Line 10 of Chongqing Rail Transit is a rapid transit line that opened on 28 December 2017. Rapid trains started operating on Line 10 in June 2020.

The trains on Line 10, which links Jiangbei Airport and Chongqing North railway station, are equipped with a luggage rack on each car.

Interior of a Line 10 train
Interior of a Line 10 train

Opening timeline

SegmentCommencementLengthStation(s)Name
Wangjiazhuang – Liyuchi28 December 201733.7 km (20.94 mi)18Phase 1
Chongqing North Station South Square28 December 2018infill station1
Liyuchi – Houbao18 January 20236 km (3.7 mi)4Phase 2 (initial section)
Houbao – Lanhualu30 November 20234.75 km (2.95 mi)4Phase 2 (remain section)

Stations (north to south)

Map
Route of Line 10
Service routesStation №Station nameConnectionsDistance kmLocation
RLEnglishChinese
/Wangjiazhuang王家庄Line 6-0Liangjiang
|/Yuelai悦来Line 62.042.04
/Central Park West中央公园西Line 52.714.75
|/Central Park中央公园1.095.84
|/Central Park East中央公园东Line 90.826.66
|/Lushan鹿山1.648.30
|/Yubei Square渝北广场2.0510.35
/Terminal 2 of Jiangbei Airport江北机场T2航站楼Line 3 Chongqing Jiangbei International Airport CKG0.7411.09
/Terminal 3 of Jiangbei Airport江北机场T3航站楼15 Chongqing Jiangbei International Airport CKG2.2213.31
|/Changhe长河5.3118.62
|/Huanshan Park环山公园1.8520.47
/Shangwanlu上湾路Line 91.6722.14
|/Sanyawan三亚湾2.7424.88
|/Minxinjiayuan民心佳园2.0826.96
/Chongqing North Station North Square重庆北站北广场Line 4 YW Chongqing North railway station CUW2.6129.57
/Chongqing N. Station S. Square重庆北站南广场Line 3 Loop line YW Chongqing North railway station CUW0.6030.17
|/Longtousi Park龙头寺公园0.8731.04
/Hongtudi红土地Line 61.6332.67
/Liyuchi鲤鱼池Line 91.0933.76
/Zengjiayan曾家岩Line 20.8234.58Yuzhong
|/Chongqing People's Auditorium大礼堂0.9235.5
/Qixinggang七星岗Line 1 180.8936.39
|/Houbao后堡2.1238.51Nan'an
||/Nanping南坪Line 3 271.2239.73
/Wanshoulu万寿路0.9840.71
|/Nanhu南湖Loop line1.2741.98
/Lanhualu兰花路1.2843.26

Notes