Line 10 (Chongqing Rail Transit)
In-game article clicks load inline without leaving the challenge.
Line 10 of Chongqing Rail Transit is a rapid transit line that opened on 28 December 2017. Rapid trains started operating on Line 10 in June 2020.
The trains on Line 10, which links Jiangbei Airport and Chongqing North railway station, are equipped with a luggage rack on each car.

Opening timeline
| Segment | Commencement | Length | Station(s) | Name |
|---|---|---|---|---|
| Wangjiazhuang – Liyuchi | 28 December 2017 | 33.7 km (20.94 mi) | 18 | Phase 1 |
| Chongqing North Station South Square | 28 December 2018 | infill station | 1 | |
| Liyuchi – Houbao | 18 January 2023 | 6 km (3.7 mi) | 4 | Phase 2 (initial section) |
| Houbao – Lanhualu | 30 November 2023 | 4.75 km (2.95 mi) | 4 | Phase 2 (remain section) |
Stations (north to south)
