The Taitung Line (Chinese: 臺東線; pinyin: Táidōng Xiàn; Pe̍h-ōe-jī: Tâi-tang Soàⁿ), also known as the Hua-Tung line (Chinese: 花東線; pinyin: Huādōng Xiàn; Pe̍h-ōe-jī: Hoa-tang Soàⁿ), is the southern section of the Eastern Line of Taiwan Railway. The line starts at the Hualien station and ends at the Taitung station. It is 161.5 km long, including the main segment of 155.7 km between Hualien and Taitung.

The coastal branch lines of Hualien and Taitung were discarded after the broadening plan in 1982. The broadcasts of the station names on Taitung line are made in five languages: Mandarin, Taiwanese Hokkien, Hakka, English, and Amis. The Taitung Line is the only line in Taiwan where broadcasts are made in the Amis language.

Outline map near Hualien, Stations: A: Hualien (former), B: Hualien Port, C: Hualien, D: Beipu, E: Ji'an, F: Meilun Lines: Yellow: North-Link Line Blue:Hualien–Taitung Line Green: Hualien Port Line Red: Hualien Port Line (former)

History

The north segment from Karenkō (花蓮港, now Hualien City) to Poshiko (璞石閣 ポシコ, then Tamazato, now Yuli) was built in 1909 and completed in 1917. The south segment from Hinan (卑南, then Taitō, now Taitung City) to Rirō (里巄, now Guanshan) was opened in 1919 by the Taitō Development Company (臺東開拓株式會社).

In 1922, the Taitō Development Company bought the railroad from Karenkō to Tamazato and named it the "Taitō North Line", while the south segment from Taitō to Rirō was named the "Taitō South Line."

The construction of the connecting railway between Tamazato to Rirō began in 1921 and completed in 1926, after which the total length of the line from Karenkō (Hualien City) to Taitō (Taitung City) was 171.8 km.

In 1966, the Kuang-Hua Express (光華號) utilizing diesel multiple units started service on the line, and greatly shortening the travel time from Hualien to Taitung from 6–7 hours to 3–4 hours.

Its gauge was changed from 2 ft 6 in (762 mm) narrow gauge to 3 ft 6 in (1,067 mm) gauge in 1982 and connected with North-link line, after which the old Hualien Station was abandoned and replaced by the Hualien railway station that is used now. The site of old Hualian Station was eventually turned into Dongdamen Night Market in 2015, while the disused right of way has been partially turned into a pedestrian area.

In 2007, the Environmental Protection Administration gave the line a conditional pass for an electrification project, which would boost the operating speed from 110 km/h to 130 km/h. In 2009, construction began on electrification work, with NT$15.5 billion set aside for the project. Electrification work was completed in late 2013 with the inauguration of electric services taking place in late June 2014.

The section between Nanping and Wanrong railway stations was to be upgraded from a single-track railway to a dual-track railway and was expected to be completed by December 2020. With the existing double-track sections from Shoufeng to Nanping railway station and from Wanrong to Guangfu railway stations, it was expected that service frequency could be improved, shortening wait times.

On 12 October 2020, the Ministry of Transport has approved and intends to carry out upgrading works on the Taitung Line to ensure that the entire line is double-tracked. As 69% of the line is still currently single-tracked, the project is expected to shorten wait times by up to 90 minutes with up to 16 more train services each day. Some trips can be reduced by up to 50 minutes. With an increase of 17,000 passengers per day, the dual-track railway project is expected to cost NT$25.429 billion, which will be completed 7 years after the environmental impact assessment and comprehensive planning are approved.[citation needed]

The Railway Bureau has stated that the project will be carried out in 2 phases. Phase 1 will include the sections north of Yuli (Hualien - Shoufeng, Guangfu - Ruisui and Sanmin - Yuli) and the section between Taitung and Zhiben and is expected to be completed by 2026. Phase 2 will include the remaining sections of the line and is expected to be completed by 2027.

Electrification of the Hualien-Taitung Line

Together with the electrification of the Hualien-Taitung Line, the following stations were upgraded.

  • General Reconstruction Completed - Zhixue, Pinghe, Fengtian, Nanping, Fenglin, Wanrong, Guangfu, Dafu, Fuyuan, Ruisui, Sanmin, Yuli, Dongli, Dongzhu, Fuli, Chishang, Haiduan, Guanshan, Ruihe, Ruiyuan, Luye, Shanli, Taitung
  • Elevated Station Under Construction - Hualien Under Planning - Ji’an Completed - Shoufeng
  • Underground Station Completed - Linrong Shin Kong

Stations

NameChineseTaiwaneseHakkaAmisDist. (km)Transfers and NotesLocation
Hualien花蓮Hoa-liânFâ-liènKalingko0.0Taiwan Railway North-link lineHualienHualien County
Ji'an吉安Kiat-anKit-ônYoshino3.4Ji'an
Zhixue志學Chì-ha̍kChṳ-ho̍kCihak12.4Shoufeng
Pinghe平和Pêng-hôPhìn-fòCi’adetuman15.3
Shoufeng壽豐Siū-hongSu-fûngRinahem17.2
Fengtian豐田Hong-tiânFûng-thiènTelu’19.9
Linrong Shin Kong林榮新光Lîm-êng Sin-kongLìm-yùng Sîn-kông26.1Fenglin
Nanping南平Lâm-pêngNàm-phìnKiku28.3
Fenglin鳳林Hōng-lîmFung-lìmCingaroan32.5
Wanrong萬榮Bān-êngVan-yùngMolisaka37.3
Guangfu光復Kong-ho̍kKông-fu̍kFata’an42.9Guangfu
Dafu大富Tāi-hôThai-fuYamato50.6
Fuyuan富源Hù-goânFu-ngiènPa’ilasen53.6Ruisui
Ruisui瑞穗Sūi-sūiLui-suiKohkoh62.8
Sanmin三民Sam-bînSâm-mìnTakay72.1Yuli
Yuli玉里Gio̍k-líNgiu̍k-lîPosko83.1
Dongli東里Tang-líTûng-lîPasai89.8Fuli
Dongzhu東竹Tang-tekTûng-chukTalampo95.7
Fuli富里Hù-líFu-lîKumpuu101.9
Chishang池上Tî-siōngChhṳ̀-sôngFanaw108.8ChishangTaitung County
Haiduan海端Hái-toanGói-tônHaitutuan114.4Guanshan
Guanshan關山Koan-sanKoân-sânTakofan120.9
Ruihe瑞和Suī-hôLui-fòPakala’ac128.3Luye
Ruiyuan瑞源Suī-goânLui-ngiènEfong131.1
Luye鹿野Lo̍k-iáLu̍k-yâParayabay136.6
Shanli山里San-líSân-lîKalito’od142.8Beinan
Taitung臺東Tâi-tangThòi-tûngPosong150.9Taiwan Railway South-link lineTaitung