The Jabodebek LRT Cibubur Line (Indonesian: LRT Jabodebek Lin Cibubur) is one of the two light rapid lines of the Jabodebek LRT which connect Dukuh Atas BNI to Harjamukti station, which is about 25.94 km in length. The line adopts elevated construction and stops at twelve stations.

Its Pancoran–Harjamukti section runs along the Jakarta Inner Ring Road and Jagorawi Toll Road. The planned next phase would extend the line to Bogor.

History

The elevated route is built parallel with the Jagorawi Toll Road.

Like other public transportation systems in Jabodetabek area, the Jabodebek LRT system was built to break down congestion. The construction of the Cawang–Cibubur LRT Line and other lines in the first phase of the Jabodebek LRT construction began with the groundbreaking on 9 September 2015 by President Joko Widodo. It was carried out near the planned TMII Station which is a part of this route.

Initially the phase 1 was targeted to be completed before the 2018 Asian Games. However, until the Asian Games were held, the overall progress was still 45%. Even so, at the time the Cawang–Cibubur route had already begun to be installed with rails.

In March 2019, the entire track has been connected. All elevated construction work has been completed and continued with signaling and station construction. Therefore, the line is estimated to be ready for the trial run considering that the other lines have not yet completed their track construction.

On October 11, 2019, the first train of Jabodebek LRT arrived in Jakarta. The shipment was carried out by land directly from INKA factory in Madiun, East Java. For the time being, the train has been parked near Harjamukti Station; considering that the LRT depot construction in Jatimulya, Bekasi has not yet been completed.

In October 2020, the Jabodebek LRT trains began their trials. The trial was carried out on the Cawang–Cibubur route from TMII Station to Harjamukti Station. It was conducted to check signal and track readiness.

Network

Route

The Cibubur Line has a track length of 25.94 kilometers. Most of the trajectory of this route is using an elevated structure. From Dukuh Atas BNI to Cawang, this line shares the route with Bekasi Line, goes along Jalan Rasuna Said then turns to the south side of the Jakarta Inner Ring Road (Cawang–Pluit section). In Cawang Station, the two lines split and the line follows the Jagorawi Toll Road alignment. In a section from Cawang Station to TMII Station, the route follows the east side of the toll road; tracks are made at grade because it is close to the approach zone of Halim Perdanakusuma Airport. After TMII Station, the route moves to the west side until its terminus at Harjamukti Station. The track ends at Harjamukti as a pit stop, although all trains of the system have their depot in Jatimulya, part of the Bekasi Line.

List of stations

LRT Line 1 (Greater Jakarta LRT) StationTransfer/NotesLocation
NumberNameCity/RegencyProvince
Phase 1: Cibubur–Dukuh Atas BNI
CB01 BK01Dukuh Atas BNILRT Line 3 (Greater Jakarta LRT)Terminus station. MRT Line 1 (Jakarta Mass Rapid Transit) Dukuh Atas BNIKAI Commuter Cikarang Loop Line SudirmanKAI Commuter Cikarang Loop Line Soekarno–Hatta Airport Rail Link BNI CityLRT Line S (Jakarta LRT) Dukuh Atas (Planned)Transjakarta Corridor 1 Dukuh AtasTransjakarta Corridor 4 Transjakarta Corridor 6 GalunggungSouth JakartaJakarta
CB02 BK02SetiabudiLRT Line 3 (Greater Jakarta LRT)Transjakarta Corridor 6 Setiabudi
CB03 BK03Rasuna SaidLRT Line 3 (Greater Jakarta LRT)Transjakarta Corridor 6 Rasuna Said
CB04 BK04KuninganLRT Line 3 (Greater Jakarta LRT)Transjakarta Corridor 6 Kuningan (PT) Kuningan (Planned)
CB05 BK05Pancoran Bank BJBLRT Line 3 (Greater Jakarta LRT)Transjakarta Corridor 9 Pancoran
CB06 BK06CikokoLRT Line 3 (Greater Jakarta LRT)KAI Commuter Bogor Line Cawang Transjakarta Corridor 9 Cikoko
CB07 BK07CiliwungLRT Line 3 (Greater Jakarta LRT)Transjakarta Corridor 9 CiliwungEast Jakarta
CB08 BK08CawangLRT Line 3 (Greater Jakarta LRT)Interchange station to LRT Line 3 (Greater Jakarta LRT)Transjakarta Corridor 7 Transjakarta Corridor 9 Cawang
CB09TMIITransjakarta Corridor 9 Makasar Bus Shuttle bus to Taman Mini Indonesia Indah.
CB10Kampung RambutanTransjakarta Corridor 7 Kampung Rambutan Kampung Rambutan Bus Terminal.Kampung Rambutan (planned)
CB11Ciracas
CB12HarjamuktiTerminus station (phase 1). F01 F02 Stasiun LRT HarjamuktiK1 Stasiun LRT Harjamukti(DC) Harjamukti(planned)DepokWest Java
Phase 2: Cibubur–Bogor (under feasibility study)
Bojong NangkaDepokWest Java
Gunung PutriBogor Regency
Sirkuit Internasional Sentul
Sentul
Sukaraja(BG) Sukaraja (Planned)Bogor
Bogor(BG) Baranangsiang (Planned)

Future development

In the phase 2 plan, the Cibubur Line is to be extended to Bogor and Senayan. The Cibubur-Bogor route is planned to be built at grade, instead of elevated like the Cawang–Cibubur route. This aims to save construction costs by up to 50%. Until recently, it is still in the design planning process.

Incidents

  • On October 25, 2021, two LRT trains had an accident while undergoing trials on Cibubur Line, parallel to the Jagorawi Toll Road.