Line 7 of the Beijing Subway (Chinese: 北京地铁7号线; pinyin: běijīng dìtiě qīhàoxiàn) is a rapid transit line in Beijing. It runs parallel and to the south of Line 1 and Batong line, from the Beijing West railway station in Fengtai District to Universal Resort in Tongzhou District. Like Line 6, Line 7 provides additional relief to the overcapacity Line 1 adding another east–west trunk line to the Beijing Subway network. The line uses 8-car Type B trains. Line 7's color is beige.

Stations

List of stations from west to east.

Station NameConnectionsNearby Bus StopsDistance kmLocation
EnglishChinese
Beijing West railway station北京西站9 Sub-Central China Railway Beijing West railway station BXP3 9 21 40 50 52 53 62 67 89 109 122 129 142 143 144 309 320 339 349 387 394 410 414 616 663 820 836 890 890区 917 917快 941 941快 968 982 997 快速直达专线52 夜5 夜8 夜23 夜36 专7 专138 专1910.0000.000Fengtai
Wanzi湾子6 38 45 46 53 57 69 76 85 89 109 122 133 137 390 410 414 477 快速直达专线86 快速直达专线154 夜7 专1380.9350.935Xicheng
Daguanying达官营166 38 45 46 53 57 69 76 80 85 109 122 133 137 390 410 477 快速直达专线94 夜7 专27 专138 专154 专1910.7341.669
Guang'anmen Nei广安门内19 (Out-of-system interchange via Niujie)5 6 19 38 40 50 57 76 78 109 133 381 676 快速直达专线86 快速直达专线154 夜71.8743.543
Caishi Kou菜市口45 6 48 57 83 102 105 109 144 381 夜4 夜7 专131.3744.917
Hufangqiao虎坊桥5 6 7 14 15 23 34 48 57 66 102 105 夜70.8855.802
Zhushikou珠市口82 5 23 48 57 59 66 93 120 141 622 观光1 夜2 夜71.2057.007Dongcheng / Xicheng
Qiaowan桥湾23 57 137 夜70.8697.876Dongcheng
Ciqi Kou磁器口517 23 39 41 57 60 84 106 128 137 599 夜7 夜24 夜281.0168.892
Guangqumen Nei广渠门内8 12 23 57 快速直达专线6 夜71.13810.030
Guangqumen Wai广渠门外23 57 312 637 夜7 夜29 专87 专1651.33211.362Dongcheng / Chaoyang
Shuangjing双井1023 28 54 57 72 98 300 300快 312 348 368 402 637 669 687 805快 848 938快 快速直达专线85 快速直达专线192 通医专线4 夜7 夜29 夜30 专10 专87 专1651.24112.603Chaoyang
Jiulongshan九龙山1411 23 35 54 312 348 486 513 561 605 669 973 985 快速直达专线85 快速直达专线192 通医专线4 夜7 夜25 夜29 专871.31113.914
Dajiaoting大郊亭11 23 31 35 138 312 348 400 400快 439 455 513 561 657 669 803 810快 865 快速直达专线85 快速直达专线174 快速直达专线192 夜29 夜340.78114.695
Baiziwan百子湾11 23 31 35 138 312 439 455 513 561 669 810快 快速直达专线85 快速直达专线174 快速直达专线192 夜29 专710.86515.560
Huagong化工5610.90316.463
Nanlouzi Zhuang南楼梓庄31 34 41 348 457 486 535 561 637 657 通医专线4 夜19 夜341.46417.927
Happy Valley欢乐谷景区31 41 561 通医专线4 夜34 专1660.90618.833
Fatou垡头348 457 486 561 637 夜19 专1661.67920.512
Shuanghe双合348 457 486 561 637 夜191.30421.816
Jiaohua Chang焦化厂348 457 486 637 638 夜191.02122.837
Huangchang黄厂348 457 专1701.67824.515
Langxinzhuang郎辛庄363 411 657 专1711.75226.267
Heizhuanghu黑庄户397 5322.51728.784
Wanshengxi万盛西552 649 T11 T12 T15 T25 T68 T68区 T872.96131.745Tongzhou
Wanshengdong万盛东342 372 913 T7 T10 T18 T65 T109 T116 T118 通医专线92.11033.855
Qunfang群芳435 T1121.16035.015
Gaoloujin高楼金589 T4 T53 T62 T68 T102 T1121.19536.210
Huazhuang花庄Batong589 806 T14 T34 T40 T43 T53 T68 T72 T73 T90 T101 T102 T1161.42537.635
Universal Resort环球度假区Batong589 T1161.76939.404
  • Huangchang Station
  • Qiaowan Station
  • Hufangqiao Station
  • Daguanying Station

Planning

Line 6 was originally conceived in 1973 as a "pan-handle" shaped route incorporating the central sections of today's Lines 6 and 7. In 1983 Line 6 was dissolved into two distinct lines. The section under Guang'anmen, Luomashi, Zhushikou and Guangqumen Streets and the "handle" branch to Fengtai became Line 7. The rest of the loop with a new south eastern extension to what was at the time the Beijing Jiaohuachang (Coking Plant) complex became Line 6. Line 7 was later revised westward to terminate at a new major railway station called Beijing West railway station and Line 9 taking over servicing Fengtai. When Beijing West railway station started construction in the early 1990s space was set aside for a subway station allowing Cross-platform interchange for the future Lines 7 and 9. By 1993 the planned section of Line 6 heading to Jiaohuachang was revised as an eastern extension of Line 7, forming the alignment built today.

Line 7 was originally slated to have 15 stations, from the Beijing West railway station to Baiziwan. A revised plan approved by the Planning Committee of the Beijing Municipal government called for 21 stations over 23.7 km (14.7 mi), ending in Jiaohuachang.

In 2013, planners revised the design of Line 7 from using the standard 6 car trains to 8 car trains after performing a detailed transport study of the Fatou area. Fatou's population projections were upgraded from 100,000 to 220,000 people and be a significant employment hub in the future. Planners decided that 6 cars trains would have insufficient capacity for the new demand projections. Line 7 was originally planned to use 1500 V DC overhead lines to power the longer subway trains. However, the already completed platforms at Beijing West railway station assumed the line would use a 750 V DC 3rd rail system like Beijing's legacy subway lines and built with vertical clearance for such. The line ultimately used a 1500 V DC 3rd rail system as a compromise.

In 8 July 2022, an EIA document regarding Phase III construction of Beijing rail transport system (2022–2027) announced the Phase III of Line 7, from Beijing West Railway station to Wanshousi, it will be a 6.4 km long section with 4 new stations. These are confirmed in the tender announcements published on 8 July 2024.

History

Phase 1

Construction began in January 2010. It started test runs in September 2014 with full operation beginning on December 28, 2014.

Eastern extension (Phase 2)

The eastern extension runs through Chaoyang and Tongzhou Districts. The extension adds 9 new stations and 16.6 km (10.3 mi) of new line. The extension is fully underground. It was opened on December 28, 2019. Universal Resort station opened on August 26, 2021.

Timeline

  • January 8, 2008: Plans for Line 7 reported in the media. Construction scheduled to begin by the end of the year.
  • October 30, 2008: Line 7 route plan with 23 stations receive regulatory approval. Construction still scheduled to begin by end of the year.
  • July 19, 2009: Construction on Line 7 announced to begin in late August 2009.
  • November 6, 2009: Commencement of Line 7 construction deferred to 2010.
  • January 19, 2010: Construction reportedly begun along Guangqu Road near the easternmost section of the line.
  • December 28, 2014: Operations of Phase I of Line 7 begin, except for Shuangjing station and Fatou station.
  • December 30, 2018: An infill station of Phase I, Fatou station was opened.
  • December 28, 2019: Operations of Phase II of Line 7 begin, except for Universal Resort station. An infill station of Phase I, Shuangjing station was opened.
  • August 26, 2021: Extended to Universal Resort station.
SegmentCommencementLengthStation(s)Name
Beijing West Railway Station — Jiaohuachang28 December 201423.7 km (14.7 mi)19Phase 1
Fatou30 December 2018infill station1
Shuangjing28 December 2019infill station1
Jiaohuachang — Huazhuang16.6 km (10.3 mi)8Phase 2 (Eastern extension)
Huazhuang — Universal Resort26 August 20211

Rolling Stock

ModelImageManufacturerYear builtAmount in ServiceFleet numbersDepot
BD32Beijing Subway Rolling Stock Equipment20136807 001–07 068Jiaohuachang Zhangjiawan

External links