The Jabodebek LRT Bekasi Line (Indonesian:LRT Jabodebek Lin Bekasi) is one of the two light rapid lines of the Jabodebek LRT which serves trips from Dukuh Atas BNI station to Jati Mulya station. The distance traveled in this fully-elevated line is 29.54 km.

The Pancoran–Jatimulya section of the line runs along the Jakarta Inner Ring Road, Jakarta–Cikampek Toll Road, and the Jakarta–Cikampek Elevated Toll Road.

History

The elevated route is built parallel with the Jagorawi Toll Road.

Like other public transportation systems in Jabodetabek area, the Jabodebek LRT system was built to break down congestion. The construction of the Cawang–Bekasi LRT Line and other lines in the first phase of the Jabodebek LRT construction began with the groundbreaking on 9 September 2015 by President Joko Widodo.

Initially the phase 1 was targeted to be completed before the 2018 Asian Games. However, until the Asian Games were held, the overall progress was still 45%, thus it was unable to be commercially run as targeted.

On October 11, 2019, the first train of Jabodebek LRT arrived in Jakarta. The shipment was carried out by land directly from INKA factory in Madiun, East Java. For the time being, the train has been parked near Harjamukti station of the Cibubur Line; considering that the LRT depot construction in Jatimulya, which is this line's terminus, has not yet been completed.

In October 2020, the Jabodebek LRT trains began their trials.

Network

Route

The Bekasi Line has a track length of 29.54 kilometers. Most of the trajectory of this route is using an elevated structure. From Dukuh Atas to Cawang, this line shares the route with Cibubur Line, goes along Jalan Rasuna Said then turns to the south side of the Jakarta Inner Ring Road (Cawang–Pluit section). In Cawang station, the two lines split and the line follows the Jakarta–Cikampek Toll Road alignment. The network's depot is located at the Jatimulya terminus, thus the tracks continue to Jatimulya depot after the Jatimulya station.

List of stations

LRT Line 3 (Greater Jakarta LRT) StationTransfer/NotesLocation
NumberNameCity/RegencyProvince
Phase 1: Bekasi–Dukuh Atas
BK01 CB01Dukuh Atas BNILRT Line 1 (Greater Jakarta LRT)Terminus station. MRT Line 1 (Jakarta Mass Rapid Transit) Dukuh Atas BNI KAI Commuter Cikarang Loop Line Sudirman KAI Commuter Cikarang Loop Line Soekarno–Hatta Airport Rail Link BNI City LRT Line S (Jakarta LRT) Dukuh Atas (Planned) Transjakarta Corridor 1 Dukuh Atas Transjakarta Corridor 4 Transjakarta Corridor 6 GalunggungSouth JakartaJakarta
BK02 CB02SetiabudiLRT Line 1 (Greater Jakarta LRT)Transjakarta Corridor 6 Setiabudi Integritas
BK03 CB03Rasuna SaidLRT Line 1 (Greater Jakarta LRT)Transjakarta Corridor 6 Rasuna Said
BK04 CB04KuninganLRT Line 1 (Greater Jakarta LRT)Transjakarta Corridor 6 Kuningan (PT) Kuningan (Planned)
BK05 CB05Pancoran Bank BJBLRT Line 1 (Greater Jakarta LRT)Transjakarta Corridor 9 Pancoran
BK06 CB06CikokoLRT Line 1 (Greater Jakarta LRT)KAI Commuter Bogor Line Cawang Transjakarta Corridor 9 Cikoko
BK07 CB07CiliwungLRT Line 1 (Greater Jakarta LRT)Transjakarta Corridor 9 CiliwungEast Jakarta
BK08 CB08CawangLRT Line 1 (Greater Jakarta LRT)Interchange station to LRT Line 1 (Greater Jakarta LRT) Transjakarta Corridor 7 Transjakarta Corridor 9 Cawang
BK09HalimHigh-speed rail in Indonesia Halim LRT Line S (Jakarta LRT) Halim (Planned)
BK10Jati Bening BaruBekasiWest Java
BK11Cikunir 1
BK12Cikunir 2
BK13Bekasi BaratK1 Stasiun LRT Bekasi Barat K1 Lobby Revo Mall (BE) Bekasi Barat (Planned)
BK14Jati MulyaTerminus station.Bekasi Regency
Phase 2: Jati Mulya–Cibatu (under feasibility study)
Tambun SelatanBekasi RegencyWest Java
Lambangsari
Cibuntu
Danau Indah
Cikarang Barat(LT) Cikarang Barat (Planned)
Cibatu

Future development

According to current JUTPI 3 proposal, Bekasi Line will be extended to South Cikarang in Bekasi Regency.