Inside the train compartment of Line 4. It shares many design features with MTR trains

Line 4 of the Beijing Subway (Chinese: 北京地铁4号线; pinyin: běijīng dìtiě sìhào xiàn) is a subway line in Beijing's mass transit network. It entered into operation on 28 September 2009, and runs from north to south, parallel and to the west of Line 5, through Haidian, Xicheng, and Fengtai Districts in the western half of the city. It runs from Anheqiao North in the north and ends at Gongyixiqiao in the south, but the 4-Daxing connected line runs all the way to Tiangongyuan in Daxing. All stations are underground except Anheqiao North. It is 28.2 km (17.523 mi) long with 24 stations. Riding on this line starts from a fare of RMB(¥) 3.00 depending on the distance traveled. Line 4's color is teal.

Line 4 and the Daxing line operate as a single line through-running onto each other although they are classified as separate lines. Two different services are run during the day: A full service covering both Line 4 and the Daxing line, and a shorter service that ends at Xin'gong station, the first station of the Daxing line. Combined, the Line 4/Daxing Line Corridor carries an average of 1.24 million passengers every day in 2017, growing to about 1.4 million passengers per day by 2019.

Hours of operation

The first south-bound trains departs from Anheqiao North at 5:00 AM. The first northbound train departs from Gongyixiqiao at 5:10 AM. The last northbound train leaves Anheqiao North at 10:45 PM. The last southbound train leaves Gongyixiqiao at 11:10 PM. Each train completes the entire journey in 48 minutes.

Route

In the north, Line 4 begins in Anheqiao, just beyond the Summer Palace, and heads south past the Old Summer Palace, through the university district and Zhongguancun, Beijing's high-tech silicon village, before turning east at the National Library of China and passing the Beijing Zoo en route to Xizhimen. After entering the 2nd Ring Road at Xizhimen, Line 4 resumes southwards at Xinjiekou and traverses the old city through Xisi, Xidan, Xuanwumen, Caishikou, and Taoranting Park. It passes the city's high-speed rail link at the Beijing South railway station before reaching the terminus at Gongyixiqiao. Construction began in 2004 but delays have pushed back the opening date by two years to 28 September 2009.

Service routes

List of Stations

Diagram showing distinct line labels for the Daxing Line and Line 4 with through service.

Line 4 and Daxing line stations, from north to south:

Line NameService routesStation NameConnectionsNearby Bus StopsDistance kmLocation
vte
EnglishChinese
Line 4Anheqiaobei安河桥北305 437 575 6080.0000.000Haidian
Beigongmen北宫门303 332 346 384 394 563 584 601 观光3 夜81.3631.363
Xi Yuan西苑16129 303 331 332 333 346 384 393 394 432 437 438 476 508 534 563 579 584 601 610 636 644 671 686 688 夜81.2512.614
Yuanmingyuan Park圆明园129 331 424 432 438 508 579 601 观光31.6724.286
Peking Univ East Gate北京大学东门129 305 307 320 331 355 365 375 438 450 549 579 601 614 681 982 观光31.2955.581
Zhongguancun中关村26 302 305 307 320 332 355 365 384 392 400 400快 450 466 549 579 584 601 613 614 681 686 982 983 快速直达专线26 快速直达专线37 快速直达专线126 快速直达专线127 快速直达专线139 快速直达专线147 快速直达专线177 快速直达专线200 快速直达专线204 夜80.8876.468
Haidian Huangzhuang海淀黄庄10302 305 307 320 332 355 365 386 528 584 614 630 634 653 671 681 快速直达专线26 快速直达专线37 快速直达专线126 快速直达专线127 快速直达专线139 快速直达专线147 通医专线6 夜80.9007.368
Renmin Daxue (Renmin Univ.)人民大学1226 300 300快 302 305 320 323 332 355 361 365 368 425 549 584 614 651 653 658 695 921 快速直达专线139 夜8 夜301.0638.431
Weigongcun魏公村26 56 305 320 332 563 603 609 645 651 653 658 695 夜81.0519.482
Guojia Tushuguan (National Library)国家图书馆9 1656 86 92 129 305 320 332 481 563 609 653 658 695 夜81.65811.140
Dongwuyuan (Beijing Zoo)动物园7 15 16 19 27 56 87 102 103 105 107 111 129 305 332 334 347 360 360快 362 534 563 604 632 695 夜81.51712.657Xicheng
Xizhimen西直门2 13 Huairou–Miyun China Railway Beijing North railway station VAP7 16 21 26 27 44 69 80 87 105 111 200 305 332 347 360 362 375 387 534 563 604 618 632 651 686 693 快速直达专线201 夜8 夜20 专2161.44114.098
Xinjie Kou新街口7 47 105 111 508 夜361.02515.123
Ping'anli平安里6 194 7 13 22 38 47 88 105 107 111 118 143 409 夜3 夜4 夜361.10016.223
Xisi西四3 13 22 38 88 101 102 103 105 109 124 143 409 612 夜4 夜131.10017.323
Lingjing Hutong灵境胡同22 38 46 68 88 102 105 109 143 夜40.86918.192
Xidan西单11 7 15 22 52 83 88 102 105 109 143 快速直达专线17 夜1 夜41.01119.203
Xuanwu Men宣武门27 9 15 22 44 67 83 102 105 109 137 142 143 144 332 夜4 夜50.81520.018
Caishi Kou菜市口75 6 48 57 83 102 105 109 144 381 夜4 夜7 专131.15221.170
Taoranting陶然亭40 59 83 133 381 144 414 夜4 夜23 专13 专1551.20022.370
Beijing South railway station北京南站14 China Railway Beijing South railway station VNP Jingjin106 133 200 343 381 414 458 485 529 665 夜24 专18 专1551.64324.013Fengtai
Majiapu马家堡51 66 72 106 134 144 485 501 529 954 专1451.48025.493
Jiaomenxi角门西1030 51 72 144 474 501 529 646 954 快速直达专线160 专145 专2090.82726.320
Gongyi Xiqiao公益西桥377 400 474 511 556 602 646 685 825 954 990 快速直达专线160 专145 专2090.98927.309
Daxing lineXingong新宫19343 353 354 369 400 474 556 827 829 946 954 快速直达专线22 专59 专67 专190 专1992.79830.107
Xihong Men西红门381 454 470 474 483 646 829 937 993 快速直达专线131 兴13 兴14 兴42 兴66 兴68 兴71 兴79 兴91 专84 专97 专1695.10235.209Daxing
Gaomidianbei高米店北629 937 快速直达专线131 兴12 兴34 兴42 兴66 兴821.81037.019
Gaomidiannan高米店南913 937 快速直达专线131 快速直达专线175 通医专线10 兴11 兴53 兴66 专241.12838.147
Zaoyuan枣园410 631快 829 937 954 968 快速直达专线175 通医专线10 兴47 兴66 X101 X102 X104 X105 兴9401.09639.243
Qingyuan Lu清源路456 629 631快 829 913 934 954 968 969 快速直达专线175 快速直达专线188 通医专线10 兴23 兴24 兴26 兴27 兴28 兴30 兴33 兴35 兴37 兴48 兴53 兴54 兴66 X101 X105 X107 兴9401.20040.443
Huangcun Xidajie黄村西大街456 629 631快 829 840 913 934 954 968 快速直达专线175 快速直达专线188 通医专线10 兴11 兴14 兴14区 兴17 兴19 兴20 兴22 兴28 兴29 兴29区 兴31 兴31区 兴35 兴37 兴45 兴46 兴48 兴52 兴54 兴55 兴57 兴59 兴61 兴66 X105 X107 兴9401.21441.657
Huangcun railway station黄村火车站Huangcun railway station HCP 北京大兴站 IPP366 369 629 631快 829 913 957 968 969 快速直达专线136 快速直达专线175 快速直达专线188 兴12 兴13 兴15 兴16 兴18 兴20 兴21 兴22 兴25 兴29 兴29区 兴37 兴45 兴46 兴55 兴66 X1070.98742.644
Yihezhuang义和庄456 934 快速直达专线175 通医专线10 兴13 兴15 兴16 兴25 兴37 兴44 兴45 兴46 兴48 兴55 兴65 兴66 兴77 兴81 兴822.03544.679
Biomedical Base生物医药基地456 827 快速直达专线175 通医专线10 兴15 兴16 兴21 兴23 兴27 兴28 兴30 兴39 兴40 兴40区 兴41 兴44 兴46 兴48 兴52 兴53 兴54 兴55 兴55区 兴61 兴61区 兴64 兴65 兴66 兴68 兴77 兴80 兴81 兴82 X1022.91847.597
Tiangong Yuan天宫院456 827 829 940 快速直达专线15 快速直达专线175 通医专线10 兴11 兴21 兴23 兴27 兴28 兴30 兴39 兴40 兴40区 兴41 兴44 兴46 兴48 兴53 兴54 兴55 兴55区 兴61 兴61区 兴64 兴65 兴66 兴68 兴77 兴80 兴81 X102 X1081.81149.408
vte

Planning and construction

Plans for Line 4 date back to the 1950s when Beijing's first subway line was still under construction. It was planned to run from the Summer Palace, east towards Xizhimen, southeast to Zhongshan Park, terminating at the Beijing Stadium, which near today's Tiantandongmen Station. Ultimately, the section between Summer Palace to Xizhimen was built as planned. However, construction only formally started in 2004.

On 3 December 2004 Hong Kong's MTR Corporation, Beijing Infrastructure Investment Co., Ltd., and Beijing Capital Group Co., Ltd. signed the Beijing Metro Line 4, investment, construction, operation principle of cooperation agreement, making Line 4 the Mainland China's first rail transit line financed using a public-private partnership framework. On 7 February 2005, BJMTR initialled a Public-Private Partnership (PPP) Concession Agreement with Beijing Municipal Government for Line 4, and BJMTR is responsible for the line’s rolling stock, signalling, electrical and mechanical systems as well as its operation and maintenance. The concession period is 30 years starting from 28 September 2009 when revenue operation commenced . Subsequently, on 8 November 2005, a joint venture among the 3 companies was established. The Hong Kong MTRC will invest 735 million RMB to the construction of Line 4 and in return have the right to operate Line 4 for 30 years.

On 11 February 2009, the construction of Line 4 is nearing completion with all tunnels bored. On 6 March, four subway trains begin testing while Hong Kong's then Chief Executive, Donald Tsang, visited the project. On 28 September 2009, Line 4 was officially opened for trial operation. Bringing the number of subway lines in Beijing to 9. On 30 December 2010, the Daxing line started trial operation, with direct service into Line 4. Creating a 50 km (31.069 mi) long line with 35 stations.

In 2008, planners in Haidian District have proposed extending the line to the north by 8 km (5.0 mi) with four additional stations. The planned stations have been identified as Baiwangshan (百旺山), Xibeiwang (西北旺), Aerospace City West (航天城西), and Yongfeng (永丰). However, by June 2010, Line 4's northern extension was cancelled and replaced by the northern extension of Line 16 which opened in 2016.

SegmentCommencementLengthStation(s)Name
Anheqiaobei — Gongyi Xiqiao28 September 200928.2 km (17.523 mi)24(initial phase)
Gongyi Xiqiao — Tiangongyuan30 December 2010see Daxing line(through services)

Operation

Line 4 is a public-private partnership. Unlike the other lines of the Beijing Subway, which are completely state-owned and operated, Line 4 was built and is managed by the Beijing MTR Corp. Ltd., a three-way joint-venture among the Hong Kong MTR Corporation, the Beijing Capital Group ("BCG"), and the Beijing Infrastructure Investment Co. ("BIIC"). The Hong Kong MTR, which operates the Hong Kong Mass Transit Railway, and the state-owned BCG each holds a 49% stake in the venture and the BIIC has 2%. The JV is responsible for 30% of the investment capital to build Line 4, mainly to finance the purchase of electrical and mechanical equipment, while the Beijing Municipal Government provided the remaining 70%, to cover civil engineering, station, and track work costs. Beijing Capital Group is owned by the Beijing Municipal Government.

The Beijing government has also awarded the JV a concession to manage Line 4 for 30 years. The PPP JV model was designed to introduce private capital as well as advanced metro management methods to the growing Beijing Subway. Among the most visible differences in management of Line 4 is a ban on food and beverage consumption inside Line 4 trains and stations.

Rolling Stock

ModelImageManufacturerYear builtAmount in serviceFleet numbersDepot
SFM05CRRC Qingdao Sifang2008, 201073001–040 061–093Longbeicun Majiapu Nanzhaolu

External links

  • official site