton-on-the-NazeDistrict of Tendring70+1⁄4136,708

Services

The typical Monday to Saturday off-peak service on the line is:

  • 1 train per hour (tph) between Clacton-on-Sea and London Liverpool Street, calling at Thorpe-le-Soken, Wivenhoe, Hythe, Colchester, Witham, Chelmsford, Ingatestone, Shenfield, Stratford and London Liverpool Street
  • 1 tph between Walton-on-the-Naze and Colchester, calling at Frinton-on-Sea, Kirby Cross, Thorpe-le-Soken, Weeley, Great Bentley, Alresford, Wivenhoe, Hythe, Colchester Town and Colchester. This service waits for the Clacton-on-Sea service to pass at Thorpe-le-Soken.
  • 1 tph between Colchester and Colchester Town