Line 5 of the Beijing Subway (Chinese: 北京地铁5号线; pinyin: běijīng dìtiě wǔhào xiàn) is a rapid transit line that runs north to south through central Beijing. Line 5's color is maroon. It entered into operation on October 7, 2007. It runs for 27.6 km (17.1 mi) in a near straight line through the city center (just approximately one kilometre (0.62 mi) east of the Forbidden City at Dongdan) from Tiantongyuanbei in Changping District to Songjiazhuang in Fengtai District. Though Line 4 and Line 8 also broadly follow north-south routes (and so, in part, do Lines 14 and 13), Line 5 remains the only line to follow an almost entirely straight north-south course. Line 5 is also notable for including three stations in the densely populated northern suburb of Tiantongyuan, as well as providing convenient access to the Temple of Earth and Temple of Heaven. Since Line 5 connects with Line 1, Line 2 (twice), Line 6, Line 7, Line 10 (twice), Line 13, Line 14 and Line 15, and also links densely populated suburbs directly to the city center, it tends to experience very crowded conditions during rush hour and even very late into the evening. Over 1 million passengers use the line every weekday in 2019.

Line 5 entrance at Beixinqiao.

Hours of operation

The first south-bound trains departs from Tiantongyuan North at 4:59am. The first north-bound train departs from Songjiazhuang at 5:19am. The last south-bound train leaves Tiantongyuan North at 10:47pm. The last north-bound train leaves Songjiazhuang at 11:10pm. For the official timetable, see the reference.

Route

To the left is Tiantongyuannan station; a BRT route is visible in the center.

Line 5 runs in a North-South direction, beginning with three stations in the northern suburb of Tiantongyuan in Changping District, about 5 kilometres (3.1 mi) outside the 5th Ring Road. Then, it enters Chaoyang District and connects to Line 13 at Lishuiqiao. At Datunludong, it connects with Line 15. At Huixin Xijie Nankou, it links up with Line 10 Loop. Further south, it passes immediately to the east of the Temple of Earth and meets the Line 2 Loop at Yonghegong (Lama Temple). Then Line 5 cuts through the old areas of Dongcheng District. It connects with the East-West Line 6 at Dongsi, and the old foreign Legation Quarter between Dongdan and Chongwenmen. Further south, Line 5 stops at Tiantan Dongmen (Temple of Heaven East Gate), connects with the East-West Line 7, as well as Puhuangyu (connects with Line 14) and eventually reaches Songjiazhuang and Line 10 again, in Fengtai District.

Stations (North to South)

●: stop

▲: some SB PM peak trains skip

▼: some NB PM peak trains skip

Service RouteStation NameConnectionsNearby Bus StopsTravel TimeDistance kmLocation
EnglishChinese
Tiantongyuanbei天通苑北426 428 430 441 487 520 533 537 643 860 905 922 922区 933 966 984 BRT3(快速公交3) 昌27 昌27专 C110 C112 C114 C118 C120 C121 快速直达专线18 快速直达专线77 快速直达专线103 快速直达专线158 快速直达专线164 快速直达专线220 专35 专42 专117 专1370:000.0000.000Changping
Tiantongyuan天通苑18319 426 430 432 464 465 520 621 905 966 984 BRT3(快速公交3) 昌27专 快速直达专线60 专58 专104 专119 专133 专136 专1370:020.9390.939
Tiantongyuannan天通苑南301 319 426 430 432 464 465 520 558 621 905 966 984 BRT3(快速公交3) 昌27专 快速直达专线168 快速直达专线169 专580:040.9651.904
Lishui Qiao立水桥13301 319 426 430 464 465 558 617 621 628 905 966 984 BRT3(快速公交3) 昌27专 快速直达专线60 快速直达专线141 快速直达专线157 快速直达专线168 快速直达专线1690:061.5443.448Chaoyang
Lishuiqiaonan立水桥南319 464 465 617 620 621 628 905 966 快速直达专线60 快速直达专线157 快速直达专线183 专48 专81 专107 专164 专197 专2130:091.3054.753
Beiyuanlubei北苑路北141 319 415 430 464 466 484 569 593 596 617 620 653 695 905 快速直达专线183 夜26 专37 专1200:111.2866.039
Datunludong大屯路东15311 319 415 425 430 464 484 538 569 596 620 695 夜26 专400:153.0009.039
Huixin Xijie Beikou惠新西街北口18 84 379 386 400 400快 406 407 408 419 430 464 490 567 613 658 快速直达专线147 夜26 夜280:171.83810.877
Huixin Xijie Nankou惠新西街南口1095 125 361 430 464 515 921 944 夜260:191.12211.999
Heping Xiqiao和平西桥1275 95 117 125 300 302 328 361 368 430 464 547 601 604 607 641 671 921 快速直达专线178 夜26 夜300:211.02513.024
Hepingli Beijie和平里北街104 117 125 4300:231.05914.083Dongcheng
Yonghegong Lama Temple雍和宫213 18 44 75 84 115 117 125 130 142 200 夜200:261.15115.234
Beixinqiao北新桥Capital Airport13 82 84 106 107 115 117 135 6120:280.86616.100
Zhangzizhong Lu张自忠路3 4 13 82 84 106 113 115 118 夜3 夜340:300.79116.891
Dongsi东四658 84 101 106 109 110 128 夜130:321.01617.907
Dengshi Kou灯市口84 104 106 108 110 111 1280:340.84818.755
Dongdan东单11 41 52 84 104 106 108 110 111 120 128 140 夜10:360.94519.700
Chongwen Men崇文门28 9 12 17 24 29 39 41 44 60 63 84 103 104 106 108 110 111 128 137 142 599 622 夜5 夜19 夜24 夜280:380.82120.521
Ciqi Kou磁器口717 23 39 41 57 60 84 106 128 137 599 夜7 夜24 夜280:400.87621.397
Temple of Heaven East Gate天坛东门6 17 24 34 35 36 39 41 54 60 72 84 128 599 958 快速直达专线6 夜240:421.18322.580
Puhuangyu蒲黄榆1425 39 53 54 91 122 128 141 200 599 821 957 夜24 夜28 专161 专162 专2020:441.90024.480Fengtai
Liujiayao刘家窑2 7 12 39 50 51 54 93 139 300 300快 368 599 649 665 687 821 827 829 839 848 881 943 954 957 973 997 夜23 夜24 夜30 专2020:460.90525.385
Songjiazhuang宋家庄10 Yizhuang2 39 84 139 141 366 511 524 526 555 576 581 990 快速直达专线116 快速直达专线211 夜28 专62 专1890:481.67027.055
  • Beixinqiao Station
  • Hepingxiqiao Station
  • Zhangzizhonglu Station
  • Temple of Heaven East Gate station

Technology

Line 5 was the first subway line in Beijing to feature platform screen doors in underground stations and automatic platform gates in elevated stations that prevent riders from falling onto the tracks. Line 5 stations also have LCD screens that display the wait times for the next train. Line 5 trains have digital voice announcements (in Mandarin and English) and LCD passenger information displays.

Line 5 platform at Dongdan with platform screen doorsPlatform doors.Articulated, interconnected cars on Line 5.LCD inside Line 5 train.

History

Construction work on Line 5 got underway in late 2002 and the line opened to the public on October 7, 2007.

Timeline

Station entrance at Chongwenmen prior to Line 5's opening.
  • December 28, 2002: Construction on Line 5 began.
  • March 28, 2004: Tunneling started underneath Yonghegong Lama Temple and Hepingli Beijie stations, marking the start of Line 5 construction in urban Beijing. The tunnel would pass the Temple of Heaven.
  • May 20, 2004: The tunnel between Yonghegong Lama Temple and Zhangzizhonglu stations broke through.
  • November 11, 2005: Railway tracks were laid at Huixinxijie Beikou station.
  • July 2006: The entire underground railway was completed.
  • September 2006: Platform screen doors began installation in Line 5 stations.
  • April 2007: Line 5 started trial runs without passengers.
  • October 7, 2007: Line 5 opened to the public at 2p.m.
  • November 23, 2007: Sound insulation were installed on the elevated parts of Line 5 following complaints of excess noise from nearby residents.
SegmentCommencementLengthStation(s)Name
Songjiazhuang — Tiantongyuanbei7 October 200727.6 km (17.15 mi)23(initial phase)

Rolling stock

ModelImageManufacturerYear builtAmount in serviceFleet numbersDepot
DKZ13CRRC Changchun Railway Vehicles Beijing Subway Rolling Stock Equipment200661TP401–TP461Taipingzhuang Songjiazhuang