Line 1 of the Beijing Subway (Chinese: 北京地铁1号线; pinyin: Běijīng dìtiě yīhào xiàn) is the oldest and one of the busiest lines of Beijing's mass transit rail network. The line runs underneath Chang'an Avenue, the city's grand east–west thoroughfare, right through the heart of Beijing with stops on either side of Tiananmen Square. Line 1's color is dark red. Through operation with the Batong line started on August 29, 2021.

Ridership

As the oldest line of the Beijing Subway, Line 1 was also the most heavily used from the time the subway opened in 1971 until January 2013, when the near-completion of the Line 10 loop caused ridership on that line to surge past Line 1. Daily ridership averaged 1,234,900 in 2014. Peak ridership in 2014 was 1,536,900.

Recent traffic relief efforts have been completed in recent years. The opening of the first phase of the parallel Line 6, caused an 8.46% decrease in daily demand and a 10-20% reduction in peak flow during rush hour. In addition Beijing BRT line 2 parallels the eastern section of Line 1. In the meantime between 2014 and 2015, Line 1 again upgraded its signals to a communications-based train control system allowing trains to run at headways as low as 1 minutes 45 seconds. However, during peak hours, sections of the line were reported in 2013 to still operate above 100% capacity.

Hours of operation

The first east-bound trains departs from Gucheng at 4:58am and Pingguoyuan at 5:10am. The first west-bound train departs Sihui at 4:56am and Sihui East at 5:05am. The last east-bound train leaves Pingguoyuan at 10:55pm. The last west-bound train leaves Sihui East at 11:15pm.

Route

Line 1's western terminus is Pingguoyuan, located in Shijingshan District. The line heads southeast to its second stop at Gucheng and from there runs straight east, following Chang'an Avenue all the way to its eastern terminus, Sihuidong in Chaoyang District, just beyond the 4th Ring Road. The line passes through Xidan, Wangfujing and Dongdan, among other important commercial centers of Xicheng and Dongcheng Districts, as well as the Beijing CBD near the China World Trade Center. The line is 31.04 km (19.29 mi) in length with 23 stations in operation. All stations except for Sihui and Sihuidong are underground.

Stations

Station list for Line 1 and Batong line of Beijing Subway, after the through operation started on August 29, 2021.

● Normal: Yuquan LuUniversal Resort ● Morning rush hour: GongzhufenGuoyuan ● Evening rush hour: Yuquan LuGuoyuan

Line NameService routesStation NameConnectionsNearby Bus StopsDistance kmLocation
vte
EnglishChinese
Line 1Fushouling (Opening date to be determined)福寿岭Shijingshan
Pingguoyuan (Under renovation, re-opening May 31, 2026)苹果园6 S1325 336 358 370 396 399 472 527 597 892 920 929 931 932 941快 948 961 972 977 977快 981 快速直达专线142 快速直达专线150 M3 M4 M5 M6 M7 M11 M16 M20 M220.0000.000
Gucheng (Closed, re-opening May 31, 2026)古城318 327 337 399 597 941 958 959 992 快速直达专线208 快速直达专线213 快速直达专线222 夜5 专61 专198 专210 专2182.6062.606
Bajiao Amusement Park (Under renovation, re-opening May 3, 2027)八角游乐园325 337 373 436 472 527 574 597 598 663 914 941 959 965 992 夜5 专46 专86 专91 专111 专2151.9214.527
Babaoshan (Closed, re-opening May 31, 2026)八宝山1 76 337 373 527 546 574 597 610 914 941 951 961 979 快速直达专线187 夜1 专69 专109 专111 专150 专2151.9536.480
Yuquan Lu玉泉路1 76 78 337 338 354 370 373 389 436 452 463 472 473 481 507 610 612 644 941 941快 979 夜1 专111.4797.959
Wukesong五棵松1 64 76 97 337 370 400 400快 436 568 624 952 967 982 983 夜1 专1271.8109.769Haidian
Wanshou Lu万寿路1 32 33 64 68 76 77 89 308 335 337 370 624 627 夜1 夜51.77811.547
Gongzhufen公主坟101 32 33 40 52 62 64 68 74 76 77 89 94 134 300 300快 308 323 335 337 368 370 394 437 603 624 631快 698 977 977快 夜1 夜5 夜301.31312.860
Military Museum军事博物馆91 21 40 52 68 78 85 94 308 414 夜1 夜5 夜8 专71.17214.032
Muxidi木樨地16 (out-of-system interchange)1 21 32 52 68 78 85 94 114 308 320 夜1 夜81.16615.198Xicheng
Nanlishi Lu南礼士路1 3 10 15 19 46 49 52 56 夜1 夜81.29116.489
Fuxingmen复兴门2 19 (Out-of-system interchange via Taipingqiao)1 10 15 44 49 52 200 332 387 395 423 691 快速直达专线17 快速直达专线201 夜1 夜20 专1910.42416.913
Xidan西单41 7 15 22 52 83 88 102 105 109 143 快速直达专线17 夜1 夜41.59018.503
Tian'anmenxi天安门西1 5 52 观光1 观光2 夜11.21719.720
Tian'anmendong天安门东1 2 52 82 120 观光1 观光2 夜1 夜20.92520.645Dongcheng
Wangfujing王府井81 41 52 103 120 141 观光2 夜10.85221.497
Dongdan东单51 41 52 104 106 108 110 111 120 128 140 684 夜10.77422.271
Jianguomen建国门21 24 39 44 52 58 120 122 126 139 140 142 200 403 637 638 639 夜1 夜19 夜20 夜24 夜28 夜291.23023.501
Yong'an Li永安里171 9 28 39 58 120 126 140 403 639 668 夜1 夜241.37724.878Chaoyang
Guomao国贸101 9 11 28 57 58 72 98 113 348 368 382 388 402 405 488 561 650 666 667 668 669 687 804 805快 806 807 809 814 817 818 818快 848 930 938快 快速直达专线5 快速直达专线9 快速直达专线20 快速直达专线61 快速直达专线69 快速直达专线169 夜1 夜27 夜30 专100.79025.668
Dawang Lu大望路141 11 31 54 57 58 138 382 388 405 486 605 666 667 668 804 812 815 815快 817 818 818快 823 930 973 985 988 快速直达专线5 快速直达专线20 快速直达专线61 夜1 夜25 夜27 夜34 专1651.38527.053
Sihui四惠1 54 57 58 322 397 405 455 468 475 496 506 517 553 605 657 666 671 865 988 989 夜1 夜27 专113 专1671.67328.726
Sihuidong四惠东397 468 475 506 517 553 666 夜271.71430.440
Batong lineGaobeidian高碑店363 397 475 506 517 666 夜271.37531.815
Communication Univ of China传媒大学397 475 506 666 夜27 专36 专1562.00233.817
Shuang Qiao双桥382 397 411 451 475 506 666 夜271.89435.711
Guaanzhuang管庄364 388 442 532 615 666 690 BRT2(快速公交2) 夜27 专39 专2111.91237.623
Bali Qiao八里桥322 615 666 668 807 夜271.76339.386
Tongzhou Beiyuan通州北苑316 317 322 372 591 615 666 667 804 805 806 809 810 811 861 924 938 快速直达专线1 快速直达专线147 快速直达专线174 快速直达专线195 快速直达专线196 T1 T2 T3 T4 T10 T11 T12 T13 T19 T41 T43 T51 T60 T87 T90 T103 T118 夜27 专1571.70041.086Tongzhou
Guoyuan果园312 316 317 552 591 668 805 938 快速直达专线1 快速直达专线147 快速直达专线166 快速直达专线195 T10 T11 T12 T19 T26 T36 T41 T44 T68 T68区 T87 T103 T118 夜291.46542.551
Jiukeshu九棵树372 582 587 668 805 810 938 快速直达专线1 T5 T7 T9 T10 T13 T14 T17 T21 T25 T26 T40 T41 T43 T44 T45 T62 T64 T65 T68 T71 T72 T73 T87 T90 T101 T102 T103 T113 T1170.99043.541
Liyuan梨园342 372 587 589 668 805 806 810 913 938 快速直达专线1 快速直达专线166 T5 T7 T9 T10 T13 T14 T17 T18 T21 T26 T34 T40 T41 T43 T50 T53 T62 T64 T65 T68 T72 T73 T90 T101 T102 T103 T1091.22544.766
Linheli临河里435 587 589 591 806 810 924 938 快速直达专线166 T4 T5 T9 T13 T14 T17 T21 T26 T34 T38 T40 T41 T43 T50 T53 T62 T64 T68 T72 T73 T90 T101 T102 T107 T116 T118 专173 专2031.25746.023
Tu Qiao土桥435 591 805 806 807 810 910 924 938 快速直达专线166 快速直达专线167 快速直达专线195 T5 T6 T9 T13 T14 T17 T21 T26 T34 T38 T40 T41 T43 T50 T64 T72 T73 T90 T101 T103 T105 T107 T108 T112 T115 T116 T1180.77646.799
Huazhuang花庄7589 806 T14 T34 T40 T43 T53 T68 T72 T73 T90 T101 T102 T1162.23849.037
Universal Resort环球度假区7589 T1161.86350.900
vte

Gucheng and Baboshan stations are closed to faciliate works for Line 1 Branch. It is expected to reopen by the end of May 2026.

History

Yuquan Lu station, Opened on August 5, 1971. The first phase of the Beijing subway project groundbreaking ceremony was held west of Yuquanlu Road.

The first section of subway in Beijing officially started trial operation on January 15, 1971. It was 10.7 km (6.6 mi) long and ran between Beijing railway station to Gongzhufen, which today is a section of Line 1 and 2. A few months later, on August 15, 1971, the line was extended 3 stations west, to Yuquan Lu. The line was extended again to Gucheng in November. On April 23, 1973, the line was extended Pingguoyuan, at this point the line is 23.6 km (14.7 mi) long with 17 stations. On September 15, 1981, the line was again extended westward to Fushouling creating a 27.6 km (17.1 mi) long line with 19 stations. The line was transferred to the newly created Beijing Mass Transit Operation Corporation and was officially opened to the public, ending the decade long trial operation period. By 1981, the annual passenger volume of Beijing Subway was 64.66 million passengers, with a daily average of 177,000 passenger trips.

On August 15, 1986, the second phase of subway construction started and a feasibility study on the construction of the new line between of Fuxingmen to Bawangfen (Today's Beijing CBD) was carried out. A new branch heading east to a new station, Fuxingmen, was completed between Nanlishi Lu and Changchun Jie stations on December 28, 1987. The section between Changchun Jie and Beijing railway station was transferred to the newly created Line 2 and Line 1 ran between Pingguoyuan and Fuxingmen stations. In January 1991, the feasibility study report on the construction of a new line between Fuxingmen to Bawangfen was approved with construction of the new "Fuba line", starting in June 1992. On December 12, 1992, Line 1 was extended east for one station to Xidan. In 1994, Line 1's signals were upgraded to automatic train protection system. On September 28, 1999, the first section of the Fuba line between Tian'anmenxi to Sihuidong was opened. On June 28, 2000, the section between Xidan and Tian'anmenxi stations opened, merging Line 1 and the Fuba Line to create a 31 km (19 mi) line with 23 stations.

SegmentCommencementLengthStation(s)Name
Gongzhufen — Beijing Railway Station15 January 197110.7 km (6.65 mi)10Phase 1 (initial section)
Yuquan Lu — Gongzhufen5 August 19714.9 km (3.04 mi)3Yuquan Lu extension
Gucheng — Yuquan Lu7 November 19715.4 km (3.36 mi)3Gucheng extension
Pingguoyuan — Gucheng23 April 19732.6 km (1.62 mi)1Pingguoyuan extension
Nanlishilu — Fuxingmen28 December 19870.4 km (0.25 mi)1Line 1 & 2 realignment project
Changchun Jie — Beijing Railway Station−6.1 km (−3.79 mi)-6
Fuxingmen — Xidan12 December 19921.6 km (0.99 mi)1Xidan extension
Tian'anmenxi — Sihuidong28 September 199910.1 km (6.28 mi)10Fuba line
Xidan — Tian'anmenxi28 June 20001.3 km (0.81 mi)2Line 1 & Fuba line merging project
Line 1 train at Wangfujing in 2007.In 1992, Line 1 was extended east one station to Xidan.Platform of Tian'anmen East station

Headway Reduction

Since 2014, the signaling and power systems has been gradually upgraded to allow for trains to run more frequently. The upgraded CBTC moving block signaling system in place today reduces rush hour headways from every 2 minutes and 5 seconds to 1 minute 45 seconds.

Platform screen doors

In 2017, platform screen doors were installed on the platform of Line 1.

Due to platform congestion and suicides, a proposal was made in 2010 to refit all stations on Line 1 with platform screen doors. However, the ventilation system in the older stations of Line 1 was incompatible with full-height platform screen doors, so half height platform screen doors were chosen instead. In July 2016, the operator began installing platform screen doors on Line 1. In 2016, the platform screen doors was installed at Yong'anli station. By the end of 2017, all stations except Pingguoyuan were retrofitted with half-height platform screen doors, and all the screen doors were put into operation for the first time.

Through operations with the Batong line

Route display reserved for through service from Pingguo Yuan to Universal Resort

In 2010, a CPPCC member Chen Dingwang, proposed that services on Line 1 and the Batong line should directly link, with through operations, reducing travel times and removing the unnecessary forced transfers at Sihuidong or Sihui. However, the Beijing Subway responded that Line 1's and Batong's signal systems are completely different, so through-operation will be more difficult to achieve, from an engineering standpoint. As of 2016, preliminary design and feasibility studies are underway to allow for through operations between Line 1 and Batong. On June 12, 2020, the project of the through operation of Line 1 and Batong line was approved by Beijing Development and Reform Commission. Through operation with the Batong line started on 29 August 2021.

Other facilities

Rolling stock for Line 1 is parked and maintained at Gucheng Depot and Sihui Depot.

Restricted stations

Beyond Pingguoyuan, Line 1 extends further northwest where it has several other stations: Station 53 (53站) and Fushouling (福寿岭). Station 53 is in the military region. Fushouling station is outside the military region and originally opened for rapid train for Subway Technology Collage students nearby, but closed as rapid train terminated in 2007. These stations are not open for public use.

Fushouling station began to renovate in 2021 as part of Line 1 west extension plan, and as part of Fushouling Transit Terminal. The renovation of the station was completed in 2024, but the opening date is yet to be determined, due to delay of the construction of transit terminal, and potential impact of closure of Bajiao Amusement Park station due to Line 1 branch construction.

A proposal to open the Station 53 to public is mentioned within 2022 and 2023 working plan of the Shijingshan District.

Future Development

Increasing capacity

The platforms of some Line 1 stations are longer than the trains used on the line.

Due to Line 1's severe overcapacity problem, there are plans to introduce 7-car or longer trains. In order for this plan to proceed the oldest section of Line 1 between Pingguoyuan and Nanlishi Lu, which only has platforms long enough to accommodate 6-car trains, will need to be lengthened. The newer section between Fuxingmen and Sihuidong, formerly known as "Fuba line" during construction, has platforms long enough for 8-car trains. According to an interview to the director of Beijing Municipal Transport Commission in December 2022, they will introduce 7-car trains in the eastern section of Line 1 and the Batong line in future. However, the plan was later delayed indefinitely after through service between Line 1 and Batong Line begins, and the difficulties of lengthening platforms in Batong Line, which also only able to accommodate 6-car trains.

Branch to Qinglonghudong

On 8 July 2022, an EIA document regarding Phase III construction of Beijing rail transport system (2022–2027) mentions a proposal about the branch line of Line 1. The branch line is a southwest-to-northeast line starts from Qinglonghudong (located at the east side of Qinglong Lake, in Wangzuo Town, Fengtai District) to Bajiao Amusement Park in Shijingshan District. It will be 21 km (13 mi) in length with 9 new stations. Construction on the Line 1 branch began on January 18, 2024.

To facilitate construction of the extension, the project will need to renovate and expand Bajiao Amusement Park Station. According to the second announcement of the environmental impact assessment of the Line 1 branch line project released in October 2023, this station will be a new platform for the branch line of Line 1, and the new platform will be combined with the existing Line 1 platform to form a separate island platform, so that the station will become a double-island station. Since June 2, 2025, the station was closed for this renovation work, and it is expected to reopen on May 3, 2027.

Station nameConnectionsLocation
EnglishChinese
Bajiao Amusement Park八角游乐园1 (Main line)Shijingshan
Yamenkouxi衙门口西
Garden Expo Park West Gate园博园西门Fengtai
Zhangguozhuang张郭庄14
Beigong北宫
Houlücun railway station后吕村
Feihang Yungang飞航云岗
Wangzuo王佐
Weigezhuang魏各庄
Qinglonghudong青龙湖东

Rolling Stock

The line uses 6-car Type B rolling stock.

Current

ModelImageManufacturerYear builtYear refurbishedAmount in ServiceFleet numbersDepot
DKZ4G[zh]CRRC Changchun Railway Vehicles Beijing Subway Rolling Stock Equipment1998–20012007 2010-2012 2015-2016 2020-202131S401–S431 (01 001–01 031)Sihui[zh] (except two in Gucheng[zh])
SFM04/04A[zh]CRRC Qingdao Sifang Beijing Subway Rolling Stock Equipment2006–2011202139G432–G470 (01 032–01 070)Gucheng
SFM01/02/07[zh]2003–20052008 2015-2020 2021108TQ401–TQ408, TQ415–TQ424 (01 071–01 078, 01 085–01 094)Tuqiao[zh]
BDK06[zh]Beijing Subway Rolling Stock Equipment2018–202172TQ431–TQ437 (01 101–01 107), 01 108–01 112Tuqiao, Sihui
BDK09Beijing Subway Rolling Stock Equipment2025–20261Tuqiao, Sihui

Former

All were based at Gucheng depot.

ModelImageManufacturerYear builtYears in serviceNumber MadeFleet numbers (Before 1996)Fleet numbers (After 1996)Notes
DK1[zh]CRRC Changchun Railway Vehicles1967—N/a2001–002—N/aTest train, not for revenue service.
DK2[zh]1969–19701969–198580201–219—N/a76 cars were refurbished into DK11.
DK3/3G[zh]1971–19731971-200250UnknownG101–G107Transferred to line 13 and Batong line.
DK8[zh]1982Unknown52401–413—N/aTransferred to line 2.
DK11[zh]1984–19851984–200876601–619G201–G207, G2082–G2085, G209–G213
DK20/20G[zh]1994–19951994–201242443–449G108–G114Originally retired in 2008, reactivated due to DKZ4 trains being overhauled.
BD1[zh]Beijing Subway Rolling Stock Equipment1990–19921990–1994183083–3084, 309–311—N/aTransferred to line 2.
BD2/2G[zh]1994–19981995–201272450–454 (first batch only)G115–G126Originally retired in 2008, reactivated due to DKZ4 trains being overhauled.
BD3[zh]19951996–20012—N/aG2081, G2086Linked with DK11 cars G2082–G2085.

See also

Notes