Telangana Power Generation Corporation Limited
In-game article clicks load inline without leaving the challenge.
The Telangana Power Generation Corporation Limited (TGPGCL) is responsible for power generation in the state of Telangana. It has ceased to do power trading and has retained with powers of controlling system operations of power generation after formation of Telangana state.
Telangana Power Generation Corporation Limited has been incorporated under companies Act, 2013, on 19 May 2014 and commenced its operations from 2 June 2014.
History
The erstwhile Andhra Pradesh State Electricity Board (APSEB) which came into existence on 1st April 1959 was responsible for generation, transmission and distribution of electricity. APSEB was the successor to Electricity Department of the Government of Andhra Pradesh. Prior to the independence, power was supplied to parts of Telangana by Hyderabad State Electricity Department. Under the Electricity Sector Reforms agenda, government of Andhra Pradesh promulgated Andhra Pradesh Electricity Reforms Act, 1998. The erstwhile APSEB was unbundled into one generating company (APGENCO), one transmission company (APTRANSCO) and four distribution companies (APDISCOMs) as part of the reform process.
Later, on 2 June 2014, when the state was bifurcated, APGENCO distributed all the assets, liabilities and power stations to both the states and Telangana Power Generation Corporation (TGGENCO) was formed for the newly formed Telangana state and APGENCO remained for Andhra Pradesh in accordance with the Andhra Pradesh Reorganisation Act, 2014. All the plants (thermal, hydel and solar) located in Telangana region were transferred to Telangana Genco on an "as is where is" basis.
Mission
- To spearhead accelerated power development by planning and implementing new power projects.
- To generate adequate and reliable power most economically, efficiently and eco-friendly.
- To implement renovation and modernisation of all existing units and enhance their performance.
Power Plants of TGGENCO
The power plants of TGGENCO are
Thermal-Coal based
| Sr. No. | Project | Inst.Capacity (MW) | Total (MW) | Remarks | Gallery |
|---|---|---|---|---|---|
| 1 | Kakatiya TPP | 1x500+1x600 | 1100 | ||
| 2 | Kothagudem TPS | 2x250+1x500+1x800 | 1800 | ||
| 4 | Bhadradri Thermal Power Plant | 4x270 | 1020 MW | ||
| 5 | Yadadri Thermal Power Plant | 5X800 | 4000 MW under construction | ||
| Overall installed capacity (MW) | 3920 |
Hydro-Water based
| Sr. No. | Project | Inst.Capacity (MW) | Total (MW) | Remarks | Gallery |
|---|---|---|---|---|---|
| 1 | Nagarjuna Sagar Main PH | 1x110+7x100.8 | 815.6 | 7x100.8 MW with pumping features | |
| 2 | Nagarjuna Sagar LCPH | 2x30 | 60 | ||
| 3 | Srisailam LBPH | 6x150 | 900 | 6x150 MW with pumping features | |
| 4 | Pochampad PH | 4x9 | 36 | ||
| 5 | Singur PH | 2x7.5 | 15 | ||
| 6 | Nizam Sagar PH | 2x5 | 10 | ||
| 7 | Puttamagandi AMRP Lift | 4x18 | Water pumping station | ||
| 8 | Paleru Mini Hydel | 2x1 | 2 | ||
| 9 | Peddapalli Mini Hydels | 1x9.16 | 9.16 | ||
| 10 | Lower Jurala HEP | 6x40 | 240 | ||
| 11 | Jurala HEP | 6x39 | 234 | 50% joint project with Karnataka state | |
| 12 | Sammakka Sagar HEP | 10x24 | 240 | Under Construction | |
| 13 | Pulichintala Hydro Project PCHES | 4x30 | 120 | ||
| Overall capacity (MW) | 2441.76 |
Non-Conventional Plants
| Sr. No. | Project | Inst.Capacity (MW) |
|---|---|---|
| 1 | Jurala Solar PV Plant | 1 |
| Overall capacity (MW) | 1 |