Zengcheng Square station
In-game article clicks load inline without leaving the challenge.
Zengcheng Square station (Chinese: 增城广场站) is a station of Line 21 of the Guangzhou Metro, and the eastern terminus of Line 21. It is also the easternmost station of the Guangzhou Metro system. It started operations on 28 December 2018.
Station layout
| L1 Concourse | Lobby | Customer service, shops, vending machines, ATMs |
| L2 Platforms | Platform 2 | 21 towards Tianhe Park (Zhonggang / express: Fenggang) |
| Island platform, doors will open on the left | ||
| Platform 1 | 21 termination platform | |
| L3 Platforms | Platform | 16 reserved track area |
| Reserved island platform | ||
| Platform | 16 reserved track area |
Exits
There are 6 exits, lettered A, B, C, D, E and F. Exit E is accessible. Exits A and B are located on Lixin Highway, exits C and F are located on Zengcheng Avenue and exit E is located on Lijin Avenue.
Gallery
- Concourse
- Exit C
- Exit F
23°05′42″N 113°27′18″E/23.094934°N 113.455011°E/ 23.094934; 113.455011