Line 5 of CRT is a rapid transit line in Chongqing, China, which opened on 28 December 2017.

History

Phase 1

Phase 1 of the line (from The EXPO Garden Center station to Tiaodeng station) began construction on 3 December 2013.

The north section from The EXPO Garden Center to Dalongshan started operation on 28 December 2017, and it extended to Dashiba on 24 December 2018. The south section from Shiqiaopu to Tiaodeng started operation on 20 January 2021. Due to difficults on bridge building, the central section from Dashiba to Shiqiaopu is opened several years later, on 30 November 2023.

Northern extension

The northern extension of this line began construction on 25 January 2019. The extension is 8.95 km (5.56 mi) in length with 7 new stations. The extension opened on 27 February 2023.

Opening timeline

SegmentCommencementLengthStation(s)Name
The EXPO Garden Center – Dalongshan28 December 201716.42 km (10.20 mi)9Phase 1 (North Section)
Dalongshan – Dashiba24 December 20181
Shiqiaopu – Tiaodeng20 January 202118.34 km (11.40 mi)12Phase 1 (South Section)
The EXPO Garden Center – Yuegangbeilu27 February 20238.95 km (5.56 mi)6Northern Extension
Dashiba – Shiqiaopu30 November 20234.95 km (3.08 mi)3Phase 1 (Central Section)
Yuhegou15 July 20251Infill station

Stations

Route map

Map
Route of Line 5
Line 5 train at CRRC Qingdao Sifang
Interior of a Line 5 train

Line 5

Service routesStation №Station nameConnectionsDistance kmLocation
ELocalEnglishChinese
/Yuegangbeilu悦港北路0Liangjiang
/Yuegang Ave.悦港大道0.940.94
/Chunxuan Ave.椿萱大道1.222.16
/Central Park West中央公园西Line 101.283.44
/Lujiagou鲁家沟1.274.71
/Ganyue Ave.甘悦大道0.925.63
/Yuhegou玉河沟0.966.59
/The EXPO Garden Center园博中心2.358.94
/Danhe丹鹤1.3710.31
/Huxiajie湖霞街1.4711.78
/Chongguang重光151.4913.27
/Hemulu和睦路2.4115.68
/Renhe人和1.4017.08
/Xingfu Square幸福广场1.9419.02
/Ranjiaba冉家坝Line 6 Loop line2.5521.57
/Dalongshan大龙山Line 61.0122.58
/Dashiba大石坝42.4725.05
/Zhongshutuo忠恕沱0.8625.91
/Hongyancun红岩村Line 91.2827.19Yuzhong
/Xietaizi歇台子Line 1 Line 181.6628.85Jiulongpo
/Shiqiaopu石桥铺Line 1 271.5630.41
/Shixinlu石新路1.1131.52
/Bashan巴山1.0232.54
/Fengxilu凤西路1.8134.35Shapingba
Through-service to/from Tangjiatuo via Loop line
/Chongqing West重庆西站Loop line Chongqing West railway station CXW2.7537.10Shapingba
/Huayan Temple华岩寺0.9738.07Jiulongpo
/Huachenglu华成路2.0240.09
/Banshan半山0.8640.95
/Zhongliangshan中梁山1.5842.53
/Jinjianlu金建路1.9144.44
/Huayan Center华岩中心1.5045.94
/Tiaodeng跳磴Jiangtiao line Line 182.3848.32Dadukou
Through-service to/from Shengquansi via Tiaodeng via Jiangtiao line

Jiangtiao line

Jiangtiao line (Chinese: 江跳线) had been formerly known as the extension of Line 5. The section from Tiaodeng to Shengquansi (28.22 km (17.54 mi) in length) opened in August 2022. The section from Shengquansi to Dingshan (4.524 km (2.811 mi) in length) is currently under construction.